Download presentation
Presentation is loading. Please wait.
Published byCharlie Betton Modified over 10 years ago
1
1 FL EDI R3 Test Requirements Rule 69L-56.320, F.A.C.
2
2 FL R3 Test Requirements Rule 69L-56.320, F.A.C., addresses the requirements the Claim Administrator must meet to move from Test to Production status.
3
3 However, the Primary and Secondary Implementation Schedules addressed in the current rule are no longer applicable; Therefore, new Trading partners must test all MTC’s. Therefore, new Trading partners must test all MTC’s. FL R3 Test Requirements
4
4 During the testing period, all DWC Forms required by Rule 69L-3, F.A.C. must continue to be mailed to the Division. FL R3 Test Requirements
5
5 Claim Admin. must achieve acceptance (TA) for the minimum number of filings for each category of EDI filings specified in the FL Claims EDI R3 ‘Test Process’ document (on website) prior to being considered for production status. FL R3 Test Requirements
6
6 Claim Admin. will not be authorized to move to production status at different times for separate categories of required test EDI filings (e.g., EDI DWC-1’s, EDI DWC-13’s, etc.). All specified MTC’s/Filing Types must be approved before Claim Admin can ‘go live’ with R3. All specified MTC’s/Filing Types must be approved before Claim Admin can ‘go live’ with R3. FL R3 Test Requirements
7
7 In addition to testing the specified MTC’s/Filing Types, the Trading Partner must also respond to and resolve several different types of TA-FL Reconciliation Errors in the Data Warehouse before requesting authorization for production status. FL R3 Test Requirements
8
8 R3 test files should report the electronic equivalent of the DWC-1 (paper or R1), DWC-12, DWC-13 and DWC-4 being sent to the Division for actual claims. FL R3 Test Requirements
9
9 Note: When testing R3 filings for the Electronic First Report of Injury or Illness using actual claims, the trading partner should use cases that were received and processed by DWC after 3/31/2010. All claims/DWC-1’s (paper or R1) entered prior to 3/31/10 have been copied to our test database. FL R3 Test Requirements
10
10 Use real JCN’s from JCN list when sending standalone test SROI filings for actual claims where the DWC-1 (paper or R1) was established in DWC claims system on or before 3/31/10. Do not use Production JCN’s if the claim was established AFTER 3/31/10. FL R3 Test Requirements
11
11 Use the test JCN returned for the test 00/IP (or other EDI DWC-1 equivalent) when sending “standalone” test SROI filings (e.g., SA) See test filing categories c – f in Test Process document on web). See test filing categories c – f in Test Process document on web). FL R3 Test Requirements
12
12 If you are a new Claim Admin. and are unable to test with actual claims, “mock” electronic filings may instead be created and sent for testing purposes. FL R3 Test Requirements
13
13 Mock filings must still contain valid data and must not be identical to IAIABC or Florida Business Scenarios. FL R3 Test Requirements
14
14 If you send mock test data, you need to be confident of the quality of your live production data. There is only a 30 day grace period for FROI late filing penalties after going ‘live’, and There is only a 30 day grace period for FROI late filing penalties after going ‘live’, and Going back to “testing” status is not an option. Going back to “testing” status is not an option.
15
15 If you change Match Data (e.g., SSN, DOI) for an actual claim, you must not send the JCN provided for that claim on your JCN Listing. New FROI’s (e.g., 00/IP) will not have a JCN. New FROI’s (e.g., 00/IP) will not have a JCN.
16
16 Note: Only one JCN Listing will be produced after you file your Trading Partner paperwork. JCN Lists can be generated upon request. JCN Lists can be generated upon request. Send email to claims.edi@myfloridacfo.com for revised JCN List.Send email to claims.edi@myfloridacfo.com for revised JCN List. claims.edi@myfloridacfo.com
17
17 Seeking Production Approval When you think you have satisfied all testing requirements, send an email to claims.edi@myfloridacfo.com and request ‘production approval’. claims.edi@myfloridacfo.com Production approval process is described in the ‘Test Process’ document on the Claims EDI Webpage (and following slides.) Production approval process is described in the ‘Test Process’ document on the Claims EDI Webpage (and following slides.)
18
18 Seeking Production Approval To determine the status of your testing, from the Test Warehouse Main Menu, click on ‘Report Cards & Statistical Reports’; then select ‘Generate Claims EDI Report Card’ to yield counts and %’s for each category of EDI filings.
19
19 Seeking Production Approval If it appears testing requirements for all categories have been met, email claims.edi@myfloridacfo.com to request production approval. claims.edi@myfloridacfo.com
20
20 Seeking Production Approval Note: Filings that are assigned ‘TA-FL’ will count as accepted transactions, but will appear in a separate column in the Report Card. They should be added to the ‘TA’ counts when determining if testing requirements have been achieved. They should be added to the ‘TA’ counts when determining if testing requirements have been achieved.
21
21 Seeking Production Approval Although the “FL Claims EDI R3 Test Process” document indicates each category must be evaluated on the basis of one transmission / Division Rec’d Date, you may also request credit for filings submitted over time via multiple transmissions/ Div Received Dates. …
22
22 Questions?
23
23 After you get back to the office, ALL Questions, either Business or Technical, should be sent via email to claims.edi@myfloridacfo.com claims.edi@myfloridacfo.com This email address is copied to all members of the EDI team. It is the quickest and most efficient way for us to respond to your concerns.
24
24 Please complete your Training Feedback forms.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.