Download presentation
Presentation is loading. Please wait.
Published byJaxson jay Oddy Modified over 10 years ago
1
Snowstorm, roads closed 3 days. Serious snowblowing equipment on site when we arrived Thursday morning.
2
A ray of sunshine
3
Typar on the outside, prepping the window openings
4
Traffic moving on the County Road in bright sunshine
5
First window installed in the addition
6
Second window
7
Snow everywhere but very pretty
8
Third window
9
Fourth window – all these face east
10
Fifth window – southeast corner
11
6 & 7 – awning windows
12
Typar moisture barrier on the exterior
13
Work truck at hand
14
8 & 9 installed – southwest corner
15
Windows 10 & 11
16
Window 12 – opened up the entrance doorway to clean out the interior of the additon
17
6 mil poly doorway (for now)
18
Starting to take shape
19
Cut off the old roof overhang
20
We’ll cut it up in movable pieces
21
Ryan cutting it into pieces
22
Soffit vents installed, Roxul insulation plugs the holes
23
The vents are stapled to the roof sheathing
24
Oscar staring down Ryan’s lunch
25
One of the boys created this sign
26
Hurricane clips installed to hold the trusses – new ceiling joists in the entrance
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.