Presentation is loading. Please wait.

Presentation is loading. Please wait.

Slide title In CAPITALS 50 pt Slide subtitle 32 pt IP Migration & Activation - P6.

Similar presentations


Presentation on theme: "Slide title In CAPITALS 50 pt Slide subtitle 32 pt IP Migration & Activation - P6."— Presentation transcript:

1 Slide title In CAPITALS 50 pt Slide subtitle 32 pt IP Migration & Activation - P6

2 Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level 2-5 20 pt 2007-11-012 Agenda  IP Transport in P6  IP Migration Order  IP Configuration  Use Cases –Prepare RNC for IP Iub –Add new IP RBS –Migrate ATM RBS to IP –Migrate Iu to IP –Migrate Iur to IP  CPI References

3 Slide title In CAPITALS 50 pt Slide subtitle 32 pt IP Transport in P6 WCDMA RAN interfaces

4 Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level 2-5 20 pt 2007-11-014 IP Transport in P6 WCDMA RAN Logical Interfaces to CN MSC CN WRAN SGSN Nc BICC MSC M-MGW Nb RNC Iub CP/UP RBS Iur CP Iur UP Iu-PS CP/UP Iu-PS CP/UP Mc Iu-CS UP Iu-CS CP Tunnel IPBCP RNSAP RANAP NBAP

5 Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level 2-5 20 pt 2007-11-015 IP Transport in P6 WCDMA RAN Logical Interfaces to CN Possible to Migrate to IP since P5 MSC CN WRAN SGSN Nc MSC M-MGW Nb RNC Iub CP/UP RBS Iur CP Iur UP Iu-PS CP/UP Iu-PS CP/UP Mc Iu-CS UP Iu-CS CP RNSAP RANAP NBAP

6 Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level 2-5 20 pt 2007-11-016 IP Transport in P6 WCDMA RAN Logical Interfaces to CN Possible to Migrate to IP in P6 MSC CN WRAN SGSN Nc MSC M-MGW Nb RNC Iub CP/UP RBS Iur CP Iur UP Iu-PS CP/UP Iu-PS CP/UP Mc Iu-CS UP Iu-CS CP RNSAP RANAP NBAP

7 Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level 2-5 20 pt 2007-11-017 IP Transport in P6 Iub Protocols from ATM to IP Control PlaneUser Plane DCH, HS-DSCH, E-DCH FACH, PCH, RACH FPs NBAP Transport Network Layer Radio Network Layer Radio Network Control Plane ALCAP (Q.2630, Q.2150.2) Physical Layer (E1, J1, STM-1 etc) Transport Network Control Plane Radio Network User Plane Node Synch AAL2 SAAL-UNI ATM AAL0 SAAL-UNI Ethernet and Node Sync (over FACH) IP UDP SCTP Network Synch NTP

8 Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level 2-5 20 pt 2007-11-018 IP Transport in P6 Iur Protocols Iur User Plane Frame Protocols RNSAP Transport Network Layer Radio Network Layer Iur Control Plane IP Ethernet SCTP UDP IP Iur User Plane M3UASCCP

9 Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level 2-5 20 pt 2007-11-019 IP Transport in P6 Iu-CS Protocols Iu-cs User Plane Frame Protocols RANAP Transport Network Layer Radio Network Layer Iu-cs Control Plane IP Ethernet SCTP UDP IP Iu User Plane M3UASCCP RTP

10 Slide title In CAPITALS 50 pt Slide subtitle 32 pt IP Migration order Recommended ways to migrate from ATM to IP

11 Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level 2-5 20 pt 2007-11-0111 IP Migration order Procedure overview Planning Prepare RNC for Iu Prepare RNC for Iur Migrate Iu Migrate Iub Migrate Iur Add Iub Tidy up Prepare RNC for Iub

12 Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level 2-5 20 pt 2007-11-0112 IP Migration order Procedure overview  Recommended IP Migration order: 1.Prepare RNC for IP Iub 2.Add new IP RBS 3.Migrate ATM RBS to IP 4.Migrate Iu 5.Migrate Iur

