Download presentation
Presentation is loading. Please wait.
Published byJustice Letcher Modified over 10 years ago
1
Yate health centre and locality hub development
22 September 2009
2
Looking at the rear of the building
3
Walking through from Sure Start to main reception – Ground floor
4
Main reception – Ground floor (entering from rear entrance)
5
Main reception area – Ground floor
6
Main reception area – Ground floor
7
Storage and filing area – 2nd floor Integrated Office
8
2nd floor Integrated Office
9
2nd floor – Integrated Office and individual meeting rooms
10
2nd floor Integrated Office – large meeting room 8690
11
2nd floor – Integrated Office
12
Outside S15 – Out Patients Notes Room (2nd floor)
13
Shower cubicle – 1st floor
14
G31 – Activity room
15
Plant room – 2nd floor
16
Plant room – 2nd floor
17
Server room – 2nd floor
18
West Walk Surgery – G.P. Office
19
Fire Escape Staircase – overlooking Library
20
View into corridor
21
Minor procedures room F19
22
Minor procedures room F19
23
1st floor waiting area
24
A G.P. consultation room – 1st floor
25
1st floor reception for out patients
26
1st floor reception – out patients
27
1st floor reception for out patients
28
F08 bookable room with audio booth
29
West Walk Surgery – waiting area
30
West Walk Surgery – Treatment room 1st floor 8710
31
Fire escape staircase
32
Corridor on 1st floor
33
Integrated office – 1st floor
34
Integrated office – 1st floor
35
Integrated office – 1st floor
36
G40 – assessment office – Sure Start Children’s Centre
37
G48 – Activity room (left) for Sure Start Children’s Centre
38
Looking back to the Sure Start entry/exit end of corridor
39
Looking back towards Sure Start entry/exit end of corridor at building rear
40
G34 – Physiotherapy room
41
G11 – Main waiting area near reception
42
Ground floor main reception (main entrance far left, waiting room immediate left)
43
Main reception desks
44
Main reception desks
45
Looking at rear of building
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.