Download presentation
Presentation is loading. Please wait.
Published byKenyon Cammer Modified over 10 years ago
2
200 E 400 N to 1250 N Reconstruction
3
200 E 400 N to 1250 N Phases
4
200 E 300 S to Center St. Reconstruction
5
1200 S Highway 89-91 Intersection Realignment
6
800 W 600 N to 750 N (EDA) New Construction
7
400 N; 600 W to 1000 W RR Acquisition
8
800 N 800 W to 1000 W Asphalt Reconstruction
10
600 E 1000 N Intersection Realignment/Signalization
11
Service Center Curb, Landscape Strip & Sidewalk
13
Flood Control for Logan and Blacksmith Fork Rivers Flood Mitigation Logan Blacksmith Spring Cr.
14
800 N Regional Stormwater Basin
15
1000 West Storm Drain Betterments Phase 2
16
Stormwater Monitoring Stations
17
City Detention Basin Improvements
18
NRCS Canal Project
20
350 S, 1000 W – 1350 W
21
1000 W Phase 2 Water/Sewer
22
PRV Mitigation Projects
23
Smithfield Lift Station
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.