Download presentation
Presentation is loading. Please wait.
Published byBrennen Claycomb Modified over 10 years ago
1
Renovation of Building 4950 Fort Stewart, GA
2
Corridors New HVAC system, drop ceiling, lighting, and textured walls.
Before: Exposed block walls, industrial lighting. No HVAC in corridors. Newly Renovated Corridor
3
Stairwells New stairwells, railings, and finishes
After Before Professional signage and way-finding plan
4
Guestrooms completely renovated to include modern kitchens bathrooms, upgraded HVAC, and finishes.
Before After
5
Newly Renovated Breakfast and Lobby
New automatic entry doors and passenger elevator provide easy access for guests to the 3-story facility.
6
Project Team FMWRC Project Manager – Patti Richardson
FMWRC Contracting Officer – Del Dreano FMWRC Interior Design – Mary Ann Miller Ft Stewart Lodging Manager – Connie Parks Contractor – Stellar Construction, Jacksonville, FL
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.