Download presentation
Presentation is loading. Please wait.
Published byJayde Farrell Modified over 10 years ago
1
18.01.06J. Jones (Imperial College London), Alt. GCT Mini-Meeting Source Card Design Status and Plans
2
J. Jones (Imperial College London), Alt. GCT Mini-Meeting2 18.01.06 Overview Source Card Tasks Separate e/γ from jets Condense 2x68-way SCSI (RCT) 4x1.4Gbit/s optical fibre BC0 sync. checking (compare TTC with BC0 embedded in data) Autocalibrated delay to phase match data on different channels (if required) USB 2.0 interface for diagnostic/testing (borrowed from IDAQ-APVE) Swtiches data between channels to provide ‘split’ information to leaf cards Extra features On-board temperature/status monitoring Read out either during gaps in data (via concentrator card)…or via USB Data capture from RCT (for debugging) Internal test pattern generation (up to 1024BX) for testing leaf cards, etc… Can (in theory) scale to 2 x required bandwidth (pin-compatible part)
3
J. Jones (Imperial College London), Alt. GCT Mini-Meeting3 18.01.06 Board Layout (Preliminary) 6/8-layer 6U VME form factor USB 2.0 (Cypress SX2) TTCrx & QPLL 2xVHDCI SCSI for RCT input 4xOptical SFP output & SerDes Linear supplies for fast components Switch-mode (TI) for logic Either: 2 x XC3S1000-4FT256 (~£80) Simpler design Longer latency Or: 1 x Xilinx Spartan 3 4-8 x Xilinx Coolrunner-II CPLD More complex design Lower Latency
4
J. Jones (Imperial College London), Alt. GCT Mini-Meeting4 18.01.06 Functional Issues (To Be Discussed) Clock Distribution Direct from QPLL Split by dedicated clock buffer (made by TI) No PLL in splitter to minimise jitter Max skew ~500ps (OK for 80MHz) SerDes TLK2501 seems like a good choice with bandwidth margin ECL Termination Scheme Have a version done, but would like to discuss with Wisconsin first Similar to Bristol IM, with a few extra tweaks / options Use same buffers (they have wide common-mode range, +5V to -4V)
5
J. Jones (Imperial College London), Alt. GCT Mini-Meeting5 18.01.06 Source Card Latency RCT->Leaf (Maximum Limit) Madison Cable (quoted from datasheet) 1.5ns/ft Assume 5ft max. length => 1.5x5 = 7.5ns delay ECL Buffers 2.5ns-6ns (4ns typical) FPGA/CPLD FPGA (XC3S1000): 5ns in IOBs, at a guess >5ns trace delay = 10ns CPLD (Coolrunner-II): 3.8ns-7.1ns total delay SerDes 38 bit-times@1.6GHz (625ps) = 23.75nsbit-times@1.6GHz PCB Tracking Assume 10-inch@300ps/inch = 3ns Optical Fibre (20m) 50ns-75ns? Estimated Total: 7.5+6+(3.8 10)+23.75+3 = 44.05ns-50.25ns ~ 2BX + 2-3BX
6
J. Jones (Imperial College London), Alt. GCT Mini-Meeting6 18.01.06 Source Card Skew (Maximum Limit) Madison Cable (quoted from datasheet) 0.025ns/ft maximum Assume 5ft max. length => 0.025x5 = 0.175ns skew ECL Buffers 1ns max. (part-part) FPGA/CPLD Negligible skew (can be controlled) SerDes N/A PCB Tracking Can (will) be controlled Estimated Total: 0.175+1 = 1.75ns << 12.5ns clock
7
J. Jones (Imperial College London), Alt. GCT Mini-Meeting7 18.01.06 Build Plan & Price (Guess) Schematic ME Layout S. Greenwood (IC) – She’s starting now Manufacture (awaiting quote from Cemgraft) Have checked, they’re not too busy a.t.m. Cemgraft (assembly/parts) ExceptionPCB (PCB manufacture) Good experience with complex high-speed boards in the past 18 RCT crates x 6 cables / 2 => 54 cards Should be ~£60,000 for 60 required (with spares)
8
J. Jones (Imperial College London), Alt. GCT Mini-Meeting8 18.01.06 Schedule Schematic (1-2 months) Aim to finish ASAP, but I’m kinda busy until 3am… (APVE, SLHC) Preferrably draft end of January, but definitely end of February Layout (2 months) End of February latest Parts (?) Critical parts ordered by end of January Not fancy parts Should be able to get prototype parts by submission date Firmware (2 months) Me & A. Rose? (Some firmware adopted from IDAQ or written now) Aim to prototype with testing end of March I suspect this may be optimistic, parts will probably cause delays March is contingency (leaf card is probably not available by then?)
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.