Download presentation
Presentation is loading. Please wait.
Published byRegina Venables Modified over 10 years ago
1
Facilities Management
5
x = $ $
6
Backlog maintenance is consuming our estates
7
2007 Go8 Survey ARV $12.7 billion Backlog $1.49 billion 53% assets rated poor to critical
8
The appeal of “new” over existing
9
Accurate condition reporting of building and infrastructure assets
10
The Next Survey Types of spaces ARV of these spaces Refurbishment history of these spaces Functionality of buildings Value of deferred capital works Environmental performance ratings
12
Green Performance Operational Inspirational
13
Requirement to register NGER Carbon Pollution Reduction Scheme Neutral Carbon Offset Standard Commonwealth Climate Change Initiatives
14
Current Custodians
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.