Using High Speed Rail to Achieve Connectivity and Integration Prof Andrew McNaughton
2
Government gave go ahead 10 Jan Secretary of State announced: Y network: London to West Midlands with extensions to Manchester and Leeds and spur to Heathrow London to West Midlands Alignment Development for Hybrid Bill submission
3
Hybrid bill for London – West Midlands The act will give powers to: Build and operate HS2 Acquire and lease land Alter roads Modify statutory undertakers equipment Deposit hybrid bill by end of 2013 Royal assent 2015 Construction from 2017 Open 2026
4
Leeds Manchester and Heathrow Options report went to Secretary of State March 2012 Government decision on proposed route and station options imminent Formal consultation 2013/2014
5
Population Growth England 200852m 203360m 205070m
6
Guidelines Principles – Original Remit Maximise benefit for the investment Capacity expansion for long distance passenger growth Release existing lines for commuter / freight growth Connectivity between major cities Through running beyond new line Contribute to mode shift from road and air Compatibility with HS1 / European HS network Whole journey integration with connecting transport modes A new passenger transport backbone, not a replica of the existing railway – Lord Adonis
7
Initial network London to West Midlands1-24 to 0-49 Manchester2-08 to 1-13 Leeds2-15 to 1-20 Scotland4-20 to 3-30 Birmingham to Manchester1-34 to 0-40 Leeds2-05 to 1-00 Heathrow to Manchester1-10 Paris2-40 London Manchester Birmingham Scotland Leeds Heathrow Newcastle
8
Demand – led Frequency London – West Midlands Core Basic 15 trains per hour + International trains Heathrow trains Trains Length Initially 200m with 400 m in peak Scotland dividing for Edinburgh and Glasgow Liverpool / Newcastle directly served 2 2 2 3 Scotland Manchester Liverpool Birmingham Leeds Newcastle 3 3
9
High Capacity HS Captive Fleet Units of 200m (up to 550 seats) Maximum of 400m / 1100 seats (2 units in multiple)
10
Classic Compatible Fleet Aka Eurostar 2 Same performance on HS2 Ability to run on Network Rail infrastructure Reduced body cross-section
11
1 st Stage London to West Midlands1-24 to 0-49 Manchester2-08 to 1-40 Glasgow4-20 to 4-00 Birmingham to Paris4-30 to 3-00 London Manchester Birmingham Glasgow
12
High Speed Rail is 48 years old
13
This was St Pancras…
14
In operation Under construction In project Japan
15
The French Experience
16
Thalys (Paris-Brussels)
17
Modal Change Before ThalysAfter Thalys Paris - Brussels (2hr 25min to 1h25min)
18
km Planned World HSR Development
19
Where To Serve – City or Fringe?
20
HS stations are large! 1070m
21
City Structure and Functions Urban Centre Suburbs Where people work and play Where people live and start and finish their day
22
Metropolis (>~ 5m People)
23
London - 2 central stations Euston Old Oak Common
25
Large City (~ 3m People)
26
New Central Birmingham Station
27
West Midlands Interchange Station People mover to National Exhibition Centre and the Airport Parkway feeder for the metropolitan area Highway connections to trunk network
28
Smaller City (~1m People) e.g. Kassel
29
Passenger Experience Individual journeys Door to door Whole systems starts with information / planning / ticketing Assumption set Safety / security Time Reliability Ease Convenience Accessibility etc
30
Whole Journey Time Reduction Perceived Value To User Origin Transit Changing/ Waiting Train Destination Transit
31
This will transform relationships between our principal cities