Download presentation
Presentation is loading. Please wait.
1
ODOT’s Structure Management System (SMS)
Mike Brokaw, P.E. Bridge Inspection Engineer Ohio Department of Transportation 1980 West Broad Street – Mail Stop 5180 Columbus, OH 43223
2
Why? Primary Secondary FHWA Metrics
MAP-21 Element Level Requirement on NHS Mainframe Interactive Updates Management System Inventory Inspection Maintenance Maps Queries Responsibility More User Friendly
3
Who? IT Bridge BA Vendor TEST NEEDS vs. WANTS
4
Who?
5
Who?
6
What? SMS is a web-based inspection, inventory, maintenance and management system that will replace the current mainframe Bridge Management System (BMS) BMS Data? Offline Version?
7
Step 1: Get a Username and Password to enter SMS
ODOT Employees You already have one, the Username and Password will be the same as your login for your ODOT computer (skip Step 2) “Externals”
8
Step 2: MyODOT (non-ODOT only)
Step 2a: URL
9
Step 2: MyODOT (non-ODOT only)
Step 2b: Request Basic Account
10
Step 2: MyODOT (non-ODOT only)
Step 2c: Request Basic Account
11
Step 2: MyODOT (non-ODOT only)
Step 2c: Complete Account Information Step 2c: Complete Account Information
12
Step 2: MyODOT (non-ODOT only)
Scenario 1 – Success!
13
Step 2: MyODOT (non-ODOT only)
Scenario 2 – Partial Success, You Already Have a MyODOT account If log-in fails after Go-Live then to place you in the system
14
Externals: “odotonline\” username
Step 3: Log In 5-10sec ODOT: “dot\” username Externals: “odotonline\” username
15
Main Dashboard_Default
16
Main Dashboard_Default
17
How?
18
How? Online Offline Paper
Structure-Management-System.aspx Online Offline Paper Or combination Browser CPU Standards
19
Step 4: Find a Bridge_Using the Tree
20
Step 4: Find a Bridge_Using the “Type Asset Name” field
21
Step 4: Finding a Bridge_Using the Child Assets
All Assets – 1.5 minutes
22
Step 4: Finding a Bridge_Using the Report Filter
23
Step 5: Found a Bridge_Asset Detail Page
Latest Inspection Data (Field Report)
24
Bridge Inspection Field Report
25
Batch Printing Field Reports
26
Step 5: Found a Bridge_Asset Detail Page
Inventory Only, Direct Access to Central Database values Both Inspection and Inventory, with a P.E. submission Process
27
Step 6: Create an Inspection Report
Select your report type and inspection type (multiple may be chosen)
28
Step 7: Within an Inspection Report
Ratings and Comment Inventory Shortcuts Navigation & Forms
29
Inspection Ratings and Comments
30
Inventory Shortcuts
31
Forms_Inspection
32
Forms_Misc
33
Forms_Inventory
34
Step 8: Submit Report_Within a Report
35
Step 9: Approve a Report
36
Step 8 or 9: Outside of a Report
37
When? Years? Months? Weeks? Considerations
Fixing known priority issues OSE - User IT – Data, Security, IQ Tables Stable Code – 3-4 weeks Black-out – 3-4 weeks Consideration for minimal interruption for the NBIS data submission Go Live?
38
When? Go Live will be in 2014
39
What Next? SMS Inspection Manual Element Level BMS Support
Assigning SFN’s Paper Copies Printing Out Last Inspection Reports SMS Users Training MyODOT Account
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.