Dorchester County Government Officials Presentation Watershed Implementation Planning Phase II Status Mike Moulds, Local Team Coordinator October 4, 2011.

Similar presentations


Presentation on theme: "Dorchester County Government Officials Presentation Watershed Implementation Planning Phase II Status Mike Moulds, Local Team Coordinator October 4, 2011."— Presentation transcript:

1 Dorchester County Government Officials Presentation Watershed Implementation Planning Phase II Status Mike Moulds, Local Team Coordinator October 4, 2011 Mike Moulds, Local Team Coordinator October 4, 2011

2 Background 1972 Federal Clean Water Act Requires: 1972 Federal Clean Water Act Requires: Water Quality Standards Assessment (monitoring) of Waters Identification of Waters that Violate Standards –303(d) List of Impaired Waters –Identify Pollutant(s) Causing Impaired Waters Set Limits on Pollutants: Total Maximum Daily Load Court Settlement: Required Chesapeake Bay TMDLs to be completed by December 2010. Court Settlement: Required Chesapeake Bay TMDLs to be completed by December 2010. Federal Accountability Framework Clean Water Act: Bay TMDLs Federal Accountability Framework Clean Water Act: Bay TMDLs Watershed Implementation Plans Watershed Implementation Plans 2-Year Implementation Milestones 2-Year Implementation Milestones Tracking & Evaluating Progress Tracking & Evaluating Progress Federal Consequences Federal Consequences

3 Total Maximum Daily Load Total Maximum Daily Load Main Concepts of a TMDL: Main Concepts of a TMDL: TMDL: Maximum amount of pollutant that can be received by a water body and still meet standards. TMDL: Maximum amount of pollutant that can be received by a water body and still meet standards. TMDL Allocates loads among sources and geographic areas. TMDL Allocates loads among sources and geographic areas. TMDL = WLA + LA + MOS TMDL = WLA + LA + MOS –WLA: Sources with Permits (point sources) –LA: Sources without Permits (nonpoint sources) –MOS: Margin of Safety, protective of environment. TMDL is usually determined by a scientific study of the water body, often using computer models. TMDL is usually determined by a scientific study of the water body, often using computer models.

4 Watershed Implementation Plans Three-Phased Planning Process: Three-Phased Planning Process: Phase I Plans - 2010 Phase I Plans - 2010 –Nutrient and sediment target loads by sector and impaired segment –Statewide strategies for reducing loads in each source sector –Starting Point for Phase II Plans Phase II Plans – 2011/12 Phase II Plans – 2011/12 –Refined EPA Watershed Model Results –Divide loads by smaller geographic areas –More detailed strategy to meet 2017 Interim Target - 70% reduction –2-Year Milestone actions for 2012-2013 Phase III Plans – 2017 Phase III Plans – 2017 –Modification of TMDL and allocations, if necessary Identify changes needed to meet Final Target loads Identify changes needed to meet Final Target loads

5 County Phase II WIP Local Team Members Keith Lackie Maryland Department of Planning Mike Moulds Dorchester County DPW Mike Bonsteel Dorchester County Planning and Zoning Greg LeBlanc City of Cambridge Jim Newcomb Dorchester Soil Conservation District Bill Giese Blackwater Refuge William Layton/Bill Edwards Dorchester County Farm Bureau Beth Lynch Dorchester Citizens for Planned Growth Bill Forlifer Dorchester County Dept of Health Jennifer Dindinger Choptank Tributary Team Russ Brinsfield/John Avery Town of Vienna/Town of Hurlock

6 Step One: Set a Diet (Note - pollution loads not to scale.)

7 AcresPercent Agricultural*114,88632.4 Agricultural*114,886 32.4 Urban Developed 23, 154 6.5 Forest126,705 35.7 Wetland 90,267 25.4 * An estimated 90,000 acres is actively farmed. AcresPercent Agricultural*114,88632.4 Agricultural*114,886 32.4 Urban Developed 23, 154 6.5 Forest126,705 35.7 Wetland 90,267 25.4 * An estimated 90,000 acres is actively farmed. Dorchester County Land Use

