Download presentation
Presentation is loading. Please wait.
Published byLaney Brewington Modified over 10 years ago
1
Jacobs Vane and top of Gin-Pole Hap welded and rebuilt the pivots on the vane. Hap designed and fabricated the cross arms for the gin-pole.
2
The first step was to gather all the parts.
3
Then assemble the parts into something that works.
4
In position!
5
Grey
6
Time to test the system It Works! CLICK ON ABOVE BLOCK FOR VIDEO.
7
Next we will raise the Gin-Pole to the top of the tower. Finally, we will lower the Jacobs Turbine to the ground. Grey Chisholm 21 January 2010 50 Sendero de Toho, Santa Fe County, New Mexico
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.