Download presentation
Presentation is loading. Please wait.
Published byYasmin Lovings Modified over 10 years ago
1
SECURITY EVENT BRUSSELS OCTOBER 26TH, 2012 CEN CENELEC BRUSSELS Slide 1
2
TRENDS IN LIFE SAFETY AND SECURITY FUTURE DEVELOPMENTS OF SECURITY STANDARDS DOTT. ING. CARLO LOI CHAIRMAN CENELEC TC 79 CHAIRMAN IEC TC 79 BOARD DIRECTOR EURALARM BOARD DIRECTOR ANIE SICUREZZA - ITALY – Slide 2
3
SOME SECURITY MARKET CONSIDERATIONS WORLD SECURITY MARKET 100 B€ (40% IS SECURITY PROTECTION IE ALARM,ACCESS CONTROL, VVS/CCTV) EUROPE 30B€ (SECURITY PROTECTION IS 12B€) ITALY 2.0B€ - ISRAEL 2.7B€ - JAPAN 3.8B€ - RUSSIA 1.1B€ USA FIRST THEN EU THEN CHINA EUROPE 180.000 PEOPLE WORKING WORLD GROWTH PER ANNUM 5% MULTIPLE CERTIFICATION IN EU COSTS ADDITIONAL 15M€/YEAR ( ONE CERTIFICATE IN USA) Title of the presentation – Date: 15/04/2008 – Slide 3
4
CENELEC TC79 WORK DONE PROGRESS REPORT OF WORK DONE ( 2008- 2012) DOCUMENTS IN THE WORK PROGRAM = 57 DOCUMENTS COMPLETED = 35 DOCUMENTS STILL IN ACTIVE WORK STATUS INCLUDING REVISIONS OF PUBLISHED NORMS = 22 DOCUMENTS UNDER MANDATE STILL OF THE ABOVE 22 = 17 Title of the presentation – Date: 15/04/2008 – Slide 4
5
CENELEC TC 79 WORK DONE INTRUDER EN 50131 SERIES PRACTICALLY COMPLETED 90% REVISION ONGOING ALARM VERIFICATION ISSUE ALARM TRANSMISSION EN50136 SERIES COMPLETED 70% VOTE AND COMMENTS WORK Title of the presentation – Date: 15/04/2008 – Slide 5
6
CENELEC TC79 WORK DONE TVCC (VSS) EN50132 WORK IN GOOD PROGRESS 60% COMPLETED TRANSFERRED TO IEC TC79 STRONG INFLUENCE BY EUROPEAN MEMBERS AND OF PARTNER ASSOCIATION ONVIF AND PSIA SCAC CHINESE ASSOCIATION ISSUE Title of the presentation – Date: 15/04/2008 – Slide 6
7
CENELEC TC 79 WORK DONE ACCESS CONTROL EN 50133 SERIES WORK TRANSFERRED TO IECTC79 RECENT ACCELERATION OF WORK (CONVENOR PROBLEM) COMPLETED 40% VOTE AND COMMENTS WORK Title of the presentation – Date: 15/04/2008 – Slide 7
8
CENELEC TC79 WORK DONE MARC MONITORING ALARM RECEIVING CENTRES EN 50518 SERIES COMPLETED 90% VOTE AND COMMENTS AND IEC TC79 SUBMISSION PROBLEM AREA: SCOPE AND NATIONAL ACCEPTANCES Title of the presentation – Date: 15/04/2008 – Slide 8
9
CENELEC TC 79 WORK DONE OTHER SERIES SOCIAL ALARMS EN 50134 AUDIO VIDEO DOOR DEVICES EN 50486 ENVIRONMENTAL EN 50130 ALARM TERMS AND DEFINITIONS TR 50531 LIST OF INTERPRETATIONS TR 50515 GUIDELINES TO COMPLY WITH EU DIRECTIVES EN 50456 COMBINED AND INTEGRATED SYSTEMS TS 50398 Title of the presentation – Date: 15/04/2008 – Slide 9
10
CENELEC TC 79 MANDATE WORK UNDER MANDATE UNTIL 2013 INTRUDER ALARM SERIE EN 50131 ALARM TRANSMISSION EN 50136 (ALSO CEN TC72 CPD DIRECTIVE) Title of the presentation – Date: 15/04/2008 – Slide 10
11
CENELEC TC 79 AND IEC TC 79 WORK UNDER IEC TC 79 BESIDES TRANSFER FROM CLC TC79 AND ACCEPTANCE ONGOING OF INTRUDER,SOCIAL ALARMS,TRANSMISSION SERIES THERE ARE FOLLOWING IEC DEVELOPMENTS ACCESS CONTROL VIDEO SECURITY SURVEILLANCE (ex TVCC) DIGITAL DOOR LOCKS BUILDING SECURITY INTERCOM Title of the presentation – Date: 15/04/2008 – Slide 11
