Download presentation
Presentation is loading. Please wait.
Published bySarai Sultan Modified over 10 years ago
1
North Central Regional Water Resources Planning Study Elaine Boyd Strategic Management Director Bureau of Environment Tennessee Department of Environment and Conservation
2
Pilot Areas North Central TN South Cumberland Plateau TN
3
Status Sequenced review of pilots Hearing concerns related to draft in multiple meetings with stakeholders Additional information provided calling for more detailed evaluation Revisiting of alternatives based on additional information
4
Alternatives Portland raw water pipeline to Cumberland River Portland contract with White House Utility District Cost Water Quality Environmental Benefits or Impacts Other Tier 2 Evaluation
5
Next Steps for Pilot Finalize pilot report reflecting a range of withdrawal options and costs o Difficulty of projecting multitude of ways to mix use of current sources (Drakes Creek and City Lake) with either alternative o Historic growth vs. current Provide to local officials as a reference for decision-making o Recommendation, not a mandate
6
Regional Water Resources Planning OASIS Training / Access Model for the state Webpage http://tn.gov/environment/regionalplanning/
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.