Shipbreaking Module 4: Heavy Equipment & Material Movement 4.3 Personnel Hoist & Platforms Susan Harwood Grant Number SH-17820-08-60-F-23.

Similar presentations


Presentation on theme: "Shipbreaking Module 4: Heavy Equipment & Material Movement 4.3 Personnel Hoist & Platforms Susan Harwood Grant Number SH-17820-08-60-F-23."— Presentation transcript:

1 Shipbreaking Module 4: Heavy Equipment & Material Movement 4.3 Personnel Hoist & Platforms Susan Harwood Grant Number SH-17820-08-60-F-23

2 Disclaimer 2  This material was produced under grant number SH-17820-08-60-F-23 from the Occupational Safety and Health Administration, U.S. Department of Labor. It does not necessarily reflect the views or polices of the U.S. Department of Labor, nor does mention of trade names, commercial products, or organizations imply endorsement by the U.S. Government.

3 Objectives 3  Identify operation procedures for cranes and derricks  Describe personnel platform systems  List testing and inspection procedures  Explain the operations of personnel platforms

4 4

5 5

6 OSHA has guidelines on personnel hoist platforms. 6 Figure 1 Personnel hoist in fishing vessel outriggers

7 Personnel hoists should be the last resort when all other avenues such as ladders, scaffolds, and other means are exhausted. 7 Figure 2 Crane along vessel as it enters the slip

8 Employee safety should not be compromised for the operation. 8 Figure 3 Personnel Lift on superstructure

9 Cranes pose a risk of tipping and therefore must be on a firm level ground. 9 Figure 4 Crane on level ground hoisting

10 A 1% uniform grade must be maintained. 10 Figure 5 Crane on level firm surface

11 Minimum safety factor of seven for the load line of wire rope and ten for rotation- resistant rope. 11 Figure 6 Hoist bridle with screw pin shackles attached

12 Brakes or locking devices on the crane must be engaged when personnel are working aloft. 12 Figure 7 Crane at rest between operations

13 13

14 The platform must be rated for 5 times the safe working load of the intended lift. 14 Figure 8 Load testing crane and rigging

15 Install a suspension system on the top of the platform to prevent tipping. 15 Figure 9 Personnel platform over side of ship conducting hot work operations

16 Must have a rail to keep personnel from falling out including a toe board. 16 Figure 10 Personnel platform with enclosed railing for worker

17 Load placard is prominently posted on the platform with the load weight and platform weight. 17 Figure 11 Worker inside platform conducting hot work on hull

18 Do not exceed the platform’s rated load capacity. 18 Figure 12 Overview of slip with crane hoisting a personnel platform

19 Bridles and rigging dedicated to personnel hoisting can not be used for any other purpose. 19 Figure 13 Personnel hoist on main deck of vessel

20 Hooks and other attachments must be closed type to prevent opening. 20 Figure 14 Closed hook

21 Mousing the hook is strictly prohibited. 21 Figure 15 Mousing hook with line

22 22

23 A trial lift must be made before workers can be placed in the platform. 23 Figure 16 Personnel hoist initial hoist tested

24 A lift starts at ground level and is then positioned to the vessel. 24 Figure 17 Supervisor monitoring movement of personnel platform hoisting

25 All systems will be evaluated and inspected for safety concerns. 25 Figure 18 Personnel platform over side of vessel static

26 When the position shifts along the vessel a trial test must be completed at the new location. 26 Figure 19 Crane along slip stationary

27 Immediately after the trial lift conduct a complete inspection of the rigging, platform, and crane. 27 Figure 20 Supervisors concluding inspection of equipment

28 28

29 Before personnel can be transported in the platform, the lift has to have all kinks and twist removed from the rigging. 29 Figure 21 Rigging being laid out

30 The platform will be hoisted a few inches above the ground to allow the rigging to settle and check for alignment. 30 Figure 22 Hoist in suspension above ground

31 A competent person must conduct an inspection and test prior to usage. 31 Figure 23 Close up of wire rope and rust within the lays of the strands

32 Prior to the platform coming to the site a 5 minute proof testing, at 125% of the load capacity, must be completed. 32 Figure 24 Certified weights for personnel platform hoist

33 Tag lines are advisable unless they create a unsafe condition or be fouled in the rigging of the vessel. 33 Figure 25 Rigging clear of vessel gear on main deck

34 Personnel shall keep all body parts and equipment inside the platform at all times. 34 Figure 26 Workers preparing to board

35 Personal fall arrest systems must be attached to the lower back and to the platform. 35 Figure 27 Personnel fall protection in place and secured

36 The crane should not be in motion with personnel in the platform. 36 Figure 28 Crane is on standby along slip

37 If the crane must move with personnel, it must be restricted in the distance moved and a trial run should be considered. 37 Figur29 View of the crane down the side

38 Crane operator must be at the controls at all times when the machinery is operating. 38 Figure 30 Supervisor monitoring operations over side of vessel

39 39

40 40

41 References 41  OSHA eTool www.osha.govwww.osha.gov

42 42 Worker safety is a priority