Presentation is loading. Please wait.

Presentation is loading. Please wait.

Since 1975 Since 1975. Step 1 Foundation Foundation.

Similar presentations


Presentation on theme: "Since 1975 Since 1975. Step 1 Foundation Foundation."— Presentation transcript:

1 Since 1975 Since 1975

2

3

4

5 Step 1 Foundation Foundation

6 4 X 8 Foot Panels

7 Chalking Base Channel

8 Installing Redheads

9 Engineering, Designing, Shipping!

10

11 Bolting The Roof

12

13

14

15

16

17

18

19

20

21

22

23

24 Nothing Faster Or Easier! Elite Prefab Addition Kits for developers, do it yourselfers & contractors. You can build an addition out of a material as resistant as block, as versatile as wood and faster, easier plus, allot more economical to build.

25 We will be glad to address your questions, answered on the phone or in person. http://www.ElitePrefabHomes.com Joel Leitson President Elite Prefab Homes Inc. 17051 Northeast 23rd Ave. Suite 1 F Miami, Florida. 33160 Joel@ElitePrefabHomes.com Office = 305 897 2899 Cell = 786 704 2878


Download ppt "Since 1975 Since 1975. Step 1 Foundation Foundation."

Similar presentations


Ads by Google