Presentation is loading. Please wait.

Presentation is loading. Please wait.

Doc.: IEEE 802.11-05/0753r0 SubmissionClint Chaplin (Symbol Technologies)Slide 1 Wi-Fi Alliance Liaison Report July 20, 2005 Clint Chaplin Temporary Wi-Fi.

Similar presentations


Presentation on theme: "Doc.: IEEE 802.11-05/0753r0 SubmissionClint Chaplin (Symbol Technologies)Slide 1 Wi-Fi Alliance Liaison Report July 20, 2005 Clint Chaplin Temporary Wi-Fi."— Presentation transcript:

1 doc.: IEEE 802.11-05/0753r0 SubmissionClint Chaplin (Symbol Technologies)Slide 1 Wi-Fi Alliance Liaison Report July 20, 2005 Clint Chaplin Temporary Wi-Fi Alliance Liaison

2 doc.: IEEE 802.11-05/0753r0 SubmissionClint Chaplin (Symbol Technologies)Slide 2 Wi-Fi Alliance Active Task Groups Marketing –Co-Existence –Consumer Electronics –Ease of Use/Simple Config –Public and Managed Access –QoS –Voice Over Wi-Fi –Wi-Fi/Cellular Convergence Technical –QoS Certification –Security Certification (in hibernation) –ASD (Application Specific Device) Certification –Public and Managed Access –Wi-Fi/Cellular Convergence Spectrum/Regulatory

3 doc.: IEEE 802.11-05/0753r0 SubmissionClint Chaplin (Symbol Technologies)Slide 3 QoS Technical WMM-Baseline Task Group Working on Unscheduled APSD test plan Holding second plugfest in early August

4 doc.: IEEE 802.11-05/0753r0 SubmissionClint Chaplin (Symbol Technologies)Slide 4 QoS Technical WMM-Scheduled Access Task Group Worked on test plan Next plugfest in late August 1Q’06 anticipated start of certification

5 doc.: IEEE 802.11-05/0753r0 SubmissionClint Chaplin (Symbol Technologies)Slide 5 ASD Technical Task Group Group is considering alternative approaches to allow devices to be tested in standard fashion –CE devices a primary focus

6 doc.: IEEE 802.11-05/0753r0 SubmissionClint Chaplin (Symbol Technologies)Slide 6 Public and Managed Access Task Groups Group’s scope was increased to also address managed access infrastructure –Name change reflects scope change Features that were defined for Public Access are also needed by other applications (e.g. large enterprises) –Multiple BSSID support –VLAN tagging support

7 doc.: IEEE 802.11-05/0753r0 SubmissionClint Chaplin (Symbol Technologies)Slide 7 WCC/Cellular Convergence Task Group Working on test methodologies Want to test coexistance/interference issues between cellular and 802.11 radios

8 doc.: IEEE 802.11-05/0753r0 SubmissionClint Chaplin (Symbol Technologies)Slide 8 Member Meeting Schedule 2005 –Q3-Beijing, Sept. 13-15 –Q4-Phoenix, Dec. 6-8 2006 –#1 Athens, Greece, Feb. 26 - Mar. 3 –#2 Vancouver, BC, Jun. 4 - 9 –#3 Asia (TBD)


Download ppt "Doc.: IEEE 802.11-05/0753r0 SubmissionClint Chaplin (Symbol Technologies)Slide 1 Wi-Fi Alliance Liaison Report July 20, 2005 Clint Chaplin Temporary Wi-Fi."

Similar presentations


Ads by Google