St Croix River Crossing S.P. 8221-82045 Contractor Information Meeting 15 May 2013 River Spans
2
General Arrangement
3
Main Span 3360' single structural unit Expansion joints at Pier 7 and East Abutment 600' extradose spans Twin wall pier legs to address time dependent and thermal effects
4
Towers
5
Tower Sections
7
Main Span - Reinforcing Reinforcing Grade Generally grade 60, except: Verticals on crossbeam – Gr 75 Deck level stay anchor blocks Gr 75 Corrosion Protection Generally epoxy coated except: Pier 8 legs for 10' below knuckle – SS Deck top slab reinforcing – SS
8
Main Span - Concrete Concrete – Substructure and Towers Generally 6000 psi @ 28 days, except: Towers 24' below to 3' above crossbeam 8000 psi @ 56 days Concrete - Deck Generally 8000 psi @ 56 days, except: First 8 precast deck segments 9000 psi @ 180 days
9
Tower – Leg Reinforcing
10
Tower Reinfrocing
11
Tower Reinforcing
13
Tower - Crossbeam
14
Tower – Crossbeam PT
15
Tower - Crossbeam PT
17
Tower Crossbeam Node PT
18
Tower Crossbeam Node Reinforcing
20
Pylon Crossbeam Node
22
CIP Pier Table
23
Upper Tower
24
Tower - Anchor Box
25
Tower Anchor Box
26
Stay Cables Parallel Strand Stay Cable System All stays 76 – 0.62" stays Working at higher load than cable stays (0.52 fpu) Live end in tower Testing requirements per 6 th Edition of PTI Recommendations for Stay Cable Design Testing and Installation Internal dampers required at lower end Damping required – 2.5% log dec – confirm by testing
27
Pier 13 General Arrangement
28
Typical Deck Section
29
Deck Section at Stay Anchorage
30
Typical Deck Section
31
Deck Section at Transition
32
Tower 8 Deck Segmentation
33
Tower 9, 10 and 11 Deck Segmentation
34
Tower 12 Deck Segmentation
35
Span 14 Deck Segmentation
36
Segments Weights 7.5' segments ≤ 140 tons 8.5' segments ≤ 130 tons Typical 10' segments ≤ 165 tons 10 ' stay anchor segments ≤ 180 tons
37
Tower 8, 9, 10, and 11 Tendon Layout
38
Tendon Layout Span 14
39
Bottom Tendons – Span 14
40
Continuity Tendons Span 8
41
Typical Continuity Tendons
42
Continuity Tendons Spans 13 and 14
43
Typical Future PT
44
Typical Deck Segments
45
Typical Bulkhead
46
Typical Segment Reinforcing
47
Blisters
48
Transverse Deck PT
49
Belvederes
50
Belvederes - PT
51
Belvederes
52
Belvederes – Reinforcing
53
St Croix River Crossing S.P. 8221-82045 Contractor Information Meeting 15 May 2013 River Span - Construction
54
Pier Table Construction
57
Global Construction Scheme
58
Deck Erection Pier 8
59
Segment Lifter Max segment weight 180 tons Lifting frame weight 145 tons Stressing platform 17 tons Transporter 33 tons, 7 axles at 4'-3"
60
Segment Lifter
61
Deck Erection Pier 8
66
Deck Erection Pier 13 to East Abutment
67
Sequence Pier 13 to East Abutment
68
Deck Erection Pier 13 to East Abutment
69
Sequence Pier 13 to East Abutment
71
Longitudinal Infill
73
Stay Strut Erection