Download presentation
Presentation is loading. Please wait.
Published byKristen Westwood Modified over 10 years ago
1
Collaborative Projects on the KR-JP APII Testbed 26 February, 2003 Kwon, Young-il (kyi@nca.or.kr) National Computerization Agency
2
2 Contents KR-JP APII Testbed Collaborative Projects Plan of Joint Projects
3
3 APII Testbed : Asia Pacific Information Infrastructure Testbed Background - First proposed at the 12th APEC TEL WG(1995) jointly by Korea and Japan Objectives - To test interconnectivity and interoperability among the test-beds in Asia-Pacific Region - To support joint R&D Projects and collaborative Projects APII Testbed
4
4 KR-JP APII Testbed Started with 2Mbps bandwidth in April 1998 -APCN2 Submarine Cable between Seoul and Tokyo -ATM Half Circuit Expanded to 8Mbps in July 1999 -SCR 8Mbps / PCR 32Mbps Will be expanded up to 1Giga-bps -Official Launching Date : April 1 st, 2003 -Using KJCN
5
5 KR-JP APII Testbed ○ Seoul XP Daejon Daegu Gwangju KIX Fukuoka Kitakushu 1G Tokyo XP TransPAC StarTAP 40G 155M 655M * 2 Suwon Seoul KREONet2 KJCN Cable Busan 8M APCN-2 Cable
6
6 Collaborative Projects(1) KR-JP native IPv6 IX connectivity KR-JP APII Testbed KOREN JGN NSPIXP-6 (Japan) NCA Showroom NTT Otemachi Showroom Seoul PoP Busan PoP Kyushu PoP 6KANET Korean Side Japanese Side 6NGIX (Korea) IPv6ISP IPv6ISP IPv6ISP IPv6ISP
7
7 Collaborative Projects(3) Exchange Programs of IPv6 Showroom Remote Control Service : (e.g.) : Remote controlling of IPv6-enabled web camera at Japanese showroom from Korea Exchange of demo tape IPv6 applications & IPv6-enabled info- appliance (e.g. : Internet Refrigerator) Exhibition of IPv6 applications at IPv6 events such as IPv6 workshop, IPv6 summit held at each side
8
8 Collaborative Projects(3) IT Week -Advanced IT Show such as 3D, Hi-Video e-School -600 Busan middle and high schools, -Real time exchange on classroom lecture e-Medicine -Remote Surgery, real time translation tool Global IX -IX to IX Connectivity, Measurement and Monitoring System GRID -Access Grid……. Other -HEP, Music Performance…..
9
9 Plan of Joint Projects NCA will make joint projects in Asia-Pacific region Process (Plan*) -20 Mar 2003 Call for Collaboration -29 Mar 2003 Networking Session -02 Apr 2003 Last date for inquires -19 Apr 2003 Final Proposal Submission -30 Apr 2003 Presentation by Short-Listed Participants * Tentative dates Recommendation -Matching Fund by Consortium -Consortium with industrial players
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.