8 Dorchester County TN Targets Final September 2011 Source Sector Current Load ( lbs/yr) 2020 Target Load (lbs/yr) % Reduction Agriculture1,189,678869,79427% Urban128,22694,33326% Wastewater79,92182,322+3% Septic72,45741,33643% Total1,470,2821,087,78526% Based on 5.3.2 Bay Model 2009 Baseline delivered loads to bay. Wastewater target does not include growth allocation.

9 Dorchester County P Targets Final September 2011 Source Sector Current Load ( lbs/yr) 2020 Target Load (lbs/yr) % Reduction Agriculture186,347162,30913% Urban8,7605,80734% Wastewater11,0078,34724% Septic000% Total206,114176,46314% Based on 5.3.2 Bay Model 2009 Baseline delivered loads to bay. Wastewater target does not include growth allocation.

10 Dorchester County Phase II WIP Dorchester County Phase II WIP Target Sources for Dorchester County Agricultural land Septic Systems Wastewater Point Sources Developed Urban Land Established Target Sources State-wide Major/minor point sources Urban & Agricultural Land Forests Septic Systems Atmospheric Deposition

11 IssuesIssues The County has no direct regulatory authority over our three major pollutant sectors (Agriculture, Wastewater, Septic Systems). The County has no direct regulatory authority over our three major pollutant sectors (Agriculture, Wastewater, Septic Systems). The majority of Urban Developed Land is in the incorporated City and Towns. The majority of Urban Developed Land is in the incorporated City and Towns. No county-wide system in place to track, monitor and report activities across sectors No county-wide system in place to track, monitor and report activities across sectors The County has no direct regulatory authority over our three major pollutant sectors (Agriculture, Wastewater, Septic Systems). The County has no direct regulatory authority over our three major pollutant sectors (Agriculture, Wastewater, Septic Systems). The majority of Urban Developed Land is in the incorporated City and Towns. The majority of Urban Developed Land is in the incorporated City and Towns. No county-wide system in place to track, monitor and report activities across sectors No county-wide system in place to track, monitor and report activities across sectors

12 Agricultural BMP Development Agricultural Best Management Practices (BMP) are being developed and managed by the Department of Agriculture working with the Agricultural Community and Soil Conservation Districts to meet goals for nutrient reduction. A total of 33 BMPs have initially been developed. Agricultural Best Management Practices (BMP) are being developed and managed by the Department of Agriculture working with the Agricultural Community and Soil Conservation Districts to meet goals for nutrient reduction. A total of 33 BMPs have initially been developed.

13 Examples of Agricultural BMPs No Till Farming Cover Crops Stream Protection Buffers Decision /Precision Agriculture Water Irrigation Management Nutrient Management Plans Vegetated Open Channels Heavy Use Pads Livestock/Poultry Waste Structures Manure Transport Manure Incorporation Runoff Control Systems Animal Mortality Composter

14 2,947 Septic Systems in the Critical Area 1,522 Systems within 1,000 feet of a perennial stream 2,269 Systems outside of the Critical Area and not within 1,000 feet of a perennial stream A Total of 6,738 Systems 2,947 Septic Systems in the Critical Area 1,522 Systems within 1,000 feet of a perennial stream 2,269 Systems outside of the Critical Area and not within 1,000 feet of a perennial stream A Total of 6,738 Systems Septic System BMPs

15 BMP options: Connect to sewer with ENR treatment. Convert septic to provide denitrification. Scheduled septic pump outs. BMP options: Connect to sewer with ENR treatment. Convert septic to provide denitrification. Scheduled septic pump outs. Septic BMP Development Issues and Needs: Identify future connection projects. Enable planning and inter-municipal cooperation. Develop funding mechanisms.

