© 2011 Bentley Systems, Incorporated Big BIM for contractors Paul King Construction Solutions Manager
2
© 2011 Bentley Systems, Incorporated 2 | WWW.BENTLEY.COM Today's challenges for the industry Complex projects Tighter budgets and deadlines Internal and external collaboration Information overload Project risks. paul.king@bentley.com
3
© 2011 Bentley Systems, Incorporated 3 | WWW.BENTLEY.COM What do contractors want? Figure out what to build Optimise how to build Know who needs what, when and in what format Understand what got built Automate IT mobilisation paul.king@bentley.com Get details to site quickly and accurately Constructability and optioneering Comment, design review, costing, etc Payment claims and as-built information and data Minimise up-front time and money www.comitproject.org.uk/australia/
4
© 2011 Bentley Systems, Incorporated 4 | WWW.BENTLEY.COM Expectation Time Technology trigger Slope of enlightenment Trough of disillusionment Peak of inflated expectations Plateau of productivity Gartner hype cycle Managing the BIM hype
5
© 2011 Bentley Systems, Incorporated 5 | WWW.BENTLEY.COM 2D drawings and bits of paper Poor quality management 2D no is match for 4D, 5D, xD Poor decision-making support Very contractual Waste can be around 30%. What we usually do... Design Visualisations Material schedules Clash detection Coordination Design analysis Construction phasing Trade & work packages Coordination Buildability Optioneering Procure and Construct Operate and maintain Maintenance schedules Set up FM system Documents passed to operator Documents passed to building team 40% of design time is spent locating and validating information Entering information once and re- using it can reduce delivery time by up to 50% Poor communication between systems wastes 30% of costs paul.king@bentley.com
6
© 2011 Bentley Systems, Incorporated 6 | WWW.BENTLEY.COM 3D collaborative models 3D collaborative models BIM and IPD (whatever they mean..) Design Safe demolition Sustainability audits Knowledge management Hazardous material tracking Building cloning Etc, etc... Visualisations Material schedules Clash detection Life cycle analysis Coordination Design analysis 2D drawings Continued use of the model Models passed to building team Model data fed into other projects 3D collaborative models 3D collaborative models Construction phasing Trade & work packages Stage payments Coordination Buildability & access Health & safety 2D drawings Procure and Construct Operate and maintain Links to BMS Links to FM systems Links to product details Security systems Maintenance schedules Links to stock control Models passed to operator Models used by others as appropriate The process of generating and managing asset data during its life cycle paul.king@bentley.com
7
© 2011 Bentley Systems, Incorporated 7 | WWW.BENTLEY.COM The typical project Sydney Civil & infrastructure DGN Sydney Architecture RVT Perth Structural DWG Singapore Environmental PDF Brisbane Plant piping DGN London Electrical DWG Integrated and coordinated project Melbourne Mechanical DGN paul.king@bentley.com
8
© 2011 Bentley Systems, Incorporated 8 | WWW.BENTLEY.COM MechanicalStructure Architecture Electrical Furniture Combined model(s) A highly efficient way of working. Data granulated and structured Construction documentation from combinations of models Ownership remains with the originator Model file management with collaboration Federated models - federated industry The federated BIM model(s)
9
© 2011 Bentley Systems, Incorporated 9 | WWW.BENTLEY.COM paul.king@bentley.com The federated BIM model - architecture
10
© 2011 Bentley Systems, Incorporated 10 | WWW.BENTLEY.COM paul.king@bentley.com The federated BIM model - steel
11
© 2011 Bentley Systems, Incorporated 11 | WWW.BENTLEY.COM paul.king@bentley.com The federated BIM model - HVAC
12
© 2011 Bentley Systems, Incorporated 12 | WWW.BENTLEY.COM paul.king@bentley.com Interactive views
13
© 2011 Bentley Systems, Incorporated 13 | WWW.BENTLEY.COM ArchitectureStructuralMEP paul.king@bentley.com Big BIM or little BIM
14
© 2011 Bentley Systems, Incorporated 14 | WWW.BENTLEY.COM B uilding I nformation M odel R oad R ail U tilities B ridge W ater P ower C ommunications G IS... Big BIM or little BIM paul.king@bentley.com Big BIM or little BIM Asset lifecycle information modelling. MEP
15
© 2011 Bentley Systems, Incorporated 15 | WWW.BENTLEY.COM Industry obstacles to sharing McGraw-Hill paul.king@bentley.com
16
© 2011 Bentley Systems, Incorporated 16 | WWW.BENTLEY.COM So what do contractors need? Create, capture and use data from multiple sources Manage data from entire project (buildings & infrastructure) Ability to review and approve drawings and models Common data environment to ensure consistency Standard method and procedure Agreed roles and responsibilities All parties adhering to the methods, standards and systems. paul.king@bentley.com
17
© 2011 Bentley Systems, Incorporated 17 | WWW.BENTLEY.COM 1 year50+ years Operation ProcurementDisposal 3-5 years Expenditure on facility Time Detail designPlanningConcept Outline design Construction Handover BIM approach Best design/build approach with appropriate maintenance Typical approach, and failing to do routine maintenance and having to replace items earlier and more often Untapped savings Current industry focus on savings from BIM buildingSMART So what do owners need?
