Download presentation
Presentation is loading. Please wait.
Published byEmerson Fewkes Modified over 10 years ago
1
New windows for the addition arrive in the dark
2
These go on the south wall
3
These are for the east wall in the basement
4
A conference on joining the two roofs
5
Starting to snow – driving snow from the west
6
The new ridge is in place, rafters next
7
That’s me at Gulag Carlow, behind bars
8
Look at the size of the snowflakes
9
Filling in the valley, Dave is pondering
10
The new entrance wall
11
Time to go home, Ryan has to listen to Dave’s hunting stories while Dave looks for deer
12
The door with 4 lites will be the new entrance door - 1895
13
Insulating the porch floor over the old concrete step
14
Roxul insulation bats on top of 2” SM sheathing
15
Simon waiting to go to work with me
16
Roofs are joined, entrance wall – door with sidelites
17
Close up the west end for the weekend
18
Mobile shop for all the bits and pieces of equipment
19
From the road on my way home
20
A little closer view – I’m pleased
21
This old window will go in the wall next to the entrance
22
It used to live here
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.