Presentation is loading. Please wait.

Presentation is loading. Please wait.

Doc.: 11-10-0801-01 Submission July 2010 D. Stanley (Aruba), B.Kraemer (Marvell) Slide 1 P802.11REVmb Report to EC on Conditional Approval to go to Sponsor.

Similar presentations


Presentation on theme: "Doc.: 11-10-0801-01 Submission July 2010 D. Stanley (Aruba), B.Kraemer (Marvell) Slide 1 P802.11REVmb Report to EC on Conditional Approval to go to Sponsor."— Presentation transcript:

1 doc.: 11-10-0801-01 Submission July 2010 D. Stanley (Aruba), B.Kraemer (Marvell) Slide 1 P802.11REVmb Report to EC on Conditional Approval to go to Sponsor Ballot Date: 2010-07-15 Authors:

2 doc.: 11-10-0801-01 Submission July 2010 D. Stanley (Aruba), B.Kraemer (Marvell) Slide 2 Introduction This document contains the report to the IEEE 802 Executive Committee in support of a request for conditional approval to send P802.11REVmb to Sponsor Ballot. This document (11-10/0801r1) was approved during the closing plenary session of the 802.11 working group on 2010-7-16. –Passed in the Task Group 9-0-0 –Passed in the Working Group x-x-x

3 doc.: 11-10-0801-01 Submission July 2010 D. Stanley (Aruba), B.Kraemer (Marvell) Slide 3 Draft text stability 1100 1300 1500 1700 1900 2100 2300 June-07 May-09Dec-09Mar-10Jun-10 # pages 1.0 2.0 3.0 4.0 11w added (1671) 11n added (2132) 11k,r,y added (1602) Std 802.11-2007 (1184) 2500 (2109)

4 doc.: 11-10-0801-01 Submission July 2010 D. Stanley (Aruba), B.Kraemer (Marvell) Slide 4 WG Letter Ballot Results Ballot ID Ballot Close Date Draft Number Ballot TypePoolReturn%ReturnAbstain % Abstain Appr ove Disap prove %Appro ve 1492009-6-27Draft 1.0Initial2462078429141552387 1602010-1-8Draft 2.0Recirculation246211862511.81662089 1622010-4-25Draft 3.0Recirculation246212862511.81672089 1632010-6-25Draft 4.0Recirculation246212862813.21642089

5 doc.: 11-10-0801-01 Submission July 2010 D. Stanley (Aruba), B.Kraemer (Marvell) Slide 5 802.11 WG Letter Ballot Comments Ballot ID Ballot Close Date DraftBallot Type Number of Comments received 1492009-6-27Draft 1.0Initial730 (491T, 239E) 1602010-1-8Draft 2.0Recirculation246 (188T, 58E) 1622010-4-25Draft 3.0Recirculation149 (129T, 20E) 1632010-6-25Draft 4.0Recirculation98 (57T, 41E)

6 doc.: 11-10-0801-01 Submission July 2010 D. Stanley (Aruba), B.Kraemer (Marvell) Slide 6 Unsatisfied comments by commenter VoterLB149LB160LB162LB 163Total Bagby, Dave44 Bajko, Gabor55 Cam-Winget, Nancy22 Chu, Liwen23730 Erceg, Vinko22 Harkins, Dan44 Hiertz, Guido112 Marshall, Bill11 Myles, Andrew44 Rosdahl, Jon142510150 Stephenson, Dave2349 Vlantis, George55 Total31353715118

7 doc.: 11-10-0801-01 Submission July 2010 D. Stanley (Aruba), B.Kraemer (Marvell) Slide 7 Updates since last ballot 8 Commenters have indicated that all their comments are satisfied/resolved. –L. Armstrong: “my comments are now satisfied. “ –J. Malinen:” all my comments have been resolved “ –D. Cypher:” all of my comments have been satisfied “ –Y. Seok:” I withdraw those comments “ –D. Engwer:” I am satisfied with the resolution of all my TGmb comments. “ –H. Ptasinski:” All my comments are satisfied and I hereby change my vote to Yes” –A. Stephens: “I hereby withdraw my comments “ –M Hamilton: “I accept the TGmb comment resolutions “

8 doc.: 11-10-0801-01 Submission July 2010 D. Stanley (Aruba), B.Kraemer (Marvell) Slide 8 Unsatisfied comments The composite of all unsatisfied comments and the resolutions approved during working group ballot is attached. –Double click on the icon to the right to open this. A copy of the unsatisfied comments presented using MyBallot access database report format is attached. –Double click on the icon to the right to open this.

9 doc.: 11-10-0801-01 Submission July 2010 D. Stanley (Aruba), B.Kraemer (Marvell) Slide 9 Timeline Fourth recirculation (Draft 5.0) Open 2010-7-29 Close 2010-8-14 Clean recirculation (Draft 5.0)2010-8-232010-9-1 Pool formation (45 days)2010 July/Aug First sponsor ballot2010-10-192010-11-18 Second sponsor ballot2011-2-32011-2-18 Third sponsor ballot2011-3-302011-4-15 Fourth sponsor ballot2011-5-152011-5-30 Final Recirc (10 days) EC to RevCom 2011-6-10 2011 July RevCom to SB2011 Sept

10 doc.: 11-10-0801-01 Submission July 2010 D. Stanley (Aruba), B.Kraemer (Marvell) Slide 10 802.11 EC Motion – Conditional Approval to send P802.11mb to Sponsor Ballot Grant conditional approval to forward P802.11mb to Sponsor Ballot. Moved: Bruce Kraemer 2 nd : –Yes No Abstain Working Group 11 vote on the Motion Passed: xx y, x n, x a


Download ppt "Doc.: 11-10-0801-01 Submission July 2010 D. Stanley (Aruba), B.Kraemer (Marvell) Slide 1 P802.11REVmb Report to EC on Conditional Approval to go to Sponsor."

Similar presentations


Ads by Google