Presentation is loading. Please wait.

Presentation is loading. Please wait.

Quality Center 10.0 -Test Management Tool. Overview Test Lab Module Tasks Performed in Test Lab Module.

Similar presentations


Presentation on theme: "Quality Center 10.0 -Test Management Tool. Overview Test Lab Module Tasks Performed in Test Lab Module."— Presentation transcript:

1 Quality Center 10.0 -Test Management Tool

2 Overview Test Lab Module Tasks Performed in Test Lab Module

3 Analyzing Results Linking Activities

4 Analyzing Results Double click a test in the test set to open Test instance properties window. Select the run name and click on ‘Launch report’ icon. It will launch the Quick test report for that particular instance

5 Linking Defects QC will auto navigate you to the previous screen (summary of defects screen), and here we would have our newly raised/logged defect with a unique defect id auto assigned by QC

6 Linking Defects To create and link a new defect click ‘Add and link defect’ icon. It will open defects module, create a defect and save it. Created defect will be linked automatically to the test instance

7 Linking Defects To link an existing defect click on ‘link an existing defect’ icon. Link can be done in two ways. By defect ID By select the defect from defects module. Default is by defect ID. Give the defect ID and click on ‘Link’ icon


Download ppt "Quality Center 10.0 -Test Management Tool. Overview Test Lab Module Tasks Performed in Test Lab Module."

Similar presentations


Ads by Google