Download presentation
Presentation is loading. Please wait.
Published byStephon Bouldin Modified over 10 years ago
1
RMS R83 Edition 3 Rev 0 ASCP Forum 24 Feb 2014 TSM CIVIL
2
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED 24/02/2014 TSM CIVIL
3
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED R83 History Ed3 Rev 0 – 07.11.13 – New Edition Ed2 Rev 8 – 11.10.10 Ed2 Rev 7 – 03.9.10 Ed2 Rev 6 – 23.3.07 – Basis for Comparison Ed2 Rev 5 – 21.08.03 Ed2 Rev 4 – 31.08.00 Ed2 Rev 3 – 13.08.99 Ed2 Rev 2 - 28.09.98 Ed2 Rev 1 – 15.04.98 Ed2 Rev 0 – 30.01.98 – Completely Revised R52 – Pre 1998 24/02/2014 TSM CIVIL
4
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED Categories General Materials Design Process Control End Product Steel Fibre Concrete (SFRC) Minimum Frequency Testing 24/02/2014 TSM CIVIL
5
24/02/2014 TSM CIVIL
6
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED 1. General – 7p 2 Materials – 10p 3. Design – 9p 4. Process Control – 61p 5. End Product Criteria -20p 6. SFRC – 4p 7. Testing Procedures 2p Annexures – 14p Total 122p 1. General – 2p 2 Materials – 3p 3. Design – 4p 4. Process Control – 19p 5. End Product Criteria 9p 6. Measurement & Pay 3p Annexures – 50p Total 94 p 24/02/2014 TSM CIVIL Ed 3 Rev 0 Ed 2 Rev 6 General- Table of Contents
7
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED A. Details of Work B. Measurement & Pay C. Schedule HP & WP D. Quality Systems E- K Not Used L. Min. Frequency of Testing M. Reference Docs. Annex 14p 1. Details of Work 2. Quality System 3. Technical Procedures 4. Min. Frequency of Testing 5. Definitions 6. Schedule HP & WP 7. Identified Records 8 Steel Fibre Concrete Annex 50 p 24/02/2014 TSM CIVIL Ed 3 Rev 0 Ed 2 Rev 6 General- TOC- Annexures
8
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED General RTA changed to RMS CRCP now included with R83 SFRC requirements moved into main document Technical Procedures relocated into main document Definitions & Abbreviations relocated into main document Term Sublot now adopted 24/02/2014 TSM CIVIL
9
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED General 24/02/2014 TSM CIVIL Definitions Old Spec 46 off - New Spec 80 off Examples: Changes
10
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED General 24/02/2014 TSM CIVIL Definitions Examples: Changes
11
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED General 24/02/2014 TSM CIVIL Definitions Examples: New Items
12
24/02/2014 TSM CIVIL
13
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED Materials 24/02/2014 TSM CIVIL Clause 2.2 – Combined Aggregates Guidance Only Refer Clause 2.3 Missing ??
14
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED Materials 24/02/2014 TSM CIVIL Clause 2.3 – Fine Aggregates 6
15
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED Materials 24/02/2014 TSM CIVIL Clause 2.3 – Fine Aggregates Only if > 20% Man Sand Definition Correct ??
16
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED Materials 24/02/2014 TSM CIVIL Clause 2.3 – Fine Aggregates
17
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED Materials 24/02/2014 TSM CIVIL Clause 2.4 – Coarse Aggregate
18
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED Materials 24/02/2014 TSM CIVIL Clause 2.4 – Coarse Aggregate N/A if material Drill & Blasted Only for recycled Agg Test single size from each source
19
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED Materials 24/02/2014 TSM CIVIL Clause 2.5 – Aggregate Tests
20
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED Materials 24/02/2014 TSM CIVIL Clause 2.5 – Aggregate Tests Source? If mix has natural sand is limit 0.10% or 0.15%??
