ALASKA TIDAL ENERGY CONFERENCE January 23 – 24, 2007 Ketchikan Alaska Ted Ferry Civic Center Board Room
2
6 STUDY AREA
3
Proposed Northwest Transmission Line
4
BRITISH COLUMBIA Proposed Northwest Transmission Line (NTL)
5
AK-BC INTERTIE Proposed 26.5-mile transmission line: Tyee Lake Hydroelectric Project to British Columbia border Purpose: Interconnect with BCTC’s proposed Northwest Transmission Line to provide access to export markets in BC & Lower 48 for sale of Alaskan-generated electric power
6
STATUS OF AK-BC INTERTIE FEASIBILITY STUDY December 2006 Draft Report – AEA Website Preparing Draft Final Report – due March 30, 2007
7
HYDRO, TIDAL AND GEOTHERMAL PROJECTS: Factors Influencing Development New transmission segments in SE Alaska & BC Load Growth in SE Alaska Opportunities to displace current high- cost diesel Opportunities to bid Alaskan-generated power into calls for power in BC & Lower 48
8
TIDAL POWER: INFORMATION NEEDS Location map including proposed interconnection Project layout and description Generation technology Installed capacity and annual generation Schedule and cost of power Environmental assessment Risk assessment
9
REALITIES OF THE MARKET IN BC AND LOWER 48 Entry to the Market is the AK-BC Intertie + Interconnection with BCTC Transmission Market opportunities include: –Sale to BC Hydro –Sale to PowerEx, marketing arm of BC Hydro for resale to Lower 48 –Sale to mining interests in NW BC to firm up run- of-river projects –Sale to utilities in Pacific Northwest & California
10
FUTURE GENERATION