12
CENELEC TC79 & IEC TC 79 FUTURE DEVELOPMENT MAIN AREAS OF DEVELOPMENT IP COMMUNICATION VIDEODETECTING CAMERAS INTEROPERABILITY MARC FUNCTIONALITY SMART HOUSE EVOLUTION Title of the presentation – Date: 15/04/2008 – Slide 12
13
CENELEC TC79 & IEC TC79 FUTURE DEVELOPMENT MAIN CONCEPT DEVELOPMENT EVOLUTION OF SECURITY SYSTEMS STANDARDS : FUTURE SYSTEMS WILL NO LONGER BE BASED ON SEPARATE FUNCTIONAL SECTIONS BUT RATHER ON INTEGRATED APPLICATIONS BASED ON IP PROTOCOLS COMMUNICATION AND INTEROPERABILITY WITH ANY MARC (MONITORING ALARM RECEIVING CENTRE) Title of the presentation – Date: 15/04/2008 – Slide 13
14
CENELEC TC79 & IEC TC79 FUTURE DEVELOPMENT MAIN CONCEPT DEVELOPMENT EVOLUTION OF SECURITY SYSTEMS STANDARDS FROM DETECTORS,CONTROL UNIT TRANSMITTER- ALARM RECEIVING CENTRE-DISPATCHING -ALARM CONFIRMATION OR FALSE ALARM TO VIDEODETECTION-ALARM VERIFICATION- IPCOMMUNICATION- MONITORING ALARM RECEIVING CENTRE - DISPATCHING Title of the presentation – Date: 15/04/2008 – Slide 14
15
CENELEC TC79 & IEC TC79 FUTURE DEVELOPMENT MAIN CONCEPTS DEVELOPMENT EVOLUTION OF SECURITY SYSTEMS STANDARDS FROM ACCESS CONTROL UNITS - DATA GATHERING- TRANSMISSION- ALARM RECEIVING CENTRE-- ALARM CONFIRMATION OR FALSE ALARM TO ACCESS AND VIDEODETECTION-ALARM VERIFICATION- IPCOMMUNICATION- MONITORING ALARM RECEIVING CENTRE –SPECIFIC ACTION Title of the presentation – Date: 15/04/2008 – Slide 15
16
CENELEC TC79 & IEC TC79 FUTURE DEVELOPMENT MAIN CONCEPTS DEVELOPMENT EVOLUTION OF SECURITY SYSTEMS STANDARDS SMART HOUSE DEVELOPMENT CENELEC TC 205 IS DEVELOPING STANDARDS ON SMART HOUSE ELECTRONIC SYSTEMS CENELEC TC79 WILL CONTRIBUTE TO THE DEVELOPMENT OF STANDARDS RELATED TO SECURITY IN CLOSE COOPERATION WITH CENELEC TC 205 IN ORDER TO AVOID CONFLICTS AND DUPLICATION OF WORK Title of the presentation – Date: 15/04/2008 – Slide 16
17
CENELEC TC79 & IEC TC79 FUTURE DEVELOPMENT EVOLUTION OF SECURITY SYSTEMS STANDARDS IMPORTANT LIAISONS BY CLC TC79 AND IEC TC79 ISO225 SOCIETAL SECURITY CLC/CEN TC 4 SECURITY SERVICES CEN TC72 FIRE ALARM SYSTEMS ISOTC43 FIRE DETECTION AND ALARM SYSTEMS COESS EURALARM COORDINATION Title of the presentation – Date: 15/04/2008 – Slide 17
18
CENELEC TC 79 MAJOR ISSUES VOLUNTARY NORMS AND ADOPTION BY MEMBER STATES A GROWING DEMAND FROM THE MARKET PLACE IS TO OBTAIN A SINGLE EUROPEAN WIDE CERTIFICATE VALID AND RECOGNIZED BY ALL 33 MS BECAUSE IT IS ECONOMICALLY IMPOSSIBLE FOR AN SME TO SUSTAIN THE COST TO APPLY TO 33 COUNTRIES FOR A NATIONAL CERTIFICATE OF COMPLIANCE. THIS IS KEEPING THE MARKET FRAGMENTED!!! VOLUNTARY NORMS SHOULD ALSO BE GIVEN A LEGISLATIVE SUPPORT LIKE GRANTING LIMITED LIABILITY IN CASE OF MEETING THE EN NORMS FOR PRODUCTS AND SERVICES ALL ACROSS THE UNIQUE MARKET. THIS WOULD PUSH FOR ADOPTION OF VOLUNTARY NORMS. Title of the presentation – Date: 15/04/2008 – Slide 18
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.