Download presentation
Presentation is loading. Please wait.
Published byWyatt Kestel Modified over 10 years ago
1
4” Diameter tube inserted into 21” riser at the seafloor (5000’) New riser allowing flow to the drillship Enterprise Oil separated & shipped ashore System designed to minimize the formation of hydrates Riser tube will also be equipped with methanol injection system to control hydrates Enterprise is capable of processing 15,000 bbls / day and can store 139,000 bbls Support barge is capable of storing 137,000 bbls Riser Insertion Tube
2
Blowout Preventer - Top Kill
4
The Incident Command Posts Unified Source Control – Houston Tx. Stack Intervention −Top Kill −Swing Valve −Split Stack Containment −Top hat −Hot tap Relief Wells −DD II −DD III Longer Term Options
5
The On-Site Command Post Tactical Response Team (TRT) – MC 252
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.