Zachary Tess D7 Project Manager
2
US 14 – New Ulm to North Mankato ADT & Serious Crashes 2009 AADT (HCAADT: 12.6%); 2007-2011 K+A Crashes
3
US 14 – Recent History
4
Enforcement Relocation of existing HEAT zone Additional four hours of presence each day Up from two hours per day Funding through September of 2012 $62k per year to maintain additional presence Signing Additional signing to address motorist behavior Immediate Actions
5
Interim Safety Project $2.5M Construction Cost
6
Constrained
8
Corridor Typical - (WB Construction Shown)
11
Additional Pavement & Aggregate needs ◦ 14’ inside median vs. 4’ shoulder ◦ Loonheads – U-turns for truck/agg equipment ◦ Crown correction–cheaper than drainage structures Still need R/W (south side utility poles)
12
Current R/W Costs - $12K/acre Provided by District Real Estate Rep When Construction + R/W becomes equal between alternatives $46K/acre – Assumes HTCB in both alternatives $66K/acre – HTCB only in constrained
13
Constrained ◦ Pros Less impacts to farmland/wetlands Evaluation for other corridors statewide ◦ Cons Higher Construction Cost Higher Maintenance Cost Corridor Typical ◦ Pros Lower Construction Cost Introduction of alternative intersection treatment types – RCUTs Lower Maintenance Cost ◦ Cons Additional farmland/wetland impacts
14
Construction ◦ $10M - $15M 4-lanes only No Interchange R/W ◦ $4M 4-lanes Relocations Interchange *Currently Unfunded
15
Why to west? ◦ RSA – Critical Crash rate intersections TH 14/TH 111 in Nicollet TH 14/TH 99 in Nicollet ◦ Local and Political Momentum Local Infrastructure planning/needs Wastewater treatment planning – North Mankato City expanding 2000 population – 890 2010 population – 1100 23.5% increase
16
TH 14/TH 15 Intersection Discussion ◦ Alternatives ◦ Discussion of inclusion with MN River Bridge in New Ulm in 2018 Nicollet Bypass and funding impacts
17
Tuesday
20
Wednesday
22
Tuesday
24
Wednesday
25
Tuesday
26
Contact Information ◦ Zachary Tess – D7 Project Manager ◦ Zachary.tess@state.mn.us Zachary.tess@state.mn.us ◦ 507-304-6199 Corridor Website ◦ http://www.dot.state.mn.us/d7/projects/14newulm tonmankato/ http://www.dot.state.mn.us/d7/projects/14newulm tonmankato/