16 2 major plants Cambridge, Hurlock 2 major plants Cambridge, Hurlock 2 minor plants - Vienna, Twin Cities 2 minor plants - Vienna, Twin Cities 28 Minor Industrial Plants 28 Minor Industrial Plants Cambridge plant will be credited with load reduction from upgrade to ENR in 2011-12. Cambridge plant will be credited with load reduction from upgrade to ENR in 2011-12. Hurlock Plant is already a ENR plant Hurlock Plant is already a ENR plant Cambridge Combined Sewer Elimination Credit. Cambridge Combined Sewer Elimination Credit. Industrial discharger load reductions are being addressed by MDE Industrial discharger load reductions are being addressed by MDE No ENR funding is available for minor plant upgrades No ENR funding is available for minor plant upgrades ENR – Enhanced Nutrient Removal Advanced Wastewater Treatment ENR – Enhanced Nutrient Removal Advanced Wastewater Treatment 2 major plants Cambridge, Hurlock 2 major plants Cambridge, Hurlock 2 minor plants - Vienna, Twin Cities 2 minor plants - Vienna, Twin Cities 28 Minor Industrial Plants 28 Minor Industrial Plants Cambridge plant will be credited with load reduction from upgrade to ENR in 2011-12. Cambridge plant will be credited with load reduction from upgrade to ENR in 2011-12. Hurlock Plant is already a ENR plant Hurlock Plant is already a ENR plant Cambridge Combined Sewer Elimination Credit. Cambridge Combined Sewer Elimination Credit. Industrial discharger load reductions are being addressed by MDE Industrial discharger load reductions are being addressed by MDE No ENR funding is available for minor plant upgrades No ENR funding is available for minor plant upgrades ENR – Enhanced Nutrient Removal Advanced Wastewater Treatment ENR – Enhanced Nutrient Removal Advanced Wastewater Treatment Wastewater BMP Development

17 Urban BMPs Urban Areas are primarily in the City of Cambridge and Towns. Urban Areas are primarily in the City of Cambridge and Towns. Stormwater facilities in Dorchester County are not regulated by EPA as a point source. Stormwater facilities in Dorchester County are not regulated by EPA as a point source. Rural areas of the County do not have piped public stormwater facilities Rural areas of the County do not have piped public stormwater facilities Stormwater facility retrofits Street Sweeping Urban Grass Filters and Buffers Urban Tree Planting Impervious Surface Reduction Permeable pavement Urban Growth Reduction

18 Both Agricultural and Urban Land BMPs include the restoration of wetlands as a method of reducing nutrient loading. Both Agricultural and Urban Land BMPs include the restoration of wetlands as a method of reducing nutrient loading. Wetland Restoration provides for the reduction of 28.72 pounds of Nitrogen and 1.94 pounds of Phosphorus per acre. Wetland Restoration provides for the reduction of 28.72 pounds of Nitrogen and 1.94 pounds of Phosphorus per acre. EPA and MDE are also developing BMP credits for Structural and Vegetative (Living Shoreline) shore erosion protection. EPA and MDE are also developing BMP credits for Structural and Vegetative (Living Shoreline) shore erosion protection. Both Agricultural and Urban Land BMPs include the restoration of wetlands as a method of reducing nutrient loading. Both Agricultural and Urban Land BMPs include the restoration of wetlands as a method of reducing nutrient loading. Wetland Restoration provides for the reduction of 28.72 pounds of Nitrogen and 1.94 pounds of Phosphorus per acre. Wetland Restoration provides for the reduction of 28.72 pounds of Nitrogen and 1.94 pounds of Phosphorus per acre. EPA and MDE are also developing BMP credits for Structural and Vegetative (Living Shoreline) shore erosion protection. EPA and MDE are also developing BMP credits for Structural and Vegetative (Living Shoreline) shore erosion protection. Wetland Restoration and Shoreline Stabilization

