Download presentation
Presentation is loading. Please wait.
Published byKarlee Dighton Modified over 10 years ago
1
Waller Creek Intake CFD Modeling and Simulation ALDEN Research Laboratory Inc. 30 Shrewsbury St., Holden, MA 01520 Preliminary Results October 5, 2009 500 Year Flow Scenario
2
CFD model geometry with proposed flood control turning vane Flood control turning vane 12 3 4 5 6
3
Isosurface plot of water colored with velocity magnitude (Isometric view) Time = 300 sec.
4
Isosurface plot of water colored with velocity magnitude (Plan view) Time = 300 sec.
5
Isosurface plot of water colored with velocity magnitude (Plan view) * same with slide 4 but different color scale Time = 300 sec.
6
Isosurface plot of water colored with water surface elevation (Isometric view) Time = 300 sec.
7
Isosurface plot of water colored with water surface elevation (Plan view) Time = 300 sec.
8
Plot of velocity contours with vectors (Slice plane cut horizontally at elevation 465 Ft.) Time = 300 sec.
9
(Slice plane cut horizontally at elevation 470 Ft.) Plot of velocity contours with vectors Time = 300 sec.
10
(Slice plane cut horizontally at elevation 476 Ft.) Plot of velocity contours with vectors Time = 300 sec.
11
(Slice plane cut vertically at the center of the morning glory spillway.) Plot of velocity contours with vectors slice plane cut locations Time = 300 sec.
12
(Slice plane cut vertically at the center of the morning glory spillway.) Plot of velocity contours with vectors slice plane cut locations Time = 300 sec.
13
Plot of velocity contours Time = 300 sec. (Slice planes cut vertically at the center of the morning glory spillway at different locations.) Isometric view 1
14
Plot of velocity contours Time = 300 sec. (Slice planes cut vertically at the center of the morning glory spillway at different locations.) Isometric view 2
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.