HEALTHCARE BUILDING AUTOMATION
Guiding Principals, Applications and Operation Presented by Peter Sabeff
2
SIMILAR, BUT MORE Commercial Buildings Temperature control
Building pressure control Occupied/Unoccupied control Warm up/cool down
3
SIMILAR, BUT MORE Healthcare The above (Commercial Buildings), plus
Space & pressure relationships Humidity control Less influence Warm up/cool down
4
HEALTHCARE CHALLENGES
Humidity Control – Humidification & Dehumidification Air Quality Space & Building Pressurization Optimization – AHU and Plant Equipment
5
HEALTHCARE MONITORING AND CONTROL ISSUES
Understand the systems – terminal units, AHU, plant Equipment over/under sizing Interactions between temperature, pressure, flow and humidity control Variable everything – good and bad
6
HEALTHCARE MONITORING AND CONTROL ISSUES
Unwanted gains and losses Humidifier heat (jacketed humidifiers) Reheat coil heat migration Overlapping sensing and control of components in series Fan heat Outside air heat – roofs, hot exhaust air, condensing units Control component failures Lack of outside/return air mixing Preheat coil overshoot
7
HEALTHCARE MONITORING AND CONTROL ISSUES
Building pressurization Significant exhaust air – constant and variable Many entrances/exits – high pedestrian traffic Outside air control/conditioning issues – freezing, high humidity Control strategies?
8
HEALTHCARE MONITORING AND CONTROL ISSUES
Room Control Central cooling source - 55F +/- discharge air Individual heating control Thermostat location Occupied/Unoccupied – how do we know? Occupant thermostat manipulation Zoning
9
HEALTHCARE MONITORING AND CONTROL ISSUES
Redundancy Automatic backup with failures Equipment interactions with pump failures
10
INSTRUMENTATION – THE STEPS
DDC monitoring and control Validation of I/O accuracy Validation of sequences of operation Validation of programming – normal, off normal, failure System interactions Integrated system interactions Tighten the belt Repeat steps 1 through 7 until satisfied and energy use confirms success
11
MONITORING Temperature and Humidity Pressures HW/CHW differential
Room temps Terminal unit functions AHU functions Plant functions Pressures AHU – internal/external HW/CHW differential Rooms/positive - negative Building – positive/negative/wind
12
MONITORING Flows Minimum/Maximum – OSA , Chillers, VAV Tracking Global
Outside air temperature and humidity Operating schedules Building electric demand (main meter) System electric demand (aggregate equipment)
18
HUMIDIFICATION Cold weather: 0.002 # moist air / # dry air (or less)
45F at 20% RH Return air: /- 72F at 30% RH F at 20% RH Economizer free cooling – cold/dry air adds humidification load Humidifier sizing – Min or max OSA?
19
OR HUMIDITY VIA COOLING/CONDENSING
Room Temperature Humidity (Maximum) Discharge Air Temperature Must Be Chilled Water Temperature Must Be 72F 60% 57F 47F 70F 55F 45F 68F 54F 44F 66F 52F 42F 64F 49F 40F 62F 38F
20
GRAPHICS Floor plans Terminal units Air handling units
Basic Floor plans Terminal units Air handling units Heat exchangers/pumping Chilled water Condenser water
21
GRAPHICS Enhanced AHU discharge temp, CHW valve pos, CHW S & R temps, power System Power Consumption – pumps + fans + compressors + etc.
22
DATA MINING Adds intelligence to BAS trending 3rd party overlay
General or operator directed Large capacity/long duration Experience based mining / correlation of data Must have the I/O
23
DATA MINING Sequencing of components that function in series
Hi and Lo limits Occupied/Unoccupied Starting is easy – when do we stop? Riding it out Make one change at a time.
24
ST. ANTHONY HOSPITAL, LAKEWOOD, CO
25
HEALTHCARE BUILDING AUTOMATION
Guiding Principals, Applications and Operation Presented by Peter Sabeff
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.