Download presentation
Presentation is loading. Please wait.
Published byAmarion Slawter Modified over 10 years ago
1
N ORTHEAST W ISCONSIN S TORMWATER C ONSORTIUM (NEWSC) J ESSICA S CHULTZ - D IRECTOR A PPLYING E NVIRONMENTAL S CIENCE & P OLICY IN THE N ONPROFIT S ECTOR
2
S TORMWATER D ISCHARGE P ERMIT
3
R EGULATORY R EQUIREMENTS B ACKGROUND The Federal Clean Water Act of 1972
4
R EGULATORY R EQUIREMENTS B ACKGROUND Stormwater Discharge Permit Program Rules published in 1988 Phase I – Industrial Stormwater Discharge Permits Phase II – Construction Activities disturbing 5 acres or more Phase III – Municipal Stormwater Discharge Permits in 2 phases 1.Phase I (cities over 100,000) – 1990’s 2.Phase II (cities 10,000 – 99,999) - 2005
5
W HAT IS AN MS4? MS4 - Municipal Separate Storm Sewer System Any system of open or closed pipes or ditches that carry runoff from rainwater or snowmelt (not sanitary sewer discharge) Owned & operated by a government entity (Town, City, Village, State, County, etc.)
6
R EGULATORY R EQUIREMENTS B ACKGROUND To meet the requirements of the Federal Clean Water Act MS4s are permitted in Wisconsin through NR 151 & 216
7
N ORTHEAST W ISCONSIN S TORMWATER C ONSORTIUM in 2004 in response to the coming Phase II Stormwater Permit as a subsidiary of the Fox-Wolf Watershed Alliance which holds the 501c3 NEWSC was created
8
N ORTHEAST W ISCONSIN S TORMWATER C ONSORTIUM Fostering Partnerships Sharing Information Administrative Efficiency Pooling Financial Resources
9
Menomonee River Group Southeast Wisconsin Clean Water Network La Crosse Urban Stormwater Group Madison Area Municipal Storm Water Partnership North Central Wisconsin Stormwater Coalition Waukesha County Storm Water Information and Education Partnership Chippewa Valley Stormwater Forum North East Wisconsin Stormwater Consortium R EGIONAL C OLLABORATION
10
B ENEFITS OF R EGIONAL C OLLABORATION
11
Updates on Rules & Regulations B ENEFITS OF R EGIONAL C OLLABORATION
12
Standardized sample ordinance language
13
B ENEFITS OF R EGIONAL C OLLABORATION Simplified guidance and procedures / processes
14
A Larger Voice B ENEFITS OF R EGIONAL C OLLABORATION
15
Use of developed brand & materials for stormwater education.
16
B ENEFITS OF R EGIONAL C OLLABORATION Shared broadcast media – radio & television, billboards
17
B ENEFITS OF R EGIONAL C OLLABORATION Exhibiting and Education
18
B ENEFITS OF R EGIONAL C OLLABORATION Training Employees Business/Industry
19
Opportunity to network with neighboring communities B ENEFITS OF R EGIONAL C OLLABORATION
20
T OTAL M AXIMUM D AILY L OADS
21
W HAT ’ S A TMDL? A TMDL is the maximum amount of a particular pollutant that a water body can receive while still meeting water quality standards. TMDL – Total Maximum Daily Load
22
W HY DO WE NEED A TMDL? The Federal Clean Water Act requires all “impaired waters” to have TMDLs. Impaired waters are waters that are not meeting expectations for fish and aquatic life, recreation, public health and welfare and wildlife. Currently there are more than 700 rivers, streams and lakes on Wisconsin’s list of impaired waters. Algae growth in lake resulting from too much phosphorous
23
I NFORMATION U SED TO D EVELOP THE L OWER F OX R IVER TMDL Land Use
24
I NFORMATION U SED TO D EVELOP THE L OWER F OX R IVER TMDL Sources of Total PhosphorousSources of Total Suspended Solids
25
W HAT HAPPENS AFTER A TMDL IS SET ? 1.WDNR determines how to achieve the reduction needed. 2.Allowable amounts of pollution are allocated to permitted industries, municipalities and wastewater treatment plants. 3.Updates to individual permits are made to account for the reduction needed to meet the TMDL. A TMDL determines the allowable amounts of a particular pollutant in a certain water body. If the amount of that pollutant entering a water body exceeds the TMDL then …
26
H OW M IGHT A TMDL AFFECT Y OUR MUNICIPALITY? Municipal Wastewater Treatment Facility Municipal Stormwater System For many communities affected by a TMDL, large reductions must be met by both the Municipal Wastewater Treatment Facility and the Municipal Stormwater System – this increased reduction has the potential to come at a high cost for both facets. Fox River in Kimberly, June 2007. Photo credit Bruce Cleland, Tetra Tech
27
H OW CAN Y OUR M UNICIPALITY MEET TMDL R EQUIREMENTS ? Example: Currently, XX,XXX tons per year of Phosphorous (TP) are loaded into the Example River. Best Management Practices WDNR determined that the TMDL allocates XX,XXX tons per year of TP. A XX% reduction.
28
H OW CAN Y OUR M UNICIPALITY MEET TMDL R EQUIREMENTS ? Example: Currently, XX,XXX tons per year of Phosphorous (TP) are loaded into the Example River. New options to meet permit requirements: Water Quality Trading Adaptive Management WDNR determined that the TMDL allocates XX,XXX tons per year of TP. A XX% reduction. Fox River at the Bay of Green Bay, April 2011. Photo credit Steve Seilo, Photodynamix
29
M EETING PERMIT OPTIONS OPTIONBMPsWater Quality TradingAdaptive Management AVAILABILITYAvailable to all permit holders Available to NR 217 permit holders (wastewater) NR 216 permit holders (stormwater) are able to partner if available Ponds, Sweeping, Rain Gardens, Bio- filters, plant upgrades Using trading ratios, set by DNR, purchase credits for lbs. removed by BMP of another stakeholder – could be a WWTF, Agriculture or another community. Create and implement a plan to meet the impaired waterbody’ s water quality criteria. This may mean a combination of bricks & mortar projects and partnering with agriculture to install BMPs. GOALEnd goal to reach permit requirements End goal to reach to permit requirements End goal to reach water quality criteria Potentially highest cost / least risk Potentially lower cost / less risk than AM Potentially lowest cost / highest risk Regional collaboration for highest success rate
30
F OX -W OLF W ATERSHED A LLIANCE FWWA is an independent, non-profit organization that identifies issues and advocates effective policies and actions to protect, restore and sustain the water resources of Wisconsin’s Fox-Wolf River Basin.
31
Contract with 5 WWTFs Green Bay Heart of the Valley Appleton Grand Chute/Menasha West Neenah/Menasha Adaptive Management Economic Feasibility Study Contract with McMAHON Associates
32
S TAKEHOLDER C OMMUNICATION E FFORTS
33
Photo Credit: Capital Times
34
S TAKEHOLDER C OMMUNICATION E FFORTS
36
Fox River at the Bay of Green Bay, April 2011. Photo credit Steve Seilo, Photodynamix
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.