Download presentation
Presentation is loading. Please wait.
Published byAnne Ringer Modified over 10 years ago
1
Lake Baikal Neutrino Experiment Present and Future G.V.Domogatsky (INR, Moscow) for the Baikal collaboration
2
1.Institute for Nuclear Research, Moscow, Russia. 2.Irkutsk State University, Irkutsk, Russia. 3.Skobeltsyn Institute of Nuclear Physics MSU, Moscow, Russia. 4.DESY-Zeuthen, Zeuthen, Germany. 5.Joint Institute for Nuclear Research, Dubna, Russia. 6.Nizhny Novgorod State Technical University, Nizhny Novgorod, Russia. 7. St.Petersburg State Marine University, St.Petersburg, Russia. 8. Kurchatov Institute, Moscow, Russia. The Baikal Collaboration
4
4km OffShore Depth: 1366 m Shore Station 1366m Depth
5
Neutrino Telescope NT200+ (April, 2005)
6
6 The NT-200 Telescope -8 strings: 72m height - 192 optical modules - pairwise coincidence 96 space points - calibration with N-lasers - timing ~ 1 nsec - Dyn. Range ~ 1000 pe Effective area: 1 TeV ~2000 m² Eff. shower volume: 10TeV ~0.2Mt Quasar PMT: d = 37cm Height x = 70m x 40m, V=10 5 m 3 Installation 1993-1998
7
Camp Ice as a natural deployment platform ~ 2 months
15
GOALS Natural flux of neutrinos with energy E>15GeV (search for point sources of neutrinos) Natural flux of neutrinos with energy E>15GeV (search for point sources of neutrinos) WIMP WIMP Magnetic Monopoles Magnetic Monopoles Diffuse flux of very high energy (E>10 TeV) neutrinos Diffuse flux of very high energy (E>10 TeV) neutrinos
16
Neutrino events from low hemisphere April 1998 - February 2003, 1038 d, 372 events.
17
Atmospheric Muon-Neutrinos - With looser cuts, 1998-2002: 372 events. N (>15GeV)/N (>1GeV)~1/7 A higher statistics neutrino sample for Point-Source Search. - MC: 385 ev. Expected (15%BG). Skyplot (galactic coordinates) E_thr ~ 15GeV
18
Search for fast monopoles ( N = n 2 (g/e) 2 N = = 8300 N g = 137/2, n = 1.33 ~E =10 7 GeV Event selection criteria: hit channel multiplicity - N hi t > 35 ch, upward-going monopole - (z i -z)(t i -t)/( t z ) > 0.45 & o Background - atmospheric muons 90% C.L. upper limit on the flux of fast monopole (994 livedays)
19
19 Search for High Energy - Cascades NT-200 large effective volume Look for upward moving light fronts. Signal: isolated cascades from neutrino interactions Background: Bremsshowers from h.e. downward muons Final rejection of background by „energy cut“ (N channel ) (BG)
20
Baikal Absorbtion Length: 22 ± 2 m Scattering Length ~ 30-50 m cos ~ 0.85-0.9 Optical properties
21
Fiducial volume V g (NT-200) AMANDA II Position of cascade vertex Neutrino Energy, lg(E/ТeV)
22
UPPER LIMITS ON THE DIFFUSE NEUTRINO FLUX (theoretical and experimental) НТ-200+ км 3
23
NT200+ commissioned April 2005 1. 3 outer strings were installed 2. New DAQ – final modernization - 2 Underwater PC with Flex DSL modem (1 Mbod), - 2 Underwater PC with Flex DSL modem (1 Mbod), Underwater Ethernet Underwater Ethernet - Synchronization unit - Synchronization unit * time synchronization * time synchronization NT200 outer strings NT200 outer strings * event clusterization * event clusterization 3. New Software DOS -> Linux, Remote control DOS -> Linux, Remote control 4. New 2 cables to shore (2x4 km) 5. Calibration - New bright Laser
24
1 10 100 1000 PeV 4 15 23 40 Mton NT200+
25
Cascade coordinates (energy) reconstruction efficiency NT - 200+
26
NT200+ time synchronization (new laser) mm Time differences NT200 – outer string: 2-4nsec fwhm interstring/NT200 jitter >10 12 photons/pulse
27
NT200+ Start of operation April 2005 Examples of events
28
NT200+ as a module of Gigaton (km3) Detector in Lake Baikal
30
A Gigaton (km3) Detector in Lake Baikal. Sparse instrumentation: 91 strings with 12 OM = 1308 OMs effective volume for 100 TeV cascades ~ 0.5 -1.0 km³ muon threshold between 10 and 100 TeV 624 m 280m 70m 120m 208m
33
Baikal – GVD Schedule Milestones 06-07 R&D, Testing NT200+ 06-07 R&D, Testing NT200+ 08 Technical Design 08 Technical Design 08-14 Fabrication (OMs, cables, 08-14 Fabrication (OMs, cables, connectors, electronics) connectors, electronics) 10-12 Deployment (0.1 – 0.3) km3 10-12 Deployment (0.1 – 0.3) km3 13-14 Deployment (0.3 – 0.6) km3 13-14 Deployment (0.3 – 0.6) km3 15-16 Deployment (0.6 – 0.9) km3 15-16 Deployment (0.6 – 0.9) km3 Overall cost with logistics ~ 20 MEuro Detector ~ 16 MEuro Logistics, including infrastructure ~ 4 MEuro
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.