Download presentation
Presentation is loading. Please wait.
Published byAryan Eady Modified over 10 years ago
1
Treadway Creek Greenway & Trail, Old Brooklyn, Cleveland, Ohio Treadway Creek Greenway & Trail: Dedication Ceremony: May 16, 2008 Location: Plymouth Road and South Hills Boulevard, Old Brooklyn, Cleveland Ohio Acreage: 21.12 acres (including Harmody Park) Project Description: The Department of Parks restored and preserved 21 acres of prime riparian corridor, wooded ravine and open space through land acquisition and placement of a conservation easement. In addition a 2/3-mile asphalt paved, all- purpose trail linking Harmody Park with the Ohio & Erie Canal Towpath Trail was constructed
2
Treadway Creek Greenway & Trail, Old Brooklyn, Cleveland, Ohio Treadway Creek Greenway & Trail: 1.Preservation of Open Space 2.Acquisition of Property & Placement of Conservation Easements 3.Field Survey, Environmental Assessment, Preferred Trail Alignment and Profile Design 4.Restoration & Enhancement of Natural Ecosytems 5.Provide Access and Linkage to Open Spaces, Natural Resources & Educational Opportunities 6.Construction of a multipurpose trail, required structures, signage and educational/interpretive wayside exhibits 7.Management of the Natural Areas, Open Spaces, Trail & Adjoining Park and Parking Lot 8.Community Outreach and Involvement
3
Treadway Creek Greenway & Trail, Old Brooklyn, Cleveland, Ohio Treadway Creek Greenway & Trail: $1.85 million project Fund Sources: $745,316 Clean Ohio Conservation Fund grant $498,000 G.O. Bond Proceeds $40,000 CMHA land donation value $10,000 Ohio & Erie Canal Association grant to OBCDC $273,850 value of in-kind service and property $285,000 Ward 15 G.O.Allocation ($5k Ward 16)
4
Treadway Creek Greenway & Trail, Old Brooklyn, Cleveland, Ohio
13
Treadway Creek Greenway & Trail
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.