EPOCH 1000 Series Procedure Conventional Straight Beam Calibration
2
Required Items Transducer Test Block Cable A109S-RM Couplant
2214E (5-step in) Cable BCM-74-6 Couplant D-12
3
Initial Settings Basic Menu Pulser Menu Receiver Menu
Velocity in/µs (long. wave in steel) Range – in Pulser Menu PRF Mode- Auto Low Energy- 100V Damping- 50 Ω Mode- P/E (pulse-echo) Pulser- Square Freq- 5MHz Receiver Menu Filter Group- Standard Filter Rectification- Full
4
Zero Calibration Set the Gain to 6.0dB
.500 .400 .300 .200 .100 Set the Gain to 6.0dB Couple the transducer to the in step Set Gate 1 so that it surrounds the first backwall echo from the in step Use Auto-XX to adjust the gain so that the signal is at 80%
5
Zero Calibration (cont.)
Press the Auto CAL key to bring up the Calibration menu Make sure the CAL Mode is set to Thickness *(If more than just Gate 1 is active you will have other options for CAL Mode) Press [P3] for CAL Zero Enter in the dialog box Press the Check key to continue on to the Velocity calibration
6
Velocity Calibration Couple the transducer to the 0.500 in step
.400 .300 .200 .100 Couple the transducer to the in step Set Gate 1 so that it surrounds the first backwall echo from the in step Use Auto-XX to adjust the gain so that the signal is at 80%
7
Velocity Calibration (cont.)
Press [P2] for CAL Velocity Enter in the dialog box Use the right arrow to scroll to Calculate and then press the Check key to complete the calibration *If you are ONLY doing a velocity calibration, press Check to continue Adjust the Range back to the starting value of in
8
Calibration Complete! Verify that your unit is properly calibrated by checking the thickness measurement at each step on the block. NOTE: Make sure to move the gate so it surrounds the first backwall echo for each step you are on.