Doug Raters, P.E. ODOT District 8 REA
PROPOSED RIGHT OF WAY DESIGN _______________________________________________________________
169
PROPOSED RIGHT OF WAY DESIGN
Section 3200 Types of Title
170
PROPOSED RIGHT OF WAY DESIGN
Section 3200 Types of Title
171
PROPOSED RIGHT OF WAY DESIGN
Section 3200 Types of Title
172
PROPOSED RIGHT OF WAY DESIGN
173
PROPOSED RIGHT OF WAY DESIGN
Construction Limits Defines minimum R/W required. Drawn +/- four feet beyond intersection of proposed back or fill slope and ex. ground line. Will include removal of any item inside proposed limits; signs, parking areas, structures, trees, (may include root system outside right of way limits)
175
Construction Limits
177
PROPOSED RIGHT OF WAY DESIGN
Establishing Right of Way Lines & Widths “The State shall acquire rights of way of such nature and extent as they are adequate for the construction, operation, and maintenance of a project.” Right of Way line, either permanent or temporary MUST encompass all construction limits. Factors to consider before establishing final R/W lines: Utilities Drainage Terrain Maintenance of Traffic Anticipated traffic volumes Access Land Use Future Maintenance Stage Construction Area Real Estate Values
178
WAR
179
Station
180
Station
181
Station
182
Station
183
Station
184
Station
185
When right of way is acquired at the begin/end of a project, consider acquisition thru the entire parcel…..
186
Proposed R/W Design - Limited Access
600’ 600’
187
Proposed R/W Design - Limited Access
188
Proposed R/W Design - Limited Access
189
PROPOSED RIGHT OF WAY DESIGN
Determining Types of Right of Way Parcel Takes Fee vs. Standard Highway Easement consider: Existing Right of Way Type of Title Most beneficial to owner (ODOT or Property) Property owner conflicts in the area Type of development in the area: Residential vs Commercial vs Industrial Encroachments Right of Way funding type (Federal/State/LPA) Mood of property owners being effected Ownership of PRO (present road occupied)
190
PROPOSED RIGHT OF WAY DESIGN
Cost effectiveness of Real Estate vs. Construction Design Must have open communications between R/W Design & Roadway Design Avoidance and proximity High Impacts on Real Estate vs. Tailored Construction Design
191
…..a R/W line too far... 15’ 15’
192
3-5’
195
68’ 48’ 53’
196
58’ 35’ 40’
197
PROPOSED RIGHT OF WAY DESIGN
Total Takes and/or Land Locked Parcels In Step 6 (Major), Step 3 (Minor) The design agency shall identify total take or landlocked parcels. Residential or commercial structures Excess Land Protective buys/Hardship acquisition Property Rights
198
PROPOSED RIGHT OF WAY DESIGN
EXCESS LAND
199
PROPOSED RIGHT OF WAY DESIGN EXCESS LAND
200
Maintenance of Traffic
201
M.O.T.
202
M.O.T.
203
PROPOSED RIGHT OF WAY DESIGN Property Rights
204
PROPOSED RIGHT OF WAY DESIGN
Property Rights
205
PROPOSED RIGHT OF WAY DESIGN
Property Rights
206
PROPOSED RIGHT OF WAY DESIGN ACCESS
211
PROPOSED RIGHT OF WAY DESIGN
Establishing Right of Way Lines and Widths Begin/End of
212
PROPOSED RIGHT OF WAY DESIGN
Encroachments and ADC Permit Plate No. Check advertising devices for valid permits Locate and show all encroachments within existing R/W
213
ENCROACHMENTS Encroachments
214
PROPOSED RIGHT OF WAY DESIGN
Access Control, Rules and Regulations ODOT’s goal to manage highway system effectively, reduce congestion, improve safety, operation. Access Management Manual
215
PROPOSED RIGHT OF WAY DESIGN
Drives- Commercial, Residential Etc. Identify ALL existing drives/access points. Review, evaluate drives to be relocated/closed. Appropriate drive widths Existing permits
216
ACCESS MANAGEMENT
217
ACCESS MANAGEMENT
218
PROPOSED RIGHT OF WAY DESIGN
Drainage Some major items of concern are: Open water course (ditches) Channels Storm sewers Catch basins Manholes Culverts Headwalls Field tiles Erosion control Post construction storm water management
219
PROPOSED RIGHT OF WAY DESIGN
Utility Conflicts and Relocation Railroad Property Adherence to Environment Document
220
PROPOSED RIGHT OF WAY DESIGN Post Construction Storm Water Management Plan
An example of a non-structural BMP would be street sweeping. Structural BMPs include the following: Vegetated Swales and Strips Infiltration Basins Infiltration Trenches Extended Detention (dry ponds) Retention Basins (wet ponds) Constructed Wetlands Bioretention Cells Manufactured Systems
221
Utilities
222
Utility Relocation Needs (2)
Utilities Utility Relocation Needs (2)
223
Proposed R/W Design - Railroad Plat
224
Proposed R/W Design - Railroad Plat
225
PROPOSED RIGHT OF WAY DESIGN
Environmental Concerns - Adherence to Environmental Document
226
PROPOSED RIGHT OF WAY DESIGN
Environmental Concerns - Adherence to Environmental Document
227
PROPOSED RIGHT OF WAY DESIGN
Environmental Concerns - Adherence to Environmental Document
228
Channel Easements-CH
229
Sewer -S
230
Temporary-T, problems?
231
Utility Easements-U
232
Avoid Headaches! If anything is unclear or there are issues or concerns, contact the District Real Estate Administrator early in the R/W design process.