Download presentation
Presentation is loading. Please wait.
Published byGabrielle McLain Modified over 10 years ago
2
CS-PR-230 13.12.1 – Cost Roll-Up Freeze/Unfreeze Sets costs so roll-up functions do not recalculate Used in accordance with your setting of standards Speeds up the roll-up calculations Cost may still be over-ridden manually Unfreeze when setting new standards
3
CS-PR-024 Move Current Costs to GL Roll Up Product Struct. Cost Roll Up Routing Costs Freeze GL Costs (13.12.1) Standard Costing Process
4
CS-PR-210 1.4.22 – Current Cost Set Move to GL Set
5
CS-PR-023 Move Current Costs to GL (1.4.22) Roll Up Product Struct. Costs Roll Up Routing Costs Freeze GL Costs Standard Costing Process
6
CS-PR-101 13.12.4 – Product Structure Cost Report
7
CS-PR-100 13.12.13 – Product Structure Cost Roll-Up
8
CS-PR-022 Move Current Costs to GL Roll Up PS Costs (13.12.13) Roll Up Routing Costs Freeze GL Costs Standard Costing Process
9
CS-PR-080 14.13.13 – Routing Cost Roll-Up
10
CS-SU-295 Labor Cost Per Operation Set-Up Cost = (Set-Up Hrs / Order Qty) x WC Set-Up Rate Run Cost = Run Hrs x WC Labor Rate Labor Cost = Set-Up Cost + Run Cost Routing Cost Calculations: Review Labor Burden Cost Per Operation Set-Up Burden Burden = (Set-Up Hrs / Order Qty) x WC Lbr Bdn Rate Burden % = (Set-Up Hrs / Order Qty) x WC Set-Up Rate x WC Lbr Bdn% Run Cost Burden Burden = Run Hrs x WC Lbr Bdn Rate Burden % = Run Hrs x WC Lbr Rate x WC Lbr Bdn% Machine Burden Cost Per Operation Set-Up = (Set-Up Hrs / Order Qty) x (Mach / Op) x WC Mach Bdn Rate Run = Run Hrs x WC Mach Bdn Rate
11
CS-PR-040 Work Center Maintenance, 14.5 Routing Maintenance, 14.13.1 Item Master Maintenance, 1.4.1 Order Quantity Setup and Run Times Yield % Setup & Labor Rates Labor Bdn Rate & % Setup & Labor Rates Labor Bdn Rate & % Machines/Op Machine Burden Rate Machines/Op Machine Burden Rate Routing Cost Roll-Up Calculations Based On...
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.