Presentation is loading. Please wait.

Presentation is loading. Please wait.

ERP E NTERPRISE R ESOURCE P LANNING Every Monday, 13:30 – 16:00 Last Updated: 31 March 2009ERP – Ir. H. Noor Hidayat, MMT.1.

Similar presentations


Presentation on theme: "ERP E NTERPRISE R ESOURCE P LANNING Every Monday, 13:30 – 16:00 Last Updated: 31 March 2009ERP – Ir. H. Noor Hidayat, MMT.1."— Presentation transcript:

1 ERP E NTERPRISE R ESOURCE P LANNING Every Monday, 13:30 – 16:00 Last Updated: 31 March 2009ERP – Ir. H. Noor Hidayat, MMT.1

2 ERP Syllabus 1.Introduction 2.ERP Platform 3.ERP Component 4.ERP Development (Project Management Concerns) 5.System Life Cycle References: – Project Management Concerns, Chevron Texaco, 2005 Last Updated: 31 March 2009ERP – Ir. H. Noor Hidayat, MMT.2

3 ERP The 4 P’s People — the most important element of a successful project Product — the software to be built Process — the set of framework activities and software engineering tasks to get the job done Project — all work required to make the product a reality

4 ERP What is Software? Software is a set of items or objects that form a “configuration” that includes programs documents data...

5 ERP The Primary Goal: High Quality Remember: High quality = project timeliness Why? Less rework!

6 ERP Project Management Concerns

7 ERP Write it Down! SoftwareProjectPlan Project Scope EstimatesRisksSchedule Control strategy

8 ERP Project Risks What can go wrong? What is the likelihood? What will the damage be? What can we do about it?

9 ERP RISK Risk Management Paradigm control identify analyze plan track

10 ERP Building a Risk Table RiskProbabilityImpactRMMM RiskMitigationMonitoring&Management

11 ERP Effort Allocation 40-50% 30-40% “front end” activities – customer communication – analysis – design – review and modification construction activities – coding or code generation testing and installation – unit, integration – white-box, black box – regression 15-20%

12 ERP Use Automated Tools to Derive a Timeline Chart

13 ERP The “First Law” No matter where you are in the system life cycle, the system will change, and the desire to change it will persist throughout the life cycle. Bersoff, et al, 1980

14 ERP What Are These Changes? data otherdocuments code Test Project Plan changes in technical requirements changes in business requirements changes in user requirements software models

15 ERP Requirements Gathering Facilitated Application Specification Techniques Business Area Analysis Business Area Analysis Technical Area Analysis Technical Area Analysis Software Engineering Group Customer Group

16 ERP Change Control STOP

17 ERP Software Testing Testing is the process of exercising a program with the specific intent of finding errors prior to delivery to the end user.

18 ERP What Testing Shows errors requirements conformance performance an indication of quality

19 ERP Who Tests the Software? developer independent tester Understands the system but, will test "gently" and, is driven by "delivery" Must learn about the system, but, will attempt to break it and, is driven by quality

20 ERP Software Testing Methods Strategies white-box methods black-box methods

21 ERP White-Box Testing... our goal is to ensure that all statements and conditions have been executed at least once...

22 ERP Black-Box Testing requirements events input output

23 ERP Questions ???

24 ERP End of ERP Development Last Updated: 31 March 2009ERP – Ir. H. Noor Hidayat, MMT.24


Download ppt "ERP E NTERPRISE R ESOURCE P LANNING Every Monday, 13:30 – 16:00 Last Updated: 31 March 2009ERP – Ir. H. Noor Hidayat, MMT.1."

Similar presentations


Ads by Google