Presentation is loading. Please wait.

Presentation is loading. Please wait.

Company History Services  Prototype runs  Pre-production runs  Production runs  Quick Turnarounds ◦ 24 Hour turnarounds: ◦ 48 Hour turnarounds: ◦

Similar presentations


Presentation on theme: "Company History Services  Prototype runs  Pre-production runs  Production runs  Quick Turnarounds ◦ 24 Hour turnarounds: ◦ 48 Hour turnarounds: ◦"— Presentation transcript:

1

2 Company History

3 Services  Prototype runs  Pre-production runs  Production runs  Quick Turnarounds ◦ 24 Hour turnarounds: ◦ 48 Hour turnarounds: ◦ 72 Hour turnarounds:  Complete Turnkey or Consignment services  PCB layout and Design  Systems integration  ICT and Functional testing  Single & Double Sided Flying Probe Testing  Cables and Harnesses  Press Fit  Fulfillment and packaging services  Automatic Optical Inspection (AOI)  Ionic Cleaning System  Vapor Phase Reflow Soldering  Out of Box Audit / Source Inspection

4 We serve these industries using: ◦ Automated Surface Mount lines ◦ We offer variety of layout tools ◦ Single and Double Sided Flying Probe ◦ Quick Turnaround ◦ Vapor Phase Reflow Soldering ◦ Free pick-up and delivery within the bay area Capabilities We serve various industries including: Medical Industrial Automation Automotive Memory related products Military Communications Unconventional products

5 Differentiatiors  Utilizing vapor phase reflow soldering  Single and Double sided flying probe  Engineers on site (design/layout)  Testing/X-ray in house  Quick turn capabilities  Programming and Final Assembly

6 Process Controls  Continuous Process Improvement  ISO-9001:2008 & 13485 Certified  CAPA based process control system  SPI and 5DX implemented for detection  Personnel Proficiency / Operator Certifications  Statistical Process Control - CPK Tracking  Internal Audits and Quality Improvement Feedback  MRP and ERP systems in place  FMEA (Failure Mode & Effects Analysis)  ESD Prevention Practices & Monitoring  Calibration System traceable to NIST

7 Process Control SEM QUALITY MONITORS – JAN‘2014 Mean = 8.5934 StdDev = 0.078187 USL = 9.5 LSL = 7.5 Sigma Level = 11.5953 Sigma Capability is Greater Than 7 Cpk = 3.8651 Cp = 4.2633 DPM =.00000000 N = 32 This Cpk is considered fair based on the following scale: 0 to less than 1.0 is unacceptable; Greater than 1 to 1.33 is fair; Greater than 1.33 to 1.66 is acceptable; Greater than 1.66 is exceptional

8 Certificates / Standards  Quality System: ISO-13485 and ISO- 9001:2008 Quality System Standard  Workmanship Standard: IPC-A-610 class 1,2,3  Soldering Standard: J-STD-001 class 1,2,3  ANSI/ESD S20.20 Standard

9  Contact Us At:  595 Yosemite Drive Milpitas, CA 95035 Ph: 408.263.3600 Fax: 408.263.8700  email: sales@sem-inc.com info@sem-inc.comsales@sem-inc.cominfo@sem-inc.com  Website: www.sem-inc.comwww.sem-inc.com  Contact Us At:  595 Yosemite Drive Milpitas, CA 95035 Ph: 408.263.3600 Fax: 408.263.8700  email: sales@sem-inc.com info@sem-inc.comsales@sem-inc.cominfo@sem-inc.com  Website: www.sem-inc.comwww.sem-inc.com Contact Information


Download ppt "Company History Services  Prototype runs  Pre-production runs  Production runs  Quick Turnarounds ◦ 24 Hour turnarounds: ◦ 48 Hour turnarounds: ◦"

Similar presentations


Ads by Google