18
© 2011 Bentley Systems, Incorporated 18 | WWW.BENTLEY.COM What’s the answer..? paul.king@bentley.com
19
© 2011 Bentley Systems, Incorporated 19 | WWW.BENTLEY.COM Controlled distribution of e-paper collaboration Pre-construction.. and construction Coordination of engineering information management paul.king@bentley.com A project team collaboration and work sharing platform for the design and construction of infrastructure projects...
20
© 2011 Bentley Systems, Incorporated 20 | WWW.BENTLEY.COM Business systems Project collaboration Lifecycle coordination Managing information at a data level Managing business information Managing published information paul.king@bentley.com Pre-construction.. and construction
21
© 2011 Bentley Systems, Incorporated 21 | WWW.BENTLEY.COM Business systems Project collaboration Lifecycle coordination Model Files Data Schedules Financial Commercial Operational EDMS GIS BIM 3D CAD 2D CAD O&M paul.king@bentley.com Letters Submittals RFIs Review and acceptance Hosted service Tender control Project control Document control Renditions Pre-construction.. and construction
22
© 2011 Bentley Systems, Incorporated 22 | WWW.BENTLEY.COM 8D, 9D, 10D, etc How does Bentley support project teams? BIM (3D) Federated Information Models Geo suite Building suite Plant suite Civil suite Analysis tools Interference Manager Non-Bentley Bentley Navigator Virtual world Schedule Simulator Project programming tool Project schedule (4D) ProjectWise collaboration environment Integrated suite of Bentley tools Operations (7D) Sustainability (6D) Cost (5D) Revit Many more AutoCAD 3 rd party design and analysis FAB-MEP Managing information accurately, consistently and efficiently paul.king@bentley.com
23
© 2011 Bentley Systems, Incorporated 23 | WWW.BENTLEY.COM ProjectWise for contractors paul.king@bentley.com Arch MEP Elec. Struct. PDF Model Paper Design Construct Right content, right format for role and task Managed collaboration for technical content What do I build? What about buildability? What about clashes? What’s been built?
24
© 2011 Bentley Systems, Incorporated 24 | WWW.BENTLEY.COM Best practice for collaboration paul.king@bentley.com
25
© 2011 Bentley Systems, Incorporated 25 | WWW.BENTLEY.COM Best practice for collaboration Coordinate and collaborate Sharing content and monitoring performance Preserving data in its rich and natural state for the long term management of building assets Get the right content to the right audience in the right format at the right time Create Deliver Preserve Managed environment Quality control & assurance Rules for re-use Move content into data collaboration environment for reuse, distribution and storage paul.king@bentley.com
26
© 2011 Bentley Systems, Incorporated 26 | WWW.BENTLEY.COM Best practice: British Standard 1192 Method for developing, organising and managing construction documentation Disciplined collaborative approach using a managed procedure. 10% construction cost saving Supply chain profitability gains of 2-3% paul.king@bentley.com
27
© 2011 Bentley Systems, Incorporated 27 | WWW.BENTLEY.COM What do we need to do? The road to ‘big BIM’ paul.king@bentley.com
28
© 2011 Bentley Systems, Incorporated 28 | WWW.BENTLEY.COM Progress Time New processes and systems tested for shorter periods Risk of failure is managed as part of the development process Large jumps in processes and technology use Slow and steady progress – keeping up with the market Traditional approach Fail-forward approach New developments tested for long periods - low risk of failure Quick and dynamic progress – leading the market Small frequent jumps made in work processes and technology use.. a bit It’s okay to fail paul.king@bentley.com
29
© 2011 Bentley Systems, Incorporated 29 | WWW.BENTLEY.COM 80% 0% Companies Average Degree of BIM implementation Average is okay.. for a while paul.king@bentley.com
30
© 2011 Bentley Systems, Incorporated 30 | WWW.BENTLEY.COM The road less travelled Secure finance and executive backingPilot project(s) – plan, execute and reviewPrepare deployment strategyEducation, training and supportDevelop BIM strategy The road to ‘big BIM’
31
© 2011 Bentley Systems, Incorporated 31 | WWW.BENTLEY.COM Processes and standards –Ensure project data can be shared –Global - industry - corporate - project People –Training strategy and training in the process – What’s in it for me? – How do I ‘do it’? Technology –The least important aspect! –It works, using standard hardware and software paul.king@bentley.com Implementation principles
32
© 2011 Bentley Systems, Incorporated 32 | WWW.BENTLEY.COM It’s usually a picnic..
33
© 2011 Bentley Systems, Incorporated 33 | WWW.BENTLEY.COM How does Bentley help contractors? Figure out what to build Optimise how to build Know who needs what, when and in what format Understand what got built Automate IT mobilisation Everyone confident that each person has the latest up-to-date information... all the time Managed system to facilitate constructability reviews and optioneering Closed loop redline markups Paper based markups if required ProjectWise publishes to project control systems As-built information and data captured and managed ProjectWise Online: get started immediately and leave server coordination to ‘the cloud’ paul.king@bentley.com
34
© 2011 Bentley Systems, Incorporated 34 | WWW.BENTLEY.COM Working smarter takes vision, commitment, determination and effort... The road to ‘big BIM’ There are business benefits when you’re in a position of control Create a ‘big BIM’ solution that benefits the project and its participants Develop your road to BIM and don’t try to do it all at once. Arch
35
© 2011 Bentley Systems, Incorporated Big BIM for contractors Paul King Construction Solutions Manager