21
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED Materials 24/02/2014 TSM CIVIL Clause 2.7 – Admixtures
22
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED Materials 24/02/2014 TSM CIVIL Clause 2.8 – Curing Compounds
23
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED Materials 24/02/2014 TSM CIVIL Clause 2.8 – Curing Compounds
24
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED Materials 24/02/2014 TSM CIVIL Clause 2.9 – Joint Sealant
25
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED Materials 24/02/2014 TSM CIVIL Clause 2.11 – Water
26
24/02/2014 TSM CIVIL
27
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED Design 24/02/2014 TSM CIVIL Clause 3.2 – Survey
28
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED Design 24/02/2014 TSM CIVIL Clause 3.2 – Survey
29
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED Design 24/02/2014 TSM CIVIL Clause 3.4 – Cementitious Content
30
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED Design 24/02/2014 TSM CIVIL Clause 3.4 – Cementitious Content What cementitious content do we get ?? Under Review- Refer Justin Moss presentation
31
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED Design 24/02/2014 TSM CIVIL Clause 3.5 – Strength
32
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED Design 24/02/2014 TSM CIVIL Clause 3.5 – Strength
33
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED Design 24/02/2014 TSM CIVIL Clause 3.6 – Consistence
34
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED Design 24/02/2014 TSM CIVIL Clause 3.6 – Consistence
35
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED Design 24/02/2014 TSM CIVIL Clause 3.7 – Other Attributes
36
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED Design 24/02/2014 TSM CIVIL Clause 3.7 – Other Attributes A least 1 slipform & 1 hand pour mix
37
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED Design 24/02/2014 TSM CIVIL Clause 3.8 – Nominated Concrete Mixes
38
24/02/2014 TSM CIVIL
39
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED Process Control 24/02/2014 TSM CIVIL Clause 4.1.2 – Tiebars
40
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED Process Control 24/02/2014 TSM CIVIL Clause 4.1.2 – Tiebars (ii) If 5 Bars per slab then spacing approx. 825 thus tolerance of 20% is +/- 165mm.; But if 9 bars per slab, then spacing approx. 410mm thus 20% tolerance is only 82mm. Achievable ??
41
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED Process Control 24/02/2014 TSM CIVIL Clause 4.1.2.2 – Location Tiebars
42
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED Process Control 24/02/2014 TSM CIVIL Clause 4.1.2.2 – Location Tiebars (ii) Two test lengths = 4 slabs per sublot (25lm = 6 slabs)
43
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED Process Control 24/02/2014 TSM CIVIL Clause 4.1.2.2 – Compaction Testing Tiebars
44
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED Process Control 24/02/2014 TSM CIVIL Clause 4.1.2.2 – Compaction Testing Tiebars
45
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED Process Control 24/02/2014 TSM CIVIL Clause 4.1.2.3 – Concrete Cover below Sawn Joints 4.1.2.3 This clause appears to be duplicate requirement as already tested under 4.1.2.2
46
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED Process Control 24/02/2014 TSM CIVIL Clause 4.1.3 – Dowels
47
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED Process Control 24/02/2014 TSM CIVIL Clause 4.1.8 – Splice Lengths
48
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED Process Control 24/02/2014 TSM CIVIL Clause 4.2.1 – Production Mixes
49
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED Process Control 24/02/2014 TSM CIVIL Clause 4.2.1 – Production Mixes
50
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED Process Control 24/02/2014 TSM CIVIL Clause 4.2.1.2 – Flex Beam
51
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED Process Control 24/02/2014 TSM CIVIL Clause 4.2.1.2 – Flex Beams
52
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED Process Control 24/02/2014 TSM CIVIL Clause 4.2.1.2 – Flex Beams
53
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED Process Control 24/02/2014 TSM CIVIL Clause 4.2.1.2 – Flex Beams
54
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED Process Control 24/02/2014 TSM CIVIL Clause 4.2.1.5 – Control Charts
55
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED Process Control 24/02/2014 TSM CIVIL Clause 4.2.1.5 – Control Charts Is this Upper limit 7% or 4%, ie: is this TF of total combined aggregates?
56
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED Process Control 24/02/2014 TSM CIVIL Clause 4.2.2 – Mixing, Transport, Consistence & Air AS 1379 Section 3- Plant & Equipment Section 4 – Production & Delivery (incld BatchTolerances) Appendix A – Uniformity of Mixing
57
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED Process Control 24/02/2014 TSM CIVIL Clause 4.2.2 – Mixing, Transport, Consistence & Air
58
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED Process Control 24/02/2014 TSM CIVIL Clause 4.2.2 – Mixing, Transport, Consistence & Air Eg Sample Set. 24 Cylinders, Say; 11 @ 34 Mpa 11 @ 36 Mpa 1 @ 30 Mpa 1@ 31 Mpa CV= 4.7 FAIL
59
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED Process Control 24/02/2014 TSM CIVIL Clause 4.2.2.6 – Consistence (Slump)
60
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED Process Control 24/02/2014 TSM CIVIL Clause 4.2.2.6 – Consistence (Slump)
61
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED Process Control 24/02/2014 TSM CIVIL Clause 4.2.2.8 – Forming Time
62
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED Process Control 24/02/2014 TSM CIVIL Clause 4.3 – Paving Concrete
63
