Presentation is loading. Please wait.

Presentation is loading. Please wait.

1 Nashville 3 March 2006 Michael Tague 502-815-7171

Similar presentations


Presentation on theme: "1 Nashville 3 March 2006 Michael Tague 502-815-7171"— Presentation transcript:

1 1 Nashville 3 March 2006 www.AmericanCLEC.com Michael Tague 502-815-7171 tague@AmericanCLEC.com

2 2 Why Become a CLEC? Savings Opportunity A Future

3 3 PRI Savings $70/mo for PRIs LATA wide calling Fewer POPs required (Queuing efficiency) Eliminates lots of circuits More local calling areas

4 4 T1 Savings 70% less than typical retail loops E.g. Indiana, SBC Local loop: $38 Distant: $50 + $1.65/mile E.g. Tennessee, BellSouth Local loop: $51 Distant loop: $129 + $0.36/mile

5 5 Backend Loop Savings DS3s replaced by cross-connects: $30. To Backbone providers To ATM network for DSL Telco Collocation A bit stiff to go into: $10,000 Great place to be: $300-700/mo Power Environmentals

6 6 Did I mention Savings? Typical ISP: 40% of Rev on Telecom CLEC ISP: 20%. Where does the other 20% go: Vacation House Boat, cars, plane New products, invest in business

7 7 Opportunities Serve New Markets: Dial-up: $0.29/month/subscriber LATA Wide: new towns, new local numbers Distant T1s: $18 - 50 miles BS in Tennessee $83 – 50 miles SBC in Indiana Low cost T1s for high quality VoIP Low cost VoIP Termination: $70 PRIs Interface, # ports, 911, operator services

8 8 A Future HDSL loops to replace T1s $9.64 (in TN) DSLAMs – own the DSL network Colo: $10k, Remote: $2k Fiber, access to poles & conduits

9 9 Telephone Service Purchase a Phone Switch See Coppercom Presentation! Provide CLASS 5 services PRIs, POTS, Call Waiting, Voice Mail, Centrex VoIP Only a Consideration

10 10 Misconceptions It takes two years to start-up as a CLEC Must purchase expensive phone switch $250,000 - $750,000 A CLEC requires unique technical skills Nightmare of paperwork and bureaucracy Well, not everything is a misconception!

11 11 American CLEC Help Your ISP become a CLEC Operational in six-eight months No expensive phone switching equipment We do it all: incorporation, interconnection, state PSC approval, applications, filings, agreements, codes, IDs, collocation, circuit turn-up, ordering, documentation, phone numbers, conversion. Pay us out of savings after completion. We give you a CLEC, not a headache

12 12 Process We come and meet you We go over existing network layout and circuit costs We prepare detailed proposal You decide in your own time


Download ppt "1 Nashville 3 March 2006 Michael Tague 502-815-7171"

Similar presentations


Ads by Google