Download presentation
Presentation is loading. Please wait.
Published byDestiney Crockett Modified over 10 years ago
1
doc.: 18-14/0039 Submission July, 2014 Michael Lynch, MJ Lynch & Associates LLCSlide 1 RR-TAG Opening Report Notice: This document has been prepared to assist IEEE 802.18. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Date: March 2014 Authors:
2
doc.: 18-14/0039 Submission July, 2014 Michael Lynch, MJ Lynch & Associates LLCSlide 2 Overview This document reports on the regulatory matters considered and outputs after the end of the March IEEE 802 Plenary and the May, 2014 Wireless Interim. One document that has had a high level of interest to IEEE 802 was approved by the RR and 802.24 TAGs as a further response to ITU-R Question 236/1, dealing with technologies and spectrum used in the management of Smart Grids. This document, 18-13-0117-06, was submitted to the ITU-R and is now the core of the wireless response to Question 236/1. The attendance varies depending on the topics & documents being considered. While we plan for ~15 representing all 802 WGs the actual attendance can be considerably more. Final approval of documents is intended to be done Thursdays during AM1 and AM2.
3
doc.: 18-14/0039 Submission July, 2014 Michael Lynch, MJ Lynch & Associates LLCSlide 3 Some of the items to be considered at this meeting The RR-TAG will review two liaison documents from ITU-R WP1A dealing with Wireless Power Transmission (WPT) and the potential for sharing the ISM frequency bands with the proposed technologies. –18-14-0037 “STUDY ON QUESTION ITU-R 210-3/1 “WIRELESS POWER TRANSMISSION”, not using RF beams. –18-14-0038 “STUDY ON QUESTION ITU-R 210-3/1 “WIRELESS POWER TRANSMISSION” RELATED TO WIRELESS POWER TRANSMISSION VIA RADIO FREQUENCY BEAM A very recent FCC release that should be of interest to multiple 802 groups. –18-14-0040 “ET Docket No. 14-99 Model City for Demonstrating and Evaluating Advanced Sharing Technologies” Review of the current status of the ITU-R Question 236/1 on Smart Grid management technologies. –18-14-0036-01 titled “Working Document towards a Preliminary Draft New REPORT ITU-R SM.[SMART_GRID]
4
doc.: 18-14/0039 Submission July, 2014 Michael Lynch, MJ Lynch & Associates LLCSlide 4 Additional RR-TAG Items for July: Further contributions to ITU-R, FCC, and to other regulatory bodies are added as needed. Many of these items appear with short notice to the TAG and with very short response times. The RR-TAG agenda can be found on the RR-TAG’s Mentor web site; expect that as normal there will be many revisions prior to the start of the meeting. Please check it for items of interest that may not be listed in the Opening Report. IEEE 802.18 is contribution driven so it is reasonable to expect that other matters may present themselves during the meeting here in San Diego. Don’t forget that for the most part you can maintain your voting rights in your home group when you participate in the RR-TAG (and, of course, log your attendance correctly!).
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.