Download presentation
Published byMarley Pamplin Modified over 10 years ago
1
FUEL MANAGEMENT TECHNOLOGIES VR Refiner introduction
VIDEO presentation
2
Vents and Delivery Points (no pump pipes are present in this graphic)
P.V. valve Stage 1 Connector Vent Manifold Delivery Connection Point Delivery Pipes Vent Pipes Pipes System from Other Tanks Vents and Delivery Points (no pump pipes are present in this graphic) 95
3
VR Refiner Installation
P.V. valve Stage 1 Connector Vent Manifold Delivery Connection Point Pipes Vent Pipes Pipes System from Other Tanks VR Refiner Installation 95
4
VR Refiner Installation
Connect the Unit between Vent Manifold and Vent Stack 95
5
VR Refiner Installation
Connect the Unit between Vent Manifold and Vent Stack 95
6
VR Refiner Installation
Connect the Unit between Vent Manifold and Vent Stack 95
7
VR Refiner Installation
Connect the Unit between Vent Manifold and Vent Stack 95
8
VR Refiner Installation
380v 5Kw IP address VR Refiner Installation Connect Petrol Return Line and Power & Communication 95
9
VR Refiner READY TO WORK 95
380v 5Kw IP address VR Refiner READY TO WORK 95
10
380v 5Kw IP address VR Refiner Operation Truck tanker connects fuel delivery hose & vapour return hose as normal 95
11
380v 5Kw IP address VR Refiner Operation Truck tanker connects fuel delivery hose & vapour return hose as normal 95
12
380v 5Kw IP address VR Refiner Operation The tanker begins delivery to the UST and displaced vapours proceed to the VRR 95
13
380v 5Kw IP address VR Refiner Operation The tanker begins delivery to the UST and displaced vapours proceed to the VRR 95
14
VRR processes the Vapours recovering the Petrol
380v 5Kw IP address VR Refiner Operation VRR processes the Vapours recovering the Petrol 95
15
The tanker completes the delivery process, the site UST is full
380v 5Kw IP address VR Refiner Operation The tanker completes the delivery process, the site UST is full 95
16
VRR completes the Vapours Processing and stores the fuel
380v 5Kw IP address VR Refiner Operation VRR completes the Vapours Processing and stores the fuel 95
17
380v 5Kw IP address VR Refiner Operation When VRR tank reaches a set volume the recovered Petrol is returned to the UST 95
18
The system reads VRR tank volume and communicates data to management
380v 5Kw IP address VR Refiner Operation The system reads VRR tank volume and communicates data to management 95
19
VRR Data monitor, shows the accumulated volumes and results
380v 5Kw IP address 95
20
Converts Petrol Vapours to Petrol Liquid for Duty Free resale
380v 5Kw IP address VR Refiner Converts Petrol Vapours to Petrol Liquid for Duty Free resale 95
21
info@vrrefiner.com www.vrrefiner.com
Fuel Management Technologies Ltd 3 Broughton Business Centre Causeway Road, Broughton Cambridgeshire PE28 3AR United Kingdom Fuel Management Technologies S.L. Av. Diagonal 566, 4 08021 Barcelona Catalonia Spain
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.