Presentation is loading. Please wait.

Presentation is loading. Please wait.

Renovation of Building 4950 Fort Stewart, GA

Similar presentations


Presentation on theme: "Renovation of Building 4950 Fort Stewart, GA"— Presentation transcript:

1 Renovation of Building 4950 Fort Stewart, GA

2 Corridors New HVAC system, drop ceiling, lighting, and textured walls.
Before: Exposed block walls, industrial lighting. No HVAC in corridors. Newly Renovated Corridor

3 Stairwells New stairwells, railings, and finishes
After Before Professional signage and way-finding plan

4 Guestrooms completely renovated to include modern kitchens bathrooms, upgraded HVAC, and finishes.
Before After

5 Newly Renovated Breakfast and Lobby
New automatic entry doors and passenger elevator provide easy access for guests to the 3-story facility.

6 Project Team FMWRC Project Manager – Patti Richardson
FMWRC Contracting Officer – Del Dreano FMWRC Interior Design – Mary Ann Miller Ft Stewart Lodging Manager – Connie Parks Contractor – Stellar Construction, Jacksonville, FL


Download ppt "Renovation of Building 4950 Fort Stewart, GA"

Similar presentations


Ads by Google