SKAMP Square Kilometre Array Molonglo Prototype
2
Supporting Institutions University of Sydney Argus Technologies ATNF ICT Centre
3
SKAMP Team Bevan Jones Andrew Parfitt John Kot Peter Liversidge Daniel Mitchell Adrian Blake Anne Green Duncan Campbell-Wilson John Bunton Mike Kesteven Tim Adams Martin Leung Sergey Vinagradov School of Physics, University of Sydney Argus Technologies, Sydney ICT Centre, CSIRO Australia Telescope National Facility, CSIRO
4
SKAMP Specifications Multibeaming Wide instantaneous field of view Digital beamforming Wide-band FX correlator (2048 channels) Frequency and pointing agility Collecting area = 1% of SKA (i.e. equivalent to 1 SKA station) Line feed 0.3-1.4 GHz >100 MHz instant BW Cylindrical antenna prototype RFI mitigation strategies - adaptive noise cancellation
5
SKAMP Project Stage I: Continuum Operation New IF Samplers Digital delay lines Fringe tracking Continuum correlator (96 station; 4 MHz) Stage II: Spectral Line Operation New LO New IF distribution 2048 channel polyphase filter/antenna; Spectral line cross-correlator engine (50 MHz BW) Stage III: Wide Band Operation Wide band feed (300-1400 MHz) RF beamformers distributed along the cylinder New front-end Digital beamformer + increased correlator BW
6
SKAMP Development Groups Antenna/Linefeed Data Acquisition & Beamforming Correlator Signal Processing A x B
7
Antenna/Linefeed Progress Initial prototyping and simulation has begun for possible linefeed designs Currently being investigated is a wideband dipole antenna element A three element array has been constructed and tested Several multi element arrays have been simulated A x B
8
Prototype antenna design
10
Simulation: Normalised Amplitude Eight Element Array Optimal choice of spacing High polarisation purity (-24 dB) Low level of sidelobes
11
Simulation: X-Polar Pattern Eight Element Array Optimal choice of spacing High polarisation purity (-24 dB) Low level of sidelobes
12
Data Acquisition & Beam-forming Progress 100 x ADC boards manufactured & ready to install Digital delay & phase-tracking board currently being manufactured First fringes obtained Stage II – samplers, IF signal transport and beamformers in design A x B
13
ADC Production & Testing
14
First Fringes
15
Correlator Progress Correlator design complete & PCB is current being manufactured/populated Testing & debugging will commence early July Lab for testing established at USYD Stage II – spectral line correlator design being revised; several options for polyphase filterbank A x B
16
Signal Processing Progress SKAMP I interface built and installed Controlled acquisition of telescope parameters, wide field position and visibilities every second From ephemeris package, computed delay, phase and phase rates. Also calculation of telescope tilt and meridian distance. Distribution of information to delay and phase control units Imminent completion of data visibility formatting and archiving A x B
17
Summary Stage I: Commissioning August – December 2004 Stage II: Update design matrix Stage III: Commissioning eight element prototype Simulation of centre fed finite cylinder