13 Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level 2-5 20 pt 2007-11-0113 IP Migration order Procedure overview Planning output  WCDMA RAN Migration Plan: Hardware changes Site infrastructure Software upgrade plan Migration order, per node and interface  IP Address Plan (traffic and O&M)  IP TN Design  O&M Network Design  Network Sync Plan

14 Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level 2-5 20 pt 2007-11-0114 IP Migration order Procedure Overview Planning Prepare RNC for Iu Prepare RNC for IurMigrate IuMigrate IubMigrate IurAdd Iub Tidy up Prepare RNC for Iub Procedures: RNC CPI Tools: OSS CPI Steps: - RNC Hardware configuration is reviewed - Configuration files are prepared Important: -Iu-CS control plane, Iu-PS control & user plane might be already on IP since P5 - Iu-CS user plane migration to IP is not delivered to FOA

15 Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level 2-5 20 pt 2007-11-0115 IP Migration order Procedure Overview Planning Prepare RNC for Iu Prepare RNC for Iur Migrate Iu Migrate IubMigrate IurAdd Iub Tidy up Prepare RNC for Iub Procedures: RNC CPI Tools: OSS CPI Steps: - IP-based Iu configuration is activated in RNC - ATM-based configuration remains, inactive

16 Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level 2-5 20 pt 2007-11-0116 IP Migration order Procedure Overview Planning Prepare RNC for Iu Prepare RNC for IurMigrate IuMigrate IubMigrate IurAdd Iub Tidy up Prepare RNC for Iub Procedures: RNC CPI Tools: OSS CPI Steps: - ATM configuration is removed

17 Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level 2-5 20 pt 2007-11-0117 IP Migration order Procedure Overview Planning Prepare RNC for Iur Migrate IubMigrate IurAdd Iub Prepare RNC for Iu Migrate Iu Tidy up Prepare RNC for Iub Procedures: RNC CPI Tools: OSS CPI Steps: - RNC Hardware configuration is reviewed - Configuration files are prepared for all involved RNC nodes

18 Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level 2-5 20 pt 2007-11-0118 IP Migration order Procedure Overview Planning Prepare RNC for Iur Migrate Iub Migrate Iur Add Iub Prepare RNC for Iu Migrate Iu Tidy up Prepare RNC for Iub Procedures: RNC CPI Tools: OSS CPI Steps: -IP-based configuration is activated in RNC and relevant neighbor RNCs - ATM-based configuration remains, inactive

19 Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level 2-5 20 pt 2007-11-0119 IP Migration order Procedure Overview Planning Prepare RNC for Iur Migrate IubMigrate IurAdd Iub Prepare RNC for Iu Migrate Iu Tidy up Prepare RNC for Iub Procedures: RNC CPI Tools: OSS CPI Steps: - ATM configuration is removed

20 Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level 2-5 20 pt 2007-11-0120 IP Migration order Procedure Overview Planning Prepare RNC for Iu Prepare RNC for IurMigrate IuMigrate IubMigrate IurAdd Iub Tidy up Prepare RNC for Iub Procedures: RNC CPI Tools: OSS CPI Steps: - RNC hardware configuration is reviewed - Configuration files are prepared

21 Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level 2-5 20 pt 2007-11-0121 IP Migration order Procedure Overview Planning Prepare RNC for Iu Prepare RNC for IurMigrate Iu Migrate Iub Migrate IurAdd Iub Tidy up Prepare RNC for Iub Procedures: RNC, RBS CPI Tools: OSS CPI Steps: - IP-based configuration is activated in RNC then in the RBS - ATM-based configuration remains, inactive

22 Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level 2-5 20 pt 2007-11-0122 IP Migration order Procedure Overview Planning Prepare RNC for Iu Prepare RNC for IurMigrate IuMigrate IubMigrate IurAdd Iub Tidy up Prepare RNC for Iub Procedures: RNC, RBS CPI Tools: OSS CPI Steps: - ATM configuration is removed

