“Aggressive schedule” seen by MJPB (just for WP1) (incl. VAT) Needed to be aggressive to meet 2005/6 shutdown….

Similar presentations


Presentation on theme: "“Aggressive schedule” seen by MJPB (just for WP1) (incl. VAT) Needed to be aggressive to meet 2005/6 shutdown…."— Presentation transcript:

1 “Aggressive schedule” seen by MJPB (just for WP1) (incl. VAT) Needed to be aggressive to meet 2005/6 shutdown….

2 Protect use of ISIS long shutdown –small expenditure –mainly funds held in this F/year. Next long shutdown has moved –Expect mid 2006 for 6 months –muon beam line Q2/06  Q1/2007 Less pressure early on – level cost profile, but Could have a four year programme! Because all infrastructure is needed to run MICE. But only muon channel is needed for detectors. –Full MICE Running now mid 2008 Depends on international funding levels

3 Progress towards levelling…. Can change profile by sliding things about……

4 200320042005200620072008 Shutdown Hole cutting etc Design Install Muon Beam Line Phase I Cryogenics Phase 2 Plant MICE Tracker ToF Spectrometer Focus Coils Overlap with NF bid Levelled MICE

5 200320042005200620072008 Shutdown Hole cutting etc Design Install Muon Beam Line Phase I Cryogenics Phase 2 Plant MICE Tracker ToF Spectrometer Focus Coils Overlap with NF bid Four Year MICE…? 2M 3M 4M 3M ?


Download ppt "“Aggressive schedule” seen by MJPB (just for WP1) (incl. VAT) Needed to be aggressive to meet 2005/6 shutdown…."