1
LVL along south wall acts as lintels for windows
2
2x6 strongback down the center
3
Nailed to the chase uprights for support
4
Installing the plywood floor
5
Sheets are glued and screwed to the joists
6
Putting together window frames
7
One of our suppliers – carpenters pencil
8
There’s something wrong with this slogan
9
Peter moving window frames with the Kubota
10
Assembling window frames – boy it’s cold!
11
East wall is full of windows – morning sun
12
Too windy for all the sheathing – lots of braces
13
Dressed for the cold winds, another section assembled
14
Windows and a gap for the entrance door system
15
Braces in every direction – partial sheathing
16
Critter proof ends for the drain tile – to be buried
17
LVL’s on the inside over the window openings - lintels
18
Sunrise at Bayfield on my way to work
19
Up goes the east end gable with sheating
20
Trusses are up and braced
21
Overhangs being installed on the gables
22
First row of sheathing
23
Quite the maze
24
East end
25
Top row of sheathing, south side
26
3” of SM – R 15 insulation – end joist
27
Wind is blowing, can’t hold the camera steady
28
Last light
29
Southeast corner – gotta go, windows arriving late!