Download presentation
Presentation is loading. Please wait.
Published byMartin Wigington Modified over 10 years ago
1
Interoperability problems between portuguese and spanish systems Long term interoperability PLAN TO SOLVE 5th IG meeting of South Gas Regional Initiative (S-GRI) 30 th November, 2007 Madrid
2
1 ITEM # 1: INTERCONNECTION AGREEMENT CPB 2005-002/01 Interoperability problems between Portuguese and Spanish systems Long term interoperability 5th IG meeting of South Gas Regional Initiative (S-GRI) 30 th November, 2007 Madrid
3
2 ITEM #2: HARMONISATION OF THE NOMINATION AND MATCHING PROCESS CPB 2003-002/01 Interoperability problems between Portuguese and Spanish systems Long term interoperability 5th IG meeting of South Gas Regional Initiative (S-GRI) 30 th November, 2007 Madrid
4
3 ITEM #3: CONSTRAINTS CPB 2005-003/01 5th IG meeting of South Gas Regional Initiative (S-GRI) 30 th November, 2007 Madrid Interoperability problems between Portuguese and Spanish systems Long term interoperability
5
4 ITEM #4: HARMONISATION ON GAS QUALITY CPB 2005-001/01 Interoperability problems between Portuguese and Spanish systems Long term interoperability 5th IG meeting of South Gas Regional Initiative (S-GRI) 30 th November, 2007 Madrid
6
5 ITEM #5: HARMONISATION ON UNITS CPB 2003-001/01 Interoperability problems between Portuguese and Spanish systems Long term interoperability 5th IG meeting of South Gas Regional Initiative (S-GRI) 30 th November, 2007 Madrid
7
6 ITEM #6: EDIG@S, MESSAGE TRANSMISIONEDIG@S PROTOCOLE- COMPANY’S IDENTIFIER ENCODING CPB 2003-003/01 CPB 2007-001/01 CPB 2007-003/01 Interoperability problems between Portuguese and Spanish systems Long term interoperability 5th IG meeting of South Gas Regional Initiative (S-GRI) 30 th November, 2007 Madrid
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.