Download presentation
Presentation is loading. Please wait.
Published byKyree Thurber Modified over 10 years ago
1
Click to edit Master subtitle style 3/9/09 Program Committee Meeting Kaohsiung, 5 March 2009
2
3/9/09 Agenda Roll Call Review of 27th APAN Meeting 28th APAN Meeting – Status Update 29th APAN Meeting – Australia Election AOB
3
3/9/09 Review of 27th APAN Program took sometime to set up Drop in number of WG meetings Program Committee VC and phone bridge Registration open a bit late Wireless and wired (in room) network Power cords
4
3/9/09 Improvements Inform CC of progress regularly Every WG own one 90-min session especially in KL Plenaries are the responsibility of the PC One person from TERENA in PC Improve technical/infrastructure content Balance between APAN and collaboration sessions/less conflicting with APAN sessions
5
3/9/09 28th APAN meeting - KL VC for PC meeting – AARnet will be hosting the VC Reduce the number of days from 4 to 3 Location of event – Number of parallel rooms Network connectivity (R&E network) Theme “Global Outreach through Future Internet” Plenary speakers Possible WG meetings
6
3/9/09 28th APAN meeting - KL Suggested Timeline – Website 15 March – Registration/hotel 1 April – Draft program 15 April – Plenary speakers 30 April – Meeting: 20-23 July
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.