Zachary Tess D7 Project Manager. US 14 – New Ulm to North Mankato ADT & Serious Crashes 2009 AADT (HCAADT: 12.6%); 2007-2011 K+A Crashes.

Similar presentations


Presentation on theme: "Zachary Tess D7 Project Manager. US 14 – New Ulm to North Mankato ADT & Serious Crashes 2009 AADT (HCAADT: 12.6%); 2007-2011 K+A Crashes."— Presentation transcript:

1 Zachary Tess D7 Project Manager

2 US 14 – New Ulm to North Mankato ADT & Serious Crashes 2009 AADT (HCAADT: 12.6%); 2007-2011 K+A Crashes

3 US 14 – Recent History

4  Enforcement  Relocation of existing HEAT zone  Additional four hours of presence each day  Up from two hours per day  Funding through September of 2012  $62k per year to maintain additional presence  Signing  Additional signing to address motorist behavior Immediate Actions

5 Interim Safety Project $2.5M Construction Cost

6 Constrained

7

8 Corridor Typical - (WB Construction Shown)

9

10

11  Additional Pavement & Aggregate needs ◦ 14’ inside median vs. 4’ shoulder ◦ Loonheads – U-turns for truck/agg equipment ◦ Crown correction–cheaper than drainage structures  Still need R/W (south side utility poles)

12  Current R/W Costs - $12K/acre Provided by District Real Estate Rep  When Construction + R/W becomes equal between alternatives $46K/acre – Assumes HTCB in both alternatives $66K/acre – HTCB only in constrained

13  Constrained ◦ Pros  Less impacts to farmland/wetlands  Evaluation for other corridors statewide ◦ Cons  Higher Construction Cost  Higher Maintenance Cost  Corridor Typical ◦ Pros  Lower Construction Cost  Introduction of alternative intersection treatment types – RCUTs  Lower Maintenance Cost ◦ Cons  Additional farmland/wetland impacts

14  Construction ◦ $10M - $15M  4-lanes only  No Interchange  R/W ◦ $4M  4-lanes  Relocations  Interchange *Currently Unfunded

15  Why to west? ◦ RSA – Critical Crash rate intersections  TH 14/TH 111 in Nicollet  TH 14/TH 99 in Nicollet ◦ Local and Political Momentum  Local Infrastructure planning/needs  Wastewater treatment planning – North Mankato  City expanding  2000 population – 890  2010 population – 1100  23.5% increase

16  TH 14/TH 15 Intersection Discussion ◦ Alternatives ◦ Discussion of inclusion with MN River Bridge in New Ulm in 2018  Nicollet Bypass and funding impacts

17 Tuesday

18

19

20 Wednesday

21

22 Tuesday

23

24 Wednesday

25 Tuesday

26  Contact Information ◦ Zachary Tess – D7 Project Manager ◦ Zachary.tess@state.mn.us Zachary.tess@state.mn.us ◦ 507-304-6199  Corridor Website ◦ http://www.dot.state.mn.us/d7/projects/14newulm tonmankato/ http://www.dot.state.mn.us/d7/projects/14newulm tonmankato/

27


Download ppt "Zachary Tess D7 Project Manager. US 14 – New Ulm to North Mankato ADT & Serious Crashes 2009 AADT (HCAADT: 12.6%); 2007-2011 K+A Crashes."

Similar presentations


Ads by Google