19 Draft 2013 Milestones – Implementation Actions Complete city WWTP upgrade Complete city WWTP upgrade Complete city CSO elimination Complete city CSO elimination Complete conversion of 45 septic systems to sewer in Christ Rock area. Complete conversion of 45 septic systems to sewer in Christ Rock area. Complete 300 septic system upgrades in the Critical Area. Complete 300 septic system upgrades in the Critical Area. Complete construction of 12.6 acres of wetlands (Elliott Island Road project). Complete construction of 12.6 acres of wetlands (Elliott Island Road project). Complete Woolford-Madison project with conversion of 350 septic systems to sewer Complete Woolford-Madison project with conversion of 350 septic systems to sewer Complete 4.5 acres of riparian shoreline buffers Complete 4.5 acres of riparian shoreline buffers Complete 4 acres of forest area restoration Complete 4 acres of forest area restoration Increase cover crop by 30% Increase cover crop by 30% Increase HUA pads by 15% Increase HUA pads by 15% Increase streamside grass buffers by 7% Increase streamside grass buffers by 7% Increase Industrial pretreatment enforcement at Hurlock WWTP. Increase Industrial pretreatment enforcement at Hurlock WWTP.

20 Draft 2013 Milestones – Program Development Investigate funding for Oak Hill septic system connection (70 systems) Investigate funding for Oak Hill septic system connection (70 systems) Develop methods to track Develop methods to track –precision/decision agriculture –poultry manure incorporation –irrigation management Investigate development of a septic system management district. Investigate development of a septic system management district. –mandatory pump-outs –funding and administration Evaluate future growth and capacity of city WWTP. Evaluate future growth and capacity of city WWTP. Evaluate possible connection of Twin Cities to Hurlock. Evaluate possible connection of Twin Cities to Hurlock. Develop agreements to enable additional expansion of septic connection program. Develop agreements to enable additional expansion of septic connection program. Update County water/sewer plan to address septic system. conversions/connections. Update County water/sewer plan to address septic system. conversions/connections.

21 Draft 2013 Milestones – Program Development Investigate options and funding for upgrade of Vienna WWTP to ENR. Investigate options and funding for upgrade of Vienna WWTP to ENR. Review forest replacement program to accelerate vegetated buffer creation Review forest replacement program to accelerate vegetated buffer creation Develop septic system GIS mapping capability Develop septic system GIS mapping capability Evaluate expansion of urban tree canopy program. Evaluate expansion of urban tree canopy program. –Evaluate existing City and Town of Hurlock street sweeping program for potential improvements. Investigate funding for all of the above. Investigate funding for all of the above.

22 ScheduleSchedule September 15Final County Targets from MDE September 28Local Team Meeting to review revised allocations. October 4Government Officials Update October 14Submission of Draft 2012-13 Milestones to MDE October 26 Local Team completes draft WIP November 1WIP Presentation to Government Officials for Comment November 9Local Team Meeting to address comments and finalize WIP November 15Submission for Approval by County November 23Delivery to MDE Note: MDE has notified Local Team that the deadline is being extended to July 2, 2012 for a final local WIP and public comment. A more detailed schedule is being developed. September 15Final County Targets from MDE September 28Local Team Meeting to review revised allocations. October 4Government Officials Update October 14Submission of Draft 2012-13 Milestones to MDE October 26 Local Team completes draft WIP November 1WIP Presentation to Government Officials for Comment November 9Local Team Meeting to address comments and finalize WIP November 15Submission for Approval by County November 23Delivery to MDE Note: MDE has notified Local Team that the deadline is being extended to July 2, 2012 for a final local WIP and public comment. A more detailed schedule is being developed.

23 Challenges Ahead Funding! Funding! Funding! Funding! Funding! Funding! Development of Regulations and Standards Development of Regulations and Standards Staffing Staffing Tracking and Accountability Tracking and Accountability Sustaining Progress Sustaining Progress