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED Process Control 24/02/2014 TSM CIVIL Clause 4.3.4 – Temperature
64
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED Process Control 24/02/2014 TSM CIVIL Clause 4.3.4 – Temperature
65
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED Process Control 24/02/2014 TSM CIVIL Clause 4.3.6 – Texturing of Surface
66
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED Process Control 24/02/2014 TSM CIVIL Clause 4.3.6 – Texturing of Surface
67
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED Process Control 24/02/2014 TSM CIVIL Clause 4.3.6 – Texturing of Surface Option Transverse or Longitudinal
68
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED Process Control 24/02/2014 TSM CIVIL Clause 4.3.7 – Curing
69
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED Process Control 24/02/2014 TSM CIVIL Clause 4.3.7 – Curing
70
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED Process Control 24/02/2014 TSM CIVIL Clause 4.3.7 – Curing
71
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED Process Control 24/02/2014 TSM CIVIL Clause 4.3.7.2 – Application Rate
72
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED Process Control 24/02/2014 TSM CIVIL Clause 4.3.7.2 – Application Rate
73
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED Process Control 24/02/2014 TSM CIVIL Clause 4.3.7.2 Application Rate
74
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED Process Control 24/02/2014 TSM CIVIL Clause 4.4 Paving Trial
75
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED Process Control 24/02/2014 TSM CIVIL Clause 4.4 Paving Trial
76
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED Process Control 24/02/2014 TSM CIVIL Clause 4.4 Paving Trial
77
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED Process Control 24/02/2014 TSM CIVIL Clause 4.5.1Joint Cleaning & Sealants
78
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED Process Control 24/02/2014 TSM CIVIL Clause 4.5.1Joint Cleaning & Sealants
79
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED Process Control 24/02/2014 TSM CIVIL Clause 4.5.1 Joint Cleaning & Sealants
80
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED Process Control 24/02/2014 TSM CIVIL Clause 4.9 Traffic Islands & Medians
81
24/02/2014 TSM CIVIL
82
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED End Product 24/02/2014 TSM CIVIL Clause 5.2.1 Conformity for Compaction
83
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED End Product 24/02/2014 TSM CIVIL Clause 5.2.1 Conformity for Compaction
84
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED End Product 24/02/2014 TSM CIVIL Clause 5.2.1 Conformity for Compaction T381 Does not appear to exist ??
85
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED End Product 24/02/2014 TSM CIVIL Clause 5.2.1.1 Moulding & Testing Cylinders
86
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED End Product 24/02/2014 TSM CIVIL Clause 5.2.1.2 Core Specimens
87
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED End Product 24/02/2014 TSM CIVIL Clause 5.2.1.3 Frequency & Location Cores
88
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED End Product 24/02/2014 TSM CIVIL Clause 5.2.1.3 Frequency & Location Cores
89
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED End Product 24/02/2014 TSM CIVIL Clause 5.2.1.3 Frequency & Location Cores
90
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED End Product 24/02/2014 TSM CIVIL Clause 5.2.1.3 Frequency & Location Cores Grid Line spacing no longer equal
91
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED End Product 24/02/2014 TSM CIVIL Clause 5.2.4 Within-core Variability No Tie Bars cores tested.
92
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED End Product 24/02/2014 TSM CIVIL Clause 5.2.4 Within-core Variability
93
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED End Product 24/02/2014 TSM CIVIL Clause 5.2.4 Within-core Variability
94
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED End Product 24/02/2014 TSM CIVIL Clause 5.3.3 Core Strength Testing
95
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED End Product 24/02/2014 TSM CIVIL Clause 5.3.5 Correction Factors for Age and Shape
96
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED End Product 24/02/2014 TSM CIVIL Clause 5.4.2 Level Survey
97
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED End Product 24/02/2014 TSM CIVIL Clause 5.4.3 Thickness Assessment
98
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED End Product 24/02/2014 TSM CIVIL Clause 5.4.3 Thickness Assessment U = Unlimited.
99
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED End Product 24/02/2014 TSM CIVIL Clause 5.5.2 Longitudinal Profile T369 ARRB Walking Profiler
100
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED End Product 24/02/2014 TSM CIVIL Clause 5.5.2 Longitudinal Profile How does (C) work with (A)?
101
24/02/2014 TSM CIVIL
102
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED SFRC 24/02/2014 TSM CIVIL Clause 6.2.2 Fibre Dose Rate
103
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED SFRC 24/02/2014 TSM CIVIL Clause 6.2.2 Fibre Dose Rate
104
24/02/2014 TSM CIVIL
105
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED ANNEXURE L 24/02/2014 TSM CIVIL Minimum Frequency of Testing
106
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED ANNEXURE L 24/02/2014 TSM CIVIL Minimum Frequency of Testing
107
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED ANNEXURE L 24/02/2014 TSM CIVIL Minimum Frequency of Testing Could be every 3-4 days on major projects??
108
RMS R83 Ed 3 Rev 0- A LOOK AT WHAT’S CHANGED ANNEXURE L 24/02/2014 TSM CIVIL Minimum Frequency of Testing
109
24/02/2014 TSM CIVIL
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.