PERFORMER KO MEETING NICE - 12 th & 13 th September 2013 WP1short presentation
2
WP 1 content PERFORMER concept WP1 aims at providing the set of required scientific methodologies to support the global framework for energy performance assessment
3
WP 1 content OBJECTIVES : providing a global framework as well as a set of methodologies for in situ energy performance characterization, measurement and assessment Task 1.1 : Define a comprehensive and coherent framework for the global quality process of performance assessment Definition of a quality process ensuring the monitoring of building energy consumptions and the achievement of targeted performances (based on commissioning) Definition of appropriate indicators, characterization of the buildings properties, characterization of « in use » conditions Task 1.2 : Develop methodologies as well simulation models and tools to assess the in situ intrinsic performance of the buildings envelops Development of a methodology to assess intrinsic performance of the envelope at the end of the construction during a short period Development of a methodology to assess intrinsic performance of the envelope using long term monitoring during operation phase Task 1.3 : Develop methodologies to propose a cost optimized measurement assessment plan Specification for a tool aiming at providing cost-optimized energy performance measurement plan enable to support PERFORMER solutions Task 1.4 : methodologies for energy management, fault detection and diagnosis Specifications for a set of relevant tools to manage energy consumption and ensure continuity of the performances during the operation phase Fault detection and diagnosis, performance monitoring, real time management and optimized control, visualization and reporting tools
4
4 WP 1 content Objectives : providing a global framework as well as a set of methodologies for in situ energy performance characterization, measurement and assessment WP 1: Specify & Define PERFORMER Framework & Methodologies Duration: 1-15 monthsLead: CSTB Task / DeliverableLeadContributors Deliver by 1.1 - Define a PERFORMER quality process that guarantees; Monitoring of all energy consumption in any building Achievement of building energy performance targets CSTBECG, UPL, GDF BRE, ASM, DRA CU & CEA Month 12 1.2 - Specify tools for the measurement of the intrinsic energy performance of building envelopes. - Subtask 1.2.1 : Quick assessment at the end of the construction phase Subtask leader : CSTB - Subtask 1.2.2 : Long term assessment during the operation phase Subtask leader : SG CSTBSG, BRE, GDF, UPL, ECG & DRA 15 1. 3 - Define a robust method to identify a cost optimized performance measurement plan & produce specifications for tools to be developed on WP2 that will be applied to pilot buildings. ECGCSTB, CEA, GDF, BRE & UPL 15 1.4 - Specify methodologies for energy consumption management and ensuring continuity of the performance during the operation phase - Subtask 1.4.1 : Fault detection and diagnosis functionalities based on expert rules Subtask leader : GDF - Subtask 1.4.2 : Performance monitoring exploiting machine learning techniques Subtask leader : CEA - Subtask 1.4.3 : Real time energy management and optimized control Subtask leader : CU - Subtask 1.4.4 : Visualization and reporting tools Subtask leader : CSTB CSTBBRE, CEA, CU, GDF & ECG 15
5
5 WP 1 content Objectives : providing a global framework as well as a set of methodologies for in situ energy performance characterization, measurement and assessment WP 1: Specify & Define PERFORMER Framework & Methodologies Duration: 1-15 monthsLead: CSTB Task / DeliverableLeadContributors Deliver by 1.1 - Define a PERFORMER quality process that guarantees; Monitoring of all energy consumption in any building Achievement of building energy performance targets CSTBECG, UPL, GDF BRE, ASM, DRA CU & CEA Month 12 1.2 - Specify tools for the measurement of the intrinsic energy performance of building envelopes.CSTB 15 - Subtask 1.2.1 : Quick assessment at the end of the construction phase Subtask leader : CSTB CSTBSG, BRE, DRA, UPL? - Subtask 1.2.2 : Long term assessment during the operation phase Subtask leader : SG SGCSTB, BRE, GDF, ECG UPL? UPLCSTBCEACUBREDRAECGGDFSGASMSIGMA 920712861610 22 Person-months per participant
6
6 WP 1 content Objectives : providing a global framework as well as a set of methodologies for in situ energy performance characterization, measurement and assessment WP 1: Specify & Define PERFORMER Framework & Methodologies Duration: 1-15 monthsLead: CSTB Task / DeliverableLeadContributors Deliver by 1. 3 - Define a robust method to identify a cost optimized performance measurement plan & produce specifications for tools to be developed on WP2 that will be applied to pilot buildings. ECGCSTB, CEA, GDF, BRE & UPL? Month 15 1.4 - Specify methodologies for energy consumption management and ensuring continuity of the performance during the operation phase CSTB 15 - Subtask 1.4.1 : Fault detection and diagnosis functionalities based on expert rules Subtask leader : GDF GDFCEA, CU, CSTB, UPL, GDF & ECG - Subtask 1.4.2 : Performance monitoring exploiting machine learning techniques Subtask leader : CEA CEACEA, ? - Subtask 1.4.3 : Real time energy management and optimized control Subtask leader : CU CUCU, CSTB? - Subtask 1.4.4 : Visualization and reporting tools Subtask leader : CSTB CSTBCU, GDF & ECG, UPL? UPLCSTBCEACUBREDRAECGGDFSGASMSIGMA 920712861610 22 Person-months per participant
7
7 Dependencies & Dependents for WP1 WP1/WP2 A high level of interaction is required in order to ensure the transfer of the methodologies to WP2 Proposition to provide intermediate deliverables for WP2 WP1/WP3&4 WP1 has to support WP3 for the deployment of the PERFORMER methodologies on demonstrators (indicators for perfromance assessment, characterization of the building and « in use » conditions and occupant’s behavior) WP1/WP5 WP1 has to provide relevant inputs for WP5, in particular general principles replicable for the development of a business model for the exploitation of the PERFORMER solution Intermediate deliverable for WP2
8
For the first 6 months, main stakes are : Task 1.1 (Global Framework - T0 ->T0+12) : Interact with WP3 in order to ensure the consistency with PERFORMER demonstrators Ensure to provide a « european view » required for a replication strategy (WP5) Fist step : All participants send to CSTB contribution about state of art Task 1.2 (Intrinsic performance - T0 –> T0+15) : Develop the 2 PERFORMER methodologies for intrinsic performance assessment Identify the way of validation (in situ experimentation and/or mockup) Task 1.3&1.4 (Cost optimized measurement plan and energy consumption management - T0+5 –> T0+15) Set up dedicated work team for the 4 subtasks, Identify the PERFORMER scientific methods (state of art required) Identify the better way of interaction with WP2 to transfer the methodologies developped WP1 implementation plan for first 6 months Asking for 3 months more in order to reinforce the link with WP2? Interaction with other WPs: WP1/WP2 : asking for 3 months more for tasks 1.2,1.3&1.4 in order to reinforce the link with WP2
9
CSTB offers its services to all players in the construction sector to improve the quality and safety of buildings.