Download presentation
Presentation is loading. Please wait.
Published byPranav Germany Modified over 10 years ago
1
doc.: IEEE 802.11-09/0715r6 Submission July 2009 Stephen McCann (RIM), Bruce Kraemer (Marvell) Slide 1 P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot Authors: NameAffiliationAddressPhoneemail Stephen McCann Research in Motion 200 Bath Road, Slough, Berks, SL1 3XE, UK +44 1753 667099 smccann@rim.com Bruce KraemerMarvell 5488 Marvell Lane, Santa Clara, CA 95054 +1 (321) 427-4098 bkraemer@marvell.com
2
doc.: IEEE 802.11-09/0715r6 Submission July 2009 Stephen McCann (RIM), Bruce Kraemer (Marvell) Slide 2 Introduction This document contains the report to the IEEE 802 Executive Committee in support of a request for conditional approval to send the IEEE P802.11u Draft to Sponsor Ballot. This document (11-09-0715r5) was approved during the closing plenary session of the 802.11 working group on 17 July 2009. –Passed in the Task Group yes 14, no 1, abstain 0 –Passed in the Working Group yes, no, abstain
3
doc.: IEEE 802.11-09/0715r6 Submission July 2009 Stephen McCann (RIM), Bruce Kraemer (Marvell) Slide 3 802.11 WG Letter Ballot Results – P802.11u Ballo t ID Ballot Close Date TitleBallotTypePoolReturn%Rtn Abstai n %AbsApprove Disa ppr ove %Approve 13212 July 2008 Technical Letter Ballot for IEEE 802.11u_D3.0 Technical21318285.53519.21133476.9 13708 October 2008 Recirculation Letter Ballot for IEEE 802.11u_D4.0 Recirculation21318988.73719.61183477.6 14220 February 2009 Recirculation Letter Ballot for IEEE 802.11u_D5.0 Recirculation21319189.73920.41252782.2 14824 April 2009 Recirculation Letter Ballot for IEEE 802.11u_D6.0 Recirculation21319290.13518.21421590.4 15219 June 2009 Recirculation Letter Ballot for IEEE 802.11u_D7.0 Recirculation21319491.03317.01421988.2 152. 1 LB152 Post Ballot vote changes 21319491.03317.01461590.7
4
doc.: IEEE 802.11-09/0715r6 Submission July 2009 Stephen McCann (RIM), Bruce Kraemer (Marvell) Slide 4 802.11 WG Letter Ballot Comments – P802.11u Ballot ID Ballot Close Date TitleBallot Type Number of Comments received 13212 July 2008 Technical Letter Ballot for TGu Draft 3.0 Technical944 (525 T, 419 E) 1378 Oct 2008 Recirculation Letter Ballot for TGu Draft 4.0 Recirculation871 (487 T, 384 E) 14220 Feb 2009 Second Recirculation Ballot for TGu Draft 5.0 Recirculation241 (35 T, 206 E) 148 24 April 2009 Third Recirculation Ballot for TGu Draft 6.0 Recirculation229 (125 T, 104 E) 15219 Jun 2009 Fourth Recirculation Ballot for TGu Draft 7.0 Recirculation225 (118 T, 107 E)
5
doc.: IEEE 802.11-09/0715r6 Submission July 2009 Stephen McCann (RIM), Bruce Kraemer (Marvell) Slide 5 July 2009 Stephen McCann (RIM), Bruce Kraemer (Marvell) Slide 5 Unsatisfied comments by commenter Voter1LB132LB137LB142LB148LB152 Total Gabor Bajko15 Clint Chaplin12021 Peter Ecclesine44 Darwin Engwer22 Tom Kolze231219 Alastair Malarky88 Henry Ptasinski1710431 Richard Roy66 Dorothy Stanley411015 Alexander Tolpin11 George Vlantis223 Qi Wang66 Total25135573121
6
doc.: IEEE 802.11-09/0715r6 Submission July 2009 Stephen McCann (RIM), Bruce Kraemer (Marvell) Slide 6 Unsatisfied Comments – Topics Topic#Comments Interworking15 Generic Advertisement Service44 Subscription Provider Interface15 Emergency Services11 Editorial28 Other10 Total121
7
doc.: IEEE 802.11-09/0715r6 Submission July 2009 Stephen McCann (RIM), Bruce Kraemer (Marvell) Slide 7 Unsatisfied comments The composite of all unsatisfied comments and the resolutions approved by the comment resolution committee received during working group ballot may be found in the embedded document on the right: –Double click on the icon to the right to open this. A copy of this same data presented using MyBallot access database report format is attached. –Double click on the icon to the right to open this.
8
doc.: IEEE 802.11-09/0715r6 Submission July 2009 Stephen McCann (RIM), Bruce Kraemer (Marvell) Slide 8 TGu Timeline OpenClose Third recirculation (TGu draft 8.0)26-Jul-0910-Aug-09 Clean recirculation (TGu draft 8.0)28-Sep-0913-Oct-09 Pool formation15-Aug-0929-Sep-09 First sponsor ballot21-Oct-0920-Nov-09 Second sponsor ballot31-Jan-1015-Feb-10 Third sponsor ballot17-Mar-102-Apr-10 Fourth sponsor ballot1-May-1016-May-10 EC to RevCom Mar-10 (cond.) or Jul-10 RevCom to SB Sep-10
9
doc.: IEEE 802.11-09/0715r6 Submission July 2009 Stephen McCann (RIM), Bruce Kraemer (Marvell) Slide 9 802.11 EC Motion on Conditional Approval to send P802.11u to Sponsor Ballot Grant conditional approval, under Clause 13, to forward P802.11u to Sponsor Ballot. P802.11u currently has a 90% approval. Working Group 11 vote on the Motion Passed: y, n, a Moved: 2 nd : –Yes No Abstain
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.