23 Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level 2-5 20 pt 2007-11-0123 IP Migration order Procedure Overview Planning Prepare RNC for Iu Prepare RNC for IurMigrate IuMigrate IubMigrate Iur Add Iub Tidy up Prepare RNC for Iub Procedures: RNC, RBS & OSS CPI Tools: OSS CPI Steps: - Configuration for new Iub is activated in RNC and RBS

24 Slide title In CAPITALS 50 pt Slide subtitle 32 pt IP Configuration An Overview of IP Transport Configuration

25 Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level 2-5 20 pt 2007-11-0125 IP Configuration SIGTRAN

26 Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level 2-5 20 pt 2007-11-0126 IP Configuration SIGTRAN MOComment IpAccessHostGpbassociated with the active SCCP MP Sctpone Sctp MO per IpAccessHostGpb MO M3uAssociationone M3uAssociation MO per SS7 connection

27 Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level 2-5 20 pt 2007-11-0127 IP Configuration Iu-PS user plane 0..10 0..16 0..32 RncFunction CnOperator luLink IpEthPacketDataRouter 1 0..2 IpAccessHostSpb 0..4

28 Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level 2-5 20 pt 2007-11-0128 IP Configuration Iu-PS user plane MOComment IpAccessHostSpbone IpAccessHostSpb MO per PDR Device IpEthPacketDataRoutertwo instances of MO IpEthPacketDataRouter per PDR Device

29 Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level 2-5 20 pt 2007-11-0129 IP Configuration Iur user plane 0..16 0..1 RncFunction IurLink IpAccessHostPool IpAccessHostEt

30 Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level 2-5 20 pt 2007-11-0130 IP Configuration Iur user plane MOComment IpAccessHostEtone IpAccessHostEt MO per ET-MFG board used for Iur IpAccessHostPoolone IpAccessHostPool

31 Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level 2-5 20 pt 2007-11-0131 IP Configuration Iub in RNC 0..16 0..1 RncFunction IubLink IpAccessHostPool IpAccessHostEt

32 Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level 2-5 20 pt 2007-11-0132 IP Configuration Iub in RNC MOComment IpAccessHostEtone IpAccessHostEt MO per ET-MFX board used for Iub IpAccessHostPoolone instance of IpAccessHostPool for Iub user plane

33 Slide title In CAPITALS 50 pt Slide subtitle 32 pt Use Case: Prepare RNC for IP Iub

34 Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level 2-5 20 pt 2007-11-0134 Use Case: Prepare RNC for IP Iub  Prerequisites: –All involved nodes are upgraded to P6 software –IP addresses are allocated

35 Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level 2-5 20 pt 2007-11-0135 Use Case: Prepare RNC for IP Iub Type of IP AddressNumber of IP adresses Iub Control Planemin 6, max 66 (2 per IpAccessHostGpb on each module MP, min 3 max 33) Iub User Planemin 2, max 17 (1 per IpAccessHostEt on ET-MFX) Default gatewaymin 1, max 3 subnet+broadcast2 (1 for subnet and 1 for broadcast)

36 Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level 2-5 20 pt 2007-11-0136 Use Case: Prepare RNC for IP Iub  Prerequisites: –All involved nodes are upgraded to P6 software –IP addresses are allocated –IP backbone is prepared –Configuration files are prepared

37 Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level 2-5 20 pt 2007-11-0137 Use Case: Prepare RNC for IP Iub  Configuration: –Set cchDscpEgress, cchDscpIngress –Create an IpInterface for each ET-MFX –Configure Iub User Plane and Control Plane –Create one IpAccessHostEt for each ET-MFX –Create one IpAccessHostPool –Create IpAccessHostGpb MO for each RNC Module –Find the RPU to be used when creating the Sctp MO –For each IpAccessHostGPB create one Sctp MO

38 Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level 2-5 20 pt 2007-11-0138 Use Case: Prepare RNC for IP Iub  Procedure: 1.Add ET-MFX in the RNC 2.Configure sync servers in RNC 3.Create Planned Area in OSS 4.Activate configuration files 5.Create CV in RNC

39 Slide title In CAPITALS 50 pt Slide subtitle 32 pt Use Case: Add new IP RBS

40 Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level 2-5 20 pt 2007-11-0140 Use Case: Add new IP RBS  Prerequisites: –All involved nodes are upgraded to P6 software –IP addresses are allocated

41 Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level 2-5 20 pt 2007-11-0141 Use Case: Add new IP RBS Type of IP AddressNumber of IP adresses Iub Control Plane1 (1 per MP) Iub User Plane1 (1 per ET-MFX) Default gatewaymin 1, max 3 subnet+broadcast2 (1 for subnet and 1 for broadcast) Traffic

42 Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level 2-5 20 pt 2007-11-0142 Use Case: Add new IP RBS Type of IP AddressNumber of IP adresses IP host for O&M1 Site LAN4 (typical) Default gateway1 (typical) subnet+broadcast2 (1 for subnet and 1 for broadcast) O&M

43 Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level 2-5 20 pt 2007-11-0143 Use Case: Add new IP RBS  Prerequisites: –All involved nodes are upgraded to P6 software –IP addresses are allocated –IP backbone is prepared –O&M network is prepared –RNC is prepared for IP-based Iub –Network sync server is configured –Configuration files are prepared

44 Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level 2-5 20 pt 2007-11-0144 Use Case: Add new IP RBS  Configure Iub User Plane and Control Plane: –Create one IpAccessHost Gpb MO –Create one Sctp MO –Create one Iub MO –Create one NbapCommon MO –Create one NbapDedicated MO

45 Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level 2-5 20 pt 2007-11-0145 Use Case: Add new IP RBS  Procedure: 1.Configure network sync, Mub & external hardware in RBS 2.Create CV in the RBS 3.Add RBS to OSS 4.Create Planned Area in OSS-RC 5.Activate configuration files for Iub in RBS and RNC 6.Create CV in all involved nodes 7.Activate configuration file for cell network in the RNC 8.Create CV in the RNC 9.Unlock cells 10.Verify traffic on RBS 11.Create CV in all involved nodes

46 Slide title In CAPITALS 50 pt Slide subtitle 32 pt Use Case: Migrate ATM RBS to IP

47 Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level 2-5 20 pt 2007-11-0147 Use Case: Migrate ATM RBS to IP  Prerequisites: –All involved nodes are upgraded to P6 software –IP addresses are allocated

48 Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level 2-5 20 pt 2007-11-0148 Use Case: Migrate ATM RBS to IP Type of IP AddressNumber of IP adresses Iub Control Plane1 (1 per MP) Iub User Plane1 (1 per ET-MFX) Default gatewaymin 1, max 3 subnet+broadcast2 (1 for subnet and 1 for broadcast)

49 Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level 2-5 20 pt 2007-11-0149 Use Case: Migrate ATM RBS to IP  Prerequisites: –All involved nodes are upgraded to P6 software –IP addresses are allocated –IP backbone is prepared –ATM RBS is equipped with CBU –There is a slot available for adding an ET-MFX –O&M network is prepared for migrating Mub to IP over Ethernet, including configuration in the O&M router –RNC is prepared for IP-based Iub –Network sync server is configured –Configuration files are prepared

50 Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level 2-5 20 pt 2007-11-0150 Use Case: Migrate ATM RBS to IP  Configure Iub User Plane and Control Plane: –Create one IpAccessHost Gpb MO –Create one Sctp MO –For existing Iub MO, create userPlaneIpResourceRef

51 Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level 2-5 20 pt 2007-11-0151 Use Case: Migrate ATM RBS to IP  Procedure (1/2): 1.Configure ET-MFX, network sync and Mub in the RBS 2.Create CV in the RBS 3.Verify O&M over Ethernet connectivity and sync over Ethernet 4.Create Planned Area in OSS-RC 5.Activate configuration files containing data for IP-based Iub in RBS and RNC 6.Create CV in all involved nodes 7.Lock IubLink 8.For the MOC IubLink in the RNC, change TransportOption for userPlane and controlPlane 9.For the MOC Iub in the RBS, change TransportOption for userPlane and controlPlane

52 Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level 2-5 20 pt 2007-11-0152 Use Case: Migrate ATM RBS to IP  Procedure (2/2): 10.Unlock IubLink 11.Create CV in all involved nodes 12.Verify traffic on migrated RBS 13.Activate configuration files to remove ATM configuration 14.Create CV in all involved nodes 15.Remove ATM boards

53 Slide title In CAPITALS 50 pt Slide subtitle 32 pt Use Case: Migrate Iu to IP

54 Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level 2-5 20 pt 2007-11-0154 Use Case: Migrate Iu to IP  Prerequisites: –All involved nodes are upgraded to P6 software –IP addresses are allocated

55 Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level 2-5 20 pt 2007-11-0155 Use Case: Migrate Iu to IP Type of IP AddressNumber of IP adresses Iu/Iur Control Plane2 (for IpAccessHostGpb used for SIGTRAN) Iu-CS/Iur User Plane2 (1 per ET-MFG with IpAccessHostEt) Iu-PS User Plane10 (2 per IpAccessHostSpb) RPS for secondary ET-MFG link min 0, max 2 (1 per ET-MFG where secondary link is used) Default gatewaymin 1, max 3 subnet+broadcast2 (1 for subnet and 1 for broadcast)

56 Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level 2-5 20 pt 2007-11-0156 Use Case: Migrate Iu to IP  Prerequisites: –All involved nodes are upgraded to P6 software –IP addresses are allocated –IP backbone is prepared –Core network is prepared –Configuration files are prepared

57 Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level 2-5 20 pt 2007-11-0157 Use Case: Migrate Iu to IP  Configuration: –Create one IpInterface MO for each ET-MFG board –Create one IpAccessHostGpb MO for each SCCP MP –Create one Sctp MO for each IpAccessHostGPB –One M3uAssociation MO and one Mtp3bSr MO are needed per SS7 connection that is migrated to ET-MFG –Create one IpAccessHostSpb MO and two IpEthPacketDataRouter instances per PDR SP

58 Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level 2-5 20 pt 2007-11-0158 Use Case: Migrate Iu to IP  Procedure: 1.Configure ET-MFG in RNC 2.Activate non traffic-affecting planned areas 3.Create CV in RNC 4.Check configuration in Core Network nodes 5.Activate configuration files 6.Create CV in RNC 7.Verify traffic on migrated interface 8.Remove ATM configuration 9.Create CV in all involved RNCs 10.Remove ATM board(s)

59 Slide title In CAPITALS 50 pt Slide subtitle 32 pt Use Case: Migrate Iur to IP

60 Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level 2-5 20 pt 2007-11-0160 Use Case: Migrate Iur to IP  Prerequisites: –All involved nodes are upgraded to P6 software –IP addresses are allocated

61 Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level 2-5 20 pt 2007-11-0161 Use Case: Migrate Iur to IP Type of IP AddressNumber of IP adresses Iu/Iur Control Plane2 (for IpAccessHostGpb used for SIGTRAN) Iu-CS/Iur User Plane2 (1 per ET-MFG with IpAccessHostEt) Iu-PS User Plane10 (2 per IpAccessHostSpb) RPS for secondary ET-MFG link min 0, max 2 (1 per ET-MFG where secondary link is used) Default gatewaymin 1, max 3 subnet+broadcast2 (1 for subnet and 1 for broadcast)

62 Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level 2-5 20 pt 2007-11-0162 Use Case: Migrate Iur to IP  Prerequisites: –All involved nodes are upgraded to P6 software –IP addresses are allocated –IP backbone is prepared –Configuration files are prepared

63 Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level 2-5 20 pt 2007-11-0163 Use Case: Migrate Iur to IP  Configuration: –Create one IpInterface for each ET-MFG board –Create IpAccessHostGpb MO for each RNC Module –Create one Sctp MO for each IpAccessHostGPB –One M3uAssociation MO and one Mtp3bSr MO is needed per SS7 connection that is migrated to ET-MFG –Create one IpAccessHostEt for each ET-MFG to be used –Create one IpAccessHostPool MO for Iur

64 Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level 2-5 20 pt 2007-11-0164 Use Case: Migrate Iur to IP  Prerequisites: –All involved nodes are upgraded to P6 software –IP addresses are allocated –IP backbone is prepared –Configuration files are prepared –OSS planned areas are prepared –Iur migration stategy is decided: Will all Iur links will be migrated at the same time ? Will Serving and Drift RNC will be migrated at the same time ?

65 Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level 2-5 20 pt 2007-11-0165 Use Case: Migrate Iur to IP  Procedure: 1.Configure ET-MFG in RNC 2.Activate non traffic-affecting planned areas 3.Create CV in RNC 4.Activate configuration files 5.Create CV in all involved RNCs 6.Verify traffic on migrated interface 7.Remove ATM configuration 8.Create CV in all involved RNCs 9.Remove ATM board(s)

66 Slide title In CAPITALS 50 pt Slide subtitle 32 pt CPI References RAN IP and Migration & Activation

67 Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level 2-5 20 pt 2007-11-0167 P6 CPI References RAN Documentation System Description – 137/1551-HSD 101 02/6 Transport Network Functionality – 138/1551-HSD 101 02/6 IP Transport Network Configuration – 5/1553-HSD 101 02/6 IP Infrastructure for O&M – 2/1553-HSD 101 02/6 Introduction of IP Transport in WCDMA RAN – 119/1553-HSD 101 02/6 Synchronisation – 84/1553-HSD 101 02/6 Transport Network Parameters – 87/1553-HSD 101 02/6 Transport Network Parameters, RAN5 – RAN6 Delta Information – 97/1553-HSD 101 02/6 HSDPA Migration and Activation – 95/1553-HSD 101 02/6 RDN and URL Naming Conventions – 74/1553-HSD 101 02/6

68 Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level 2-5 20 pt 2007-11-0168 P6 CPI References IP Migration & Activation (1/2) RAN: Introduction of IP Transport in WCDMA RAN – 119/1553-HSD 101 02/6 IP Transport Network Configuration – 5/1553-HSD 101 02/6 RBS: Migrate RBS on Site, Pre-configuration Phase - 897/1543-HRB 105 102/1 Migrate RBS on Site, Tidy Up Phase – 898/1543-HRB 105 102/1 RNC: ATM to IP Migration Instruction – 58/1543-FAB 102 614 RXI: Initial Ethernet Configuration Wizard - 37/1543-CNX 901 302 Jumper Cable Option for O & M - 4/1551-CNX 901 280 Migration of Mub/Mut from IP/ATM to IP/Ethernet - 3/1551-CNX 901 280 Set Network Synchronization Server- 36/1543-CNX 901 302 Board Configuration Wizard - 8/1543-CNX 901 302

69 Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level 2-5 20 pt 2007-11-0169 P6 CPI References IP Migration & Activation (2/2) OSS: Migrate RBS with ARW, Overview – 39/1543-4/AOM 901 038 Migrate RBS with ARW, Preparation Phase – 41/1543-4/AOM 901 038 Migrate RBS with ARW, Execution Phase - 40/1543-4/AOM 901 038 Migrate RBS with ARW, Tidy Up Phase - 42/1543-4/AOM 901 038 Migrate RBS with BCT, Execution Phase - 45/1543-4/AOM 901 038 Migrate RBS with BCT, Preparation Phase - 46/1543-4/AOM 901 038 Migrate RBS with BCT, Tidy Up Phase - 47/1543-4/AOM 901 038

70 Top right corner for field-mark, customer or partner logotypes. See Best practice for example. Slide title 40 pt Slide subtitle 24 pt Text 24 pt Bullets level 2-5 20 pt 2007-11-0170


Download ppt "Slide title In CAPITALS 50 pt Slide subtitle 32 pt IP Migration & Activation - P6."

Similar presentations


Ads by Google