Presentation is loading. Please wait.

Presentation is loading. Please wait.

Guthrie, T., Kioko, U., Chitama, D., Asante, F., Chitsomia, A., Madadume, B. Inaugural Conference of the African Health Economics and Policy Association.

Similar presentations


Presentation on theme: "Guthrie, T., Kioko, U., Chitama, D., Asante, F., Chitsomia, A., Madadume, B. Inaugural Conference of the African Health Economics and Policy Association."— Presentation transcript:

1 Guthrie, T., Kioko, U., Chitama, D., Asante, F., Chitsomia, A., Madadume, B. Inaugural Conference of the African Health Economics and Policy Association Accra - Ghana, 10th - 12th March 2009 PL 05/1

2 Objectives  To compare levels of spending, both domestic and international, for HIV/AIDS in 4 SADC countries: Botswana, Swaziland, Zambia, Lesotho -> Ghana (non-SADC comparison)  To consider the adequacy and alignment of the funds for the attainment of their National Strategic Plans (NSPs).  To measure the absorption of these funds according to the different funding mechanisms.  To compare unit costs for key interventions (where output data was available )

3 Methodology  Comparison of NASA Reports from the 4 countries  National AIDS Spending Assessment is an approach to comprehensively measure: All spending for HIV/AIDS From all sources, through agents, providers, activities to beneficiaries From a multi-sectoral perspective According to interventions reflected in the NSPs Allows countries to monitor their own progress towards the national and international commitments.  Acknowledgements to the NACs and NASA team members for their data

4 Levels and Sources of Financing  Increasing amounts of spending on HIV/AIDS  Increasing public allocations, as well as international  Average contributions (in 4 countries):  International 58.8%. Public 41.2%.  Removing Botswana:  International 71.6%. Public 28.4%.

5 Levels & Sources of Funding for HIV/AIDS (US$mill, 2006)

6 Per Capita HIV/AIDS Spending & HIV Prevalence (US$, %, 2006)

7 Increasing Public Allocations: Botswana ~ Total Spending on HIV/AIDS (PulaMill, 2003-2005)

8 Swaziland ~ Sources of HIV/AIDS Financing (SZLmill, 2005/06-2006/07)

9 Zambia ~ Sources of HIV/AIDS Financing (US$, 2005&2006)

10 Ghana – Sources of HIV/AIDS Financing (US$mill, 2005-2006)

11 Lesotho (prelim) ~ Financing Sources for HIV/AIDS (M, 2005/06 & 2006/07)

12

13 Swaziland ~ Comparison of Costed NSP with NASA Spending (SZL, 2006/07)

14 Zambia ~ NSP Costed Priorities vs Actual Spending (%, 2006)

15 Botswana ~ NSP Priorities Compared to Actual Spending (%, 2005/06)

16 Ghana ~ Costed APOW vs Actual Spending (US$, 2006)

17 Lesotho ~ Spending Compared to Costed NSP Priorities (%, 2006/07)

18 Botswana ~ Spending on HIV/AIDS by Source (%, 2005)

19 Swaziland ~ Effects of Reducing External Aid (SZL, 2005/06-2006/07)

20 Swaziland ~ Reducing Treatment (Nutrition Supplements) Spending (SZL, 2005/06-2007/08) - 10,000,000 20,000,000 30,000,000 40,000,000 50,000,000 60,000,000 70,000,000 80,000,000 90,000,000 2005/ 20062006/ 2007 YEAR SZL Care and treatment services not elsewhere classified (n.e.c.) Opportunistic infections’ (OI) treatment Home-based care Palliative care Psychological treatment and support services Specific HIV-related laboratory monitoring Nutritional support associated to ARV therapy Antiretroviral therapy not-desegregated by age or line of treatment Adult antiretroviral therapy not- desegregated by line of treatment Pediatric antiretroviral therapy not- desegregated by line of treatment Opportunistic infection (OI) prophylaxis

21

22 Dimensions of Absorptive Capacity  Program Management  Procurement and Supply Chain  Financial management  Governance & oversight  Performance and measurement  This focus is on the financial aspects

23 Financial Absorptive Capacity  Ability of implementing agencies to utilise funds in the planned time period and for the purposes intended  Rate and manner by which funds received are turned into physical resources of materials, equipment, infrastructure, and personnel  Encompasses financial flow:  from commitment  through transfer or disbursement  to procurement or expenditure

24 Zambia – absorption rates improving (US$, 2005 & 2006)

25 Factors Limiting Absorptive Capacity  Limited human resources & skills at all stages of project conceptualisation, implementation & monitoring  High rate of turn-over and deaths of staff  Preferential use of funding (according to source)  Governmental ceilings for development / social sector spending – frozen posts  Delayed disbursements (some funding mechanisms worse than others)  Complexity of reporting and accounting requirements and other conditionalities – absorb staff time  Govt procurement systems very slow  Short project cycles and disbursement cycles

26 Summary of Findings  Evidence of improving public contribution to total spending on HIV/AIDS  Some decreases in external sources (Swaziland & Lesotho)  Treatment (specifically ART) requiring increasing amounts  Prevention not receiving notably increased allocations  Other interventions (mitigation, enabling environment, research) receiving relatively little

27 Findings cont. Comparing the costed NSP priorities with the actual spending:  NSPs generally poorly costed and may not have been accepted in country  NASA captured more than was included in the NSP costing  Improving costings and use of NASA will better provide estimates of funding gaps by intervention  There are improvements ito donor alignment with national priorities (according to the Paris Declaration)  Eg. Increasing allocations through common funds for HIV/AIDS, managed by the NACs  However, there are some notable exceptions  Parallel systems of financial management remain

28 Findings cont.  Comparison of unit costs of key interventions within the SADC region has been difficult due to poor or non-comparable out-put indicators.  The funding mechanism appears to influence the degree of absorption of funds, among many other factors  Often poor absorption due to delays in disbursement systems, and ‘dumping’ by donors  Measuring the absorption of funds proved difficult because the NASA approach initially did not collect the allocations/ commitments / disbursements – only the actual spending so the rate could not be calculated.  Only in Zambia....

29 NASA Provides Data for Evidence-based Allocative Decisions  Adequacy of funding – public & external  Allocative decisions – priorities  Efficiency of spending & absorption rates/ challenges  Coordination, Harmonisation and Alignment  Enhanced Transparency, Accountability & Economic Governance  Standardization & Comparability  Need for institutionalization of resource tracking in routine M&E systems:

30 Routine Resource Tracking would…. Increase pressure (& desire) for mutual accountability by all players Promote a framework to ensure all partners report through a national resource tracking system Link framework to the National Resource Mobilisation and Management Strategy Contribute to harmonised standards of reporting and costing among different partners Ensure transparent procurement systems & best pricing within and between countries & regions

31 Thank You Teresa Guthrie Centre for Economic Governance and AIDS in Africa Email: teresa@cegaa.org Tel: +27-21-425-2852 Cell: +27-82-872-4694


Download ppt "Guthrie, T., Kioko, U., Chitama, D., Asante, F., Chitsomia, A., Madadume, B. Inaugural Conference of the African Health Economics and Policy Association."

Similar presentations


Ads by Google