Download presentation
Presentation is loading. Please wait.
Published byStefan Titman Modified over 10 years ago
1
Service Challenge at INFN Tier1 Brief site report. LCG T.Ferrari, L.d.Agnello, G.Lore, S.Zani INFN CNAF
2
Network WAN Wan Access available now up to 2 Gb/s (Via GARR) End of March 10 Gb/s (GARR roadmap) End of ’05 Dark Fiber 10Gb/s or more (GARR roadmap) LAN Extreme Summit 400 (48xGE+2x10GE) dedicated to Service Challenge. LCG GARR CERN 2->10Gb 1Gb Servers Summit 400
3
GARR Roadmap MI 3 CO FI TO CA PG AQ GE VEPV LE MT AN NA CS PAME MI 2 BO PI RM 2 FR A RM 1 BA CT GARR-G Fase 4 Dec 2005 TS PD Ljubljana EumedConnect MI 4 CERN Frank furt MI1 Zuric h GigaPOP Mega POP 2.5Gbps SDH/WL 10Gbps SDH/WL Dark Fibre/DWDM MI 4 MI 3 CO FI TO CA PG AQ GE VEPV LE MT AN NA CS PAME MI 2 BO PI RM 2 FR A RM 1 BA CT GARR-G Fase 3 Mar 2005 TS PD MI 1 EumedConnect GigaPOP Mega POP 2.5Gbps SDH/WL 10Gbps SDH/WL Dark Fibre/DWDM CERN INFN Tier1
4
Servers and storage Servers Imminent delivery of 11 SUN Fire V20 Dual Opteron (2,2 Ghz) –2x 73 GB U320 SCSI HD (10.000 RPM) –2x Gbit Ethernet interfaces –2x PCI-X Slots Storage For the very first tests we plan to use the internal disks. We can also provide different kinds of Fiber Channel SAN attached devices (Infortrend Enstor, IBM Fast- T900,..). LCG
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.