Download presentation
Presentation is loading. Please wait.
Published byDawson Durall Modified over 10 years ago
2
Crashes at rural STOP controlled Intersections Primary cause where drivers stopped before entering:
3
Minor Road Warning Major Road Warning
6
Safety project to include: ◦ Intersection Conflict Warning System Installation in Spring 2013 3-5 Year Contractor System Warranty ◦ Rural Highway Lighting MnDOT Safety Unit estimates 15% reduction in crashes due to lighting.
7
Top 20 Intersections Lyon County Intersection
8
MnDOT Participation ◦ $100,000 to Furnish and Install the system ◦ Connecting to Power ◦ RICWS Maintenance and Repairs after the Contractor Warranty ◦ Utility Locates Requested County Participation ◦ RICWS Monthly Power (estimated at $5-10 monthly) ◦ Highway Lighting Power ◦ Highway Lighting Maintenance and Repairs
9
RICWS Project Manager: Ken Hansen MnDOT Office of Traffic Safety and Technology ITS Project Manager (651)234-7064 Kenneth.Hansen@state.mn.us http://www.dot.state.mn.us/designbuild